Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6841-6850 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213297 | Project ID: 213297 DEA: 010H3704 EFIS: 0117000165 | 01-LAK-20-33.6/37.1,45.2/46.5 | RUBBERIZED HOT MIX ASPHALT - GAP GRADED AND MIDWEST GUARDRAIL SYSTEM | LAKE COUNTY NEAR CLEARLAKE OAKS FROM 0.6 MILE EAST OF NEW LONG VALLEY ROAD TO NORTH FORK CACHE CREEK BRIDGE AND FROM 1.4 MILES EAST OF ABBOT MINE ROAD TO COLUSA COUNTY LINE | 12/04/2018 | 1 (04/27/2018) | Details CEM-3701 Report |
| 5 | Project ID: 5 DEA: 010A0604 EFIS: 0100020015 | 01-LAK-20-31.8/37.1 | COLD IN-PLACE RECYCLE WITH HMA OVERLAY | LAKE COUNTY NEAR CLEARLAKE OAKS FROM 0.2 MILE EAST OF ROUTE 20/53 JUNCTION TO NORTH FORK CACHE CREEK BRIDGE | 12/10/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 993309 | Project ID: 993309 DEA: 010G5504 EFIS: 0117000018 | 01-LAK-20-26.6 | INSTALL GUARDRAIL | LAKE COUNTY NEAR CLEARLAKE OAKS AT BERYL WAY | 07/21/2022 | 1 (10/18/2021) | Details CEM-3701 Report |
| 210525 | Project ID: 210525 DEA: 010A6904 | 01-LAK-20-1.1/3.9 | INSTALL METAL BEAM GUARD RAIL | LAKE COUNTY NEAR BLUE LAKE FROM 1.1 MILES EAST OF MENDOCINO COUNTY LINE TO 0.3 MILE EAST OF SCOTTS VALLEY ROAD | 08/24/2018 | 1 (09/23/2015) | Details CEM-3701 Report |
| 212472 | Project ID: 212472 DEA: 010B6904 EFIS: 0112000184 | 01-LAK-29-R41.4 | WIDEN ROADWAY, CONSTRUCT PEDESTRIAN FACILITIES | LAKE COUNTY IN LAKEPORT AT LAKEPORT BOULEVARD OVERCROSSING | 02/26/2019 | 1 (10/03/2017) | Details CEM-3701 Report |
| 6 | Project ID: 6 DEA: 010A0704 EFIS: 0100020016 | 01-LAK-29-R40.6/R48.4 | REPAIR ROADWAY | LAKE COUNTY IN AND NEAR LAKEPORT FROM 0.5 MILE NORTH OF ROUTE 175 TO 0.5 MILE NORTH OF LUCERNE UNDERCROSSING | 03/11/2011 | 1 (05/18/2010) | Details CEM-3701 Report |
| 68 | Project ID: 68 DEA: 013986U4 EFIS: 0100020263 | 01-LAK-53-2.8/7.5 | WIDEN ROADWAY WITH HMA OVER AB. | LAKE COUNTY IN AND NEAR CLEARLAKE FROM 0.1 MILE SOUTH OF 40TH AVENUE/LAKESHORE DRIVE TO ROUTE 20/53 JUNCTION | 01/30/2015 | 1 (12/10/2012) | Details CEM-3701 Report |
| 215651 | Project ID: 215651 DEA: 010K4604 EFIS: 0120000100 | 01-LAK-20-37.0/41.7 | REPLACE ASPHALT CONCRETE SURFACING, COLD PLANE AND PLACE RHMA. | LAKE COUNTY FROM THE NORTH FORK CACHE CREEK BRIDGE TO 4.78 MILES WEST OF COLUSA COUNTY LINE | 11/22/2021 | 1 (04/07/2021) | Details CEM-3701 Report |
| 215703 | Project ID: 215703 DEA: 010K5004 EFIS: 0120000107 | 01-LAK-20-12.2/46.0 | REMOVE, ABANDON, AND REPLACE DRAINAGE FACILITIES. | LAKE COUNTY AT VARIOUS LOCATIONS ON ROUTE 20 FROM 0.4 MILE EAST OF PYLE ROAD/NICE-LUCERNE CUTOFF TO 0.5 MILE WEST OF END OF COUNTY | 11/22/2021 | 1 (04/30/2021) | Details CEM-3701 Report |
| 88 | Project ID: 88 DEA: 01425004 | 01-LAK-20-2.0/30.4 | Construct Nine Turnouts | Lake County at various locations from 2.0 miles East of the Lake/Mendocino County Line to 1.2 miles West of Route 20/53. | 12/16/2009 | 1 (12/16/2009) | Details CEM-3701 Report |
