Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 6781-6790 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
8204Project ID: 8204
Permit Numbers: 1010NMC0327
10-AMA-104-9.9Realign segment of Prospect Drive to connect to State Route (SR) 104 across from Bowers Drive creating a 4-way intersection in the City of Sutter Creek in Amador County. Two (2) way stop control on Bowers Drive and newly aligned Prospect Drive shall remain at this intersection. Intersection shall bSR 104, Sutter Creek 1 (11/21/2014)Details CEM-3701 Report
7645Project ID: 7645
EFIS: 0000001155
Permit Numbers: 1010NMC0327 1012NDP0510
10-AMA-104-9.883/9.883Realign segment of Prospect Drive to connect to State Route (SR) 104 across from Bowers Drive creating a 4-way intersection in the City of Sutter Creek in Amador County. Two (2) way stop control on Bowers Drive and newly aligned Prospect Drive shall remainSR 104, Sutter Creek02/24/2014NOT VERIFIEDDetails CEM-3701 Report
211070Project ID: 211070
DEA: 080Q3004
EFIS: 0800020191
08-SBD-138-R17.1/R19.2REALIGN SECTION OF STATE ROUTE 138Near Hesperia from 1.9 mi East of Route 15 to 0.1 mi West of Summit Post Office Road to realign sections of State Route 13809/28/20201 (04/27/2016)Details CEM-3701 Report
7613Project ID: 7613
DEA: 071218W4
EFIS: 0700021119
07-LA-5-29.4/31.6REALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS.LOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING07/31/20231 (10/08/2012)Details CEM-3701 Report
211Project ID: 211
DEA: 01474804
EFIS: 0100000330
01-MEN-1-38.5/38.9REALIGN ROADWAY, PLACE HMA OVER AB AND INSTALL DRAINAGE SYSTEMS.MENDOCINO COUNTY NEAR ELK FROM 1.7 MILES TO 1.4 MILES SOUTH OF NAVARRO RIVER BRIDGE09/28/20121 (10/27/2011)Details CEM-3701 Report
213573Project ID: 213573
DEA: 11416604
EFIS: 1113000090
11-SD-94-29.4/29.7REALIGN ROADWAY, HMA PAVING, HFST, DRAINAGE WORKSAN DIEGO COUNTY NEAR DULZURA FROM 0.3 MILE EAST OF GRANDE CREEK BRIDGE TO 0.1 MILE WEST OF MARRON VALLEY ROAD08/24/20211 (03/01/2019)Details CEM-3701 Report
214874Project ID: 214874
DEA: 022H0504
EFIS: 0216000093
02-TRI-36-R34.8/R35.4REALIGN ROADWAY, DRAINAGE, GUARDRAIL, AND EROSION CONTROL.TRINITY COUNTY ABOUT 15 MILES WEST OF PLATINA FROM 3.6 MILES TO 2.9 MILES WEST OF HAYFORK CREEK BRIDGE.09/27/20211 (05/26/2020)Details CEM-3701 Report
993382Project ID: 993382
DEA: 031H2404
EFIS: 0316000077
03-PLA-49-2.2/2.4REALIGN ROADWAY, CONSTRUCT ROUNDABOUT AND RELOCATE SEWER LINES.PLACER COUNTY IN AUBURN FROM 0.1 MILE SOUTH OF THE INTERSECTION OF ROUTE 49 AND LINCOLN WAY / BORLAND AVENUE TO LINCOLN WAY 1 (11/08/2021)Details CEM-3701 Report
208920Project ID: 208920
DEA: 080K3104
EFIS: 0800000340
08-SBD-95-51.2/51.7REALIGN ROADWAY WITH HMA OVER AGGREGATE BASE.SAN BERNARDINO COUNTY FROM 13.9 MILES NORTH OF HAVASU LAKE ROAD TO 5.5 MILES SOUTH OF ROUTE 40/95 SEPARATION02/27/20151 (10/08/2013)Details CEM-3701 Report
449Project ID: 449
DEA: 021E1104
02-SHA-5-R28.9/R29.3REALIGN ROADWAY WITH HMA CONSTRUCT 03/11/20111 (12/09/2009)Details CEM-3701 Report