Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6811-6820 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212753 | Project ID: 212753 DEA: 020H7604 EFIS: 0215000086 | 02-LAS,PLU-VAR-VAR | FULL DEPTH RECLAMATION AND DRAINAGE REHABILITATION | LASSEN AND PLUMAS COUNTIES AT AND NEAR CHILCOOT FROM 0.9 MILE WEST OF SUMMIT SCHOOL DRIVE TO 0.7 MILE EAST OF ROUTE 395 | 09/02/2020 | 1 (01/08/2019) | Details CEM-3701 Report |
| 210908 | Project ID: 210908 DEA: 024E8004 | 02-SIS-161-2.7/4.5 | FULL DEPTH RECLAMATION WITH CEMENT AND PLACE HOT MIX ASPHALT | IN SISKIYOU COUNTY ABOUT 5 MILESEAST OF DORRIS FROM 2.7 MILESEAST TO 4.5 MILES EAST OF ROUTE 97. | 08/01/2018 | 1 (02/17/2016) | Details CEM-3701 Report |
| 1001616 | Project ID: 1001616 DEA: 061C0604 EFIS: 0621000014 | 06-KER-223-1.8/10.4 | FULL DEPTH RECYCLE AND V-DITCHES. | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 223/5 SEPARATION TO 0.1 MILE WEST OF ROUTE 223/99 SEPARATION | 1 (10/06/2025) | Details CEM-3701 Report | |
| 1001669 | Project ID: 1001669 DEA: 09379004 | 09-INY-395-R65.0/76.0 | FULL DEPTH RECYCLING, COLD PLANE, HMA AND CURB RAMPS. | INYO COUNTY AT AND NEAR INDEPENDENCE FROM 3 MILES SOUTH OF MANZANAR REWARD ROAD TO 0.3 MILE NORTH OF SHABBELL LANE | 1 (10/13/2025) | Details CEM-3701 Report | |
| 1001563 | Project ID: 1001563 DEA: 020J5504 EFIS: 0219000135 | 02-SIS-161-4.5/9.1 | FULL DEPTH RECYCLING-CEMENT, PLACE HMA & REPLACE INTERPRETIVE DISPLAY. | SISKIYOU COUNTY NEAR DORRIS FROM 4.5 MILES EAST OF ROUTE 97 TO 2.1 MILES WEST OF FUGATE ROAD | 1 (09/02/2025) | Details CEM-3701 Report | |
| 995543 | Project ID: 995543 Permit Numbers: 0722NSN4043 | 07-LA-405-22.23 | Full traffic signal modification, including new signal poles and equipment, signal cabinet, conduit and conductors. | At the intersection of Century Boulevard and I-405 northbound on/off ramp. | 02/29/2024 | 1 (12/19/2023) | Details CEM-3701 Report |
| 995544 | Project ID: 995544 Permit Numbers: 0722NMC4045 | 07-LA-405-23.35 | Full traffic signal modification, including new signal poles and equipment, signal cabinet, conduit and conductors. | At the intersection of La Cienega Boulevard and Manchester Boulevard. | 06/28/2024 | 1 (12/19/2023) | Details CEM-3701 Report |
| 768 | Project ID: 768 DEA: 031C8014 Permit Numbers: 0307NSN0739 | 03-SAC-51-6.8 | FULTON AVE EXTENSION- RAMP MODIFICAITON AND NEW SIGNAL INSTALLATION AT SR51 AND FULTON | 10/21/2010 | NOT VERIFIED | Details CEM-3701 Report | |
| 1000230 | Project ID: 1000230 DEA: 081N2204 EFIS: 0822000120 | 08-SBD-66,215-Var | FURNISH & PLACE POLYESTER CONC OVERLAY, FURNISH BR DECK TREATMENT MTL. | SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS | 04/29/2025 | 1 (05/15/2024) | Details CEM-3701 Report |
| 214117 | Project ID: 214117 DEA: 031G5804 EFIS: 0319000043 | 03-PLA,NEV-80-68.5/69.8,0.0/13.3 | FURNISH & PLACE POLYESTER CONCRETE INLAY | PLACER AND NEVADA COUNTIES IN AND NEAR TRUCKEE FROM TROY UNDERCROSSING TO 0.1 MILE EAST OF DONNER PASS OVERCROSSING | 03/19/2021 | 1 (05/15/2019) | Details CEM-3701 Report |
