Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6781-6790 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 8204 | Project ID: 8204 Permit Numbers: 1010NMC0327 | 10-AMA-104-9.9 | Realign segment of Prospect Drive to connect to State Route (SR) 104 across from Bowers Drive creating a 4-way intersection in the City of Sutter Creek in Amador County. Two (2) way stop control on Bowers Drive and newly aligned Prospect Drive shall remain at this intersection. Intersection shall b | SR 104, Sutter Creek | 1 (11/21/2014) | Details CEM-3701 Report | |
| 7645 | Project ID: 7645 EFIS: 0000001155 Permit Numbers: 1010NMC0327 1012NDP0510 | 10-AMA-104-9.883/9.883 | Realign segment of Prospect Drive to connect to State Route (SR) 104 across from Bowers Drive creating a 4-way intersection in the City of Sutter Creek in Amador County. Two (2) way stop control on Bowers Drive and newly aligned Prospect Drive shall remain | SR 104, Sutter Creek | 02/24/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 211070 | Project ID: 211070 DEA: 080Q3004 EFIS: 0800020191 | 08-SBD-138-R17.1/R19.2 | REALIGN SECTION OF STATE ROUTE 138 | Near Hesperia from 1.9 mi East of Route 15 to 0.1 mi West of Summit Post Office Road to realign sections of State Route 138 | 09/28/2020 | 1 (04/27/2016) | Details CEM-3701 Report |
| 7613 | Project ID: 7613 DEA: 071218W4 EFIS: 0700021119 | 07-LA-5-29.4/31.6 | REALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS. | LOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING | 07/31/2023 | 1 (10/08/2012) | Details CEM-3701 Report |
| 211 | Project ID: 211 DEA: 01474804 EFIS: 0100000330 | 01-MEN-1-38.5/38.9 | REALIGN ROADWAY, PLACE HMA OVER AB AND INSTALL DRAINAGE SYSTEMS. | MENDOCINO COUNTY NEAR ELK FROM 1.7 MILES TO 1.4 MILES SOUTH OF NAVARRO RIVER BRIDGE | 09/28/2012 | 1 (10/27/2011) | Details CEM-3701 Report |
| 213573 | Project ID: 213573 DEA: 11416604 EFIS: 1113000090 | 11-SD-94-29.4/29.7 | REALIGN ROADWAY, HMA PAVING, HFST, DRAINAGE WORK | SAN DIEGO COUNTY NEAR DULZURA FROM 0.3 MILE EAST OF GRANDE CREEK BRIDGE TO 0.1 MILE WEST OF MARRON VALLEY ROAD | 08/24/2021 | 1 (03/01/2019) | Details CEM-3701 Report |
| 214874 | Project ID: 214874 DEA: 022H0504 EFIS: 0216000093 | 02-TRI-36-R34.8/R35.4 | REALIGN ROADWAY, DRAINAGE, GUARDRAIL, AND EROSION CONTROL. | TRINITY COUNTY ABOUT 15 MILES WEST OF PLATINA FROM 3.6 MILES TO 2.9 MILES WEST OF HAYFORK CREEK BRIDGE. | 09/27/2021 | 1 (05/26/2020) | Details CEM-3701 Report |
| 993382 | Project ID: 993382 DEA: 031H2404 EFIS: 0316000077 | 03-PLA-49-2.2/2.4 | REALIGN ROADWAY, CONSTRUCT ROUNDABOUT AND RELOCATE SEWER LINES. | PLACER COUNTY IN AUBURN FROM 0.1 MILE SOUTH OF THE INTERSECTION OF ROUTE 49 AND LINCOLN WAY / BORLAND AVENUE TO LINCOLN WAY | 1 (11/08/2021) | Details CEM-3701 Report | |
| 208920 | Project ID: 208920 DEA: 080K3104 EFIS: 0800000340 | 08-SBD-95-51.2/51.7 | REALIGN ROADWAY WITH HMA OVER AGGREGATE BASE. | SAN BERNARDINO COUNTY FROM 13.9 MILES NORTH OF HAVASU LAKE ROAD TO 5.5 MILES SOUTH OF ROUTE 40/95 SEPARATION | 02/27/2015 | 1 (10/08/2013) | Details CEM-3701 Report |
| 449 | Project ID: 449 DEA: 021E1104 | 02-SHA-5-R28.9/R29.3 | REALIGN ROADWAY WITH HMA CONSTRUCT | 03/11/2011 | 1 (12/09/2009) | Details CEM-3701 Report |
