Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6871-6880 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209481 | Project ID: 209481 DEA: 034M8404 EFIS: 0313000074 | 03-NEV-80-21.2/28.1 | GRIND WEARING COURSE, PROFILE GRIND PCC, APPLY CONCRETE HARDENER | NEVADA COUNTY NEAR TRUCKEE FROM TRUCKEE RIVER BRIDGE 17-0012 TO TRUCKEE RIVER BRIDGE 17-0063 | 02/23/2016 | 1 (05/20/2014) | Details CEM-3701 Report |
| 209482 | Project ID: 209482 DEA: 041A2604 EFIS: 0400000480 | 04-SOL-80-4.0/4.3 | UPGRADE DRAINAGE SYSTEMS. | SOLANO COUNTY IN VALLEJO FROM 0.70 MILE EAST OF TENNESSEE STREET OVERCROSSING TO 0.20 MILE WEST OF REDWOOD STREET OVERCROSSING.. | 02/12/2015 | 1 (06/20/2014) | Details CEM-3701 Report |
| 209483 | Project ID: 209483 DEA: 050R5304 EFIS: 0500000365 | 05-MON,SLO-1,101-Var | CONSTRUCT CURB RAMPS, SIDEWALKS AND MODIFY SIGNAL AND LIGHTING, | MONTEREY AND SAN LUIS OBISPO COUNTIES AT VARIOUS LOCATIONS | 08/04/2015 | 1 (08/01/2014) | Details CEM-3701 Report |
| 209484 | Project ID: 209484 DEA: 051C9004 EFIS: 0513000008 | 05-SLO-46-50.2/60.9 | RESURFACE EXISTING PAVEMENT WITH GAP GRADED RHMA. | SAN LUIS OBISPO COUNTY NEAR CHOLAME FROM 0.3 MILE WEST OF LUCY BROWN ROAD TO KERN COUNTY LINE | 10/14/2019 | 1 (07/01/2014) | Details CEM-3701 Report |
| 209516 | Project ID: 209516 DEA: 020H1404 EFIS: 0214000132 | 02-TEH-32,032-22.35/22.75 | Improve catchment | In Tehama County about 37 miles east of Forest Ranch from 0.6 mile west of 0.1 mile West of Deer Creek Bridge | 12/21/2020 | 1 (06/20/2014) | Details CEM-3701 Report |
| 209485 | Project ID: 209485 DEA: 051F4804 EFIS: 0514000001 | 05-SB-101-47.3/47.9 | PLACE HIGH FRICTION SURFACE TREATMENT ON EXISTING ROADBED. | SANTA BARBARA COUNTY AT GAVIOTA FROM 0.1 MILE NORTH OF GAVIOTA CREEK BRIDGE TO 1.0 MILE SOUTH OF LAS CRUCES ROUTE 1/101 SEPARATION | 08/21/2018 | 1 (07/11/2014) | Details CEM-3701 Report |
| 209486 | Project ID: 209486 DEA: 060E6804 EFIS: 0612000085 | 06-MAD-99-R1.0-28.2 | PAINT BRIDGES. | MADERA COUNTY IN MADERA,CHOWCHILA AND AT FAIRMEAD AT VARIOUS LOCATIONS FROM AVENUE 7 OVERCROSSING TO LE GRAND AVENUE OVERCROSSING. | 02/23/2016 | 1 (12/26/2014) | Details CEM-3701 Report |
| 209487 | Project ID: 209487 DEA: 071W5904 EFIS: 0712000362 | 07-LA-10,39,210,605-Var | TREAT BRIDGE DECK WITH METHACRYLATE AND REPLACE JOINT SEALS. | LOS ANGELES COUNTY AT VARIOUS LOCATIONS | 01/21/2016 | 1 (06/04/2014) | Details CEM-3701 Report |
| 209488 | Project ID: 209488 DEA: 071W6504 EFIS: 0712000451 | 07-LA-101,134-Various | TREAT BRIDGE DECK WITH METHACRYLATE AND REPLACE JOINT SEALS. | LOS ANGELES COUNTY AT VARIOUS LOCATIONS | 01/21/2016 | 1 (06/05/2014) | Details CEM-3701 Report |
| 209489 | Project ID: 209489 DEA: 074T6804 EFIS: 0713000323 | 07-LA-105-R0.9,R4.7 | APPLY HIGH FRICTION SURFACE TREATMENT AND CONSTRUCT CURB RAMP. | LOS ANGELES COUNTY IN EL SEGUNDO AND HAWTHORNE AT EASTBOUND IMPERIAL HIGHWAY ONRAMP AND CRENSHAW BOULEVARD ONRAMP | 12/08/2015 | 1 (06/17/2014) | Details CEM-3701 Report |
