Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6811-6820 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211871 | Project ID: 211871 DEA: 022H3304 | 02-LAS,MOD-395-119.0/128.7,39.9/61.6 | ASPHALT-RUBBER CHIP SEAL, REPLACE AC SURFACING, STRIPING | LASSEN AND MODOC COUNTIES ON ROUTE 395 FROM 1.7 MILES SOUTH OF FILLMAN ROAD TO 0.4 MILE SOUTH OF ASH VALLEY ROAD AND FROM COUNTY ROAD 133A TO OREGON STATE LINE | 10/25/2017 | 1 (07/27/2017) | Details CEM-3701 Report |
| 212496 | Project ID: 212496 DEA: 024E4504 EFIS: 0200020286 | 02-LAS,MOD-139,299-VAR | PLACE HMA, REPLACE DRAINAGE, CULVERT, ELECTRICAL AND LIGHTING SYSTEMS. | LASSEN AND MODOC COUNTIES ON ROUTE 139 AT 0.1 MILE NORTH OF LASSEN COUNTY LINE AND ON ROUTE 299 AT VARIOUS LOCATONS FROM 0.4 MILE WEST OF BOYD HILL LOOKOUT ROAD TO 0.6 MILE EAST OF COUNTY ROAD 87 | 08/14/2023 | 1 (06/06/2017) | Details CEM-3701 Report |
| 215393 | Project ID: 215393 DEA: 021J5104 EFIS: 0220000086 | 02-LAS,MOD-139-57.0/66.635,0.0/0.1 | PERFORM COLD IN-PLACE RECYCLING AND PLACE HOT MIX ASPHALT (TYPE A). | LASSEN AND MODOC COUNTIES NEAR ADIN FROM 4.5 MILES SOUTH OF COUNTY ROAD A2 TO 0.1 MILE SOUTH OF ROUTE 299 | 11/24/2021 | 1 (01/07/2021) | Details CEM-3701 Report |
| 6918 | Project ID: 6918 DEA: 023E8804 EFIS: 0200020202 | 02-LAS,MOD-139-0.0/2.0,20.7/27.9 | HMA THIN BLANKET OVERLAY WITH DIGOUTS | LASSEN AND MODOC COUNTIES FROM ROUTE 36 TO 1.4 MILES NORTH OF HALL STREEET AND FROM 1.1 MILES SOUTH OF HORSE CAMP ROAD TO TIONESTA ROAD | 09/28/2012 | 1 (08/14/2012) | Details CEM-3701 Report |
| 3649 | Project ID: 3649 EFIS: 0000001155 Permit Numbers: 07086MC1213 | 07-VEN-101-15.66/15.89 | Widen the Las Posas Road Off-Ramp from N/B Route 101. | Las Posas Road, Camarillo | 01/03/2011 | NOT VERIFIED | Details CEM-3701 Report |
| 210161 | Project ID: 210161 DEA: 031E0901 EFIS: 0312000116 | 03-BUT-162- | MIDDLE FORK FEATHER RIVER BRIDGE -Bidwell Bar Bridge | Lake Oroville | 1 (02/05/2015) | Details CEM-3701 Report | |
| 210062 | Project ID: 210062 DEA: 040J8804 EFIS: 0414000096 COOP: 042516 | 04-ALA-880-30.9/31.5 | Lake Merritt to Bay Trail Bicycle Pedestrian Bridge | 1 (09/16/2019) | Details CEM-3701 Report | ||
| 6646 | Project ID: 6646 DEA: 120H5604 EFIS: 1200000225 | 12-ORA-133-11.4/13.0 | Roadway Improvements | Lake Forest Dr. to Rt 405 | 12/31/2010 | 1 (06/12/2012) | Details CEM-3701 Report |
| 4569 | Project ID: 4569 EFIS: 0000001155 Permit Numbers: 08046MC0989 | 08-RIV-74-17.97/18. | LAKE ELSINORE | 07/28/2010 | NOT VERIFIED | Details CEM-3701 Report | |
| 248 | Project ID: 248 DEA: 01479204 EFIS: 0100020269 | 01-LAK-29,53-20.1/20.4,0.0/2.9 | REPLACE OGAC, INSTALL IN-GROUND RUMBLE STRIP, RECONSTRUCT MBGR | LAKE COUNTY ON ROUTE 29, FROM 0.2 MILE SOUTH OF ROUTE 53 TO 0.1 MILE NORTH OF ROUTE 53; ON ROUTE 53, FROM ROUTE 29 TO 0.1 MILE SOUTH OF 40TH AVENUE | 04/05/2013 | 1 (10/17/2011) | Details CEM-3701 Report |
