Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6911-6920 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6046 | Project ID: 6046 DEA: 11240104 | 11-SD-5-R10.0/R20.0 | PAVEMENT REHABILITATION. | SAN DIEGO COUNTY IN NATIONAL CITY AND SAN DIEGO FROM 24TH STREET UNDERCROSSING TO 0.1 MILE SOUTH OF ROUTE 8/5 SEPARATION AND OVERHEAD | 01/06/2012 | 1 (01/09/2012) | Details CEM-3701 Report |
| 6047 | Project ID: 6047 DEA: 11240214 EFIS: 1100000166 | 11-SD-- | 1 (11/24/2020) | Details CEM-3701 Report | |||
| 6048 | Project ID: 6048 DEA: 11240304 | 11-SD-5-R 10.3 | Install Changeable Message Signs. | 07/20/2007 | 1 (11/04/2008) | Details CEM-3701 Report | |
| 6049 | Project ID: 6049 DEA: 11241104 | 11-IMP-86-19.5 | RUBBER ASPHALT CHIP SEAL | IN IMPERIAL COUNTY IN BRAWLEY AND NEAR WESTMORLAND FROM 0.5 KM NORTHOF LEGION ROAD TO SOUTH JUNCTIONROUTE 78 AND FROM LONE TREE WASH TO SAN FELIPE CREEK | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report |
| 6050 | Project ID: 6050 DEA: 11241504 | 11-SD-163- 8.3 | WIDEN BRIDGE AND RECONSTRUCT RAMPS | IN SAN DIEGO COUNTY IN SAN DIEGOFROM 0.6 KM SOUTH TO 0.3 KM NORTH OF CLAIREMONT MESA BOULEVARDOVERCROSSING | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report |
| 6051 | Project ID: 6051 DEA: 11241614 EFIS: 1100020418 | 11-SD-15-21.7/23.9 | CAMINO DEL NORTE WIDENING | IN SAN DIEGO COUNTY | 1 (04/06/2007) | Details CEM-3701 Report | |
| 6052 | Project ID: 6052 DEA: 11241924 | 11-SD-78-20.7/21.3 | WIDEN SHOULDER | IN SAN DIEGO COUNTY NEAR ESCONDIDOFROM SUMMIT DRIVE TO FLORA VISTADRIVE | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report |
| 6053 | Project ID: 6053 DEA: 11243204 | 11-SD-8-R49.0 | Safety Roadside Rest Area Restoration/ada Compliance. | 06/04/2012 | 1 (10/26/2009) | Details CEM-3701 Report | |
| 6054 | Project ID: 6054 DEA: 11244304 | 11-SD-78-12.91-15.49 | To Construct Two Railroad Bridges for the Sprinter Commuter Rail Project in City of San Marcos NCTD San Marcos Loop Br. No. 57-1105, Br. No. 57-1106 | State Highway right of way in the County of San Diego, City of San Marcos, on State Route 78, post mile 12.91-15.49 | 1 (10/26/2005) | Details CEM-3701 Report | |
| 6055 | Project ID: 6055 DEA: 11246514 | 11-SD-75-r33.0/R35.3 | REHABILITATE BRIDGE | IN SAN DIEGO COUNTY IN CORONADO AND SAN DIEGO FROM 0.6 KM NORTH OFGLORIETTA BOULEVARD TO 0.5 KM SOUTH OF ROUTE 75 AND 5 SEPARATION | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report |
