Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6811-6820 of 19060 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6857 | Project ID: 6857 EFIS: 0000001155 Permit Numbers: 0407NSN1169 | 04-ALA-185-3.2/3.7 | Replace the existing street light. | Unlisted, San Leandro | 08/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 6858 | Project ID: 6858 DEA: 043A7734 Permit Numbers: 0412NRT0901 0412NRT0913 0411NDP1529 0410NMC0139 | 04-CC--0/5 | The purpose of the I-80 Integrated Corridor Mobility (ICM) Traffic Signal Light Synchronization project (TLSP) is to assist in monitoring, and managing the traffic flow along the I-80 and State Route 123 corridor. | I-80 AND SR 123, Var | 08/16/2013 | 1 (12/21/2012) | Details CEM-3701 Report |
| 6859 | Project ID: 6859 EFIS: 0000001155 Permit Numbers: 1209NMC0151 | 12-ORA-39-15.573/15.573 | Perform street improvements along Artesia Blvd including pavement rehabilitation at the Artesia Blvd/Knott Avenue intersection; pavement rehabilitation and modification to the east leg of the intersection at Artesia Blvd/Firestone Blvd/I-5 Northbound Ramp | ARTESIA BLVD, BUENA PARK | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 6860 | Project ID: 6860 DEA: 04448834 EFIS: 0400021235 | 04-SCL-152-6.1/6.5 | PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM | SANTA CLARA COUNTY IN GILROY FROM 0.3 MILE WEST OF UVAS CREEK BRIDGE TO 0.1 MILE EAST OF UVAS CREEK BRIDGE | 08/21/2018 | 1 (05/09/2012) | Details CEM-3701 Report |
| 6861 | Project ID: 6861 DEA: 080P8004 EFIS: 0800020032 | 08-RIV-15-8.0/50.0 | REPLACE VARIOUS SLABS | RIVERSIDE COUNTY IN RIVERSIDE, CORONA AND MURRIETA FROM 0.3 MILE NORTH OF RAINBOW VALLEY BOULEVARD OVERCROSSING TO 0.7 MILE NORTH OF BELLEGRAVE AVENUE. | 11/08/2012 | 1 (03/09/2012) | Details CEM-3701 Report |
| 6862 | Project ID: 6862 DEA: 024E2204 EFIS: 0200020239 | 02-TEH-99-0.0/10.82 | CONSTRUCT GROUND IN RUMBLE STRIP ON HIGHWAY SHOULDERS AND CENTERLINE | 11/05/2020 | 2 (06/20/2014) | Details CEM-3701 Report | |
| 6863 | Project ID: 6863 DEA: 11367504 EFIS: 1100020427 MINOR: 11A1922 | 11-SD-52-7.2 | Install Joint Seal System | IN SAN DIEGO COUNTY IN SAN DIEGO ON EASTBOUND 52 TO NORTHBOUND 15 CONNECTOR RAMP | 2 (11/01/2010) | Details CEM-3701 Report | |
| 6864 | Project ID: 6864 DEA: 060M1904 EFIS: 0600000951 | 06-TUL-190-16.5 | Construct Concrete Barrier | At Main Street in Porterville, Tulare Co. CA | 09/14/2020 | 1 (10/10/2011) | Details CEM-3701 Report |
| 6865 | Project ID: 6865 DEA: 050R9904 EFIS: 0500000395 MINOR: 05A1454 | 05-SB--R8.9 | Hwy. 156 Highway Lighting | Near Hollister at Buena Vista Rd. | 05/23/2019 | 1 (01/30/2012) | Details CEM-3701 Report |
| 6866 | Project ID: 6866 EFIS: 0000001155 Permit Numbers: 04116DP0693 | 04-SCL-101-0/17.82 | Minor Roadway widening | Cochrane Road / Route 101 interchange, Morgan Hill | 08/21/2018 | NOT VERIFIED | Details CEM-3701 Report |
