Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6771-6780 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213153 | Project ID: 213153 DEA: 044S7804 EFIS: 0400020145 | 04-MRN-1-24.7 | REPLACE EXISTING CULVERTS WITH 36' REINFORCED CONCRETE SLAB BRIDGE. | MARIN COUNTY NEAR OLEMA AT 1.8 MILES SOUTH OF SIR FRANCIS DRAKE BOULEVARD | 10/17/2019 | 1 (06/12/2018) | Details CEM-3701 Report |
| 213152 | Project ID: 213152 DEA: 032F5904 EFIS: 0300020624 | 03-YUB,NEV-20-20.1/21.7, 0.0/0.1 | CURVE REALIGNMENT AND SHOULDER WIDENING | YUBA AND NEVADA COUNTIES NEAR SMARTSVILLE FROM 0.5 MILE WEST OF MCGANNEY LANE TO MOONEY FLAT ROAD | 12/06/2021 | 1 (04/24/2018) | Details CEM-3701 Report |
| 213151 | Project ID: 213151 DEA: 021H9504 | 02-SIS-3,5-VAR | POLYESTER CONCRETE OVERLAY, JOINT SEAL & BEARING REPAIR, & AC CONFORM. | SISKIYOU COUNTY AT VARIOUS LOCATIONS | 12/26/2018 | 1 (08/29/2018) | Details CEM-3701 Report |
| 213150 | Project ID: 213150 DEA: 081J9304 | 08-SBD-15-160.80 | Abandon the existing well and drill a new well to be connected to the existing system. | 1 (03/20/2018) | Details CEM-3701 Report | ||
| 213149 | Project ID: 213149 DEA: 043K9704 EFIS: 0417000227 Permit Numbers: 0418NOP2127 | 04-SM-101-6.2 | Construct a joint-use path (Pedestrian under-crossing) under US 101 from Bair Island Road to Convention Way. The Bair Island Road US 101 Undercrossing Project (Project), will connect Bair Island Road east of US 101 | Redwood City, Bair Island Rd connect with Convention Way under 101 | 11/16/2021 | 2 (02/21/2018) | Details CEM-3701 Report |
| 213148 | Project ID: 213148 DEA: 060W1600 EFIS: 0617000097 | 06-KER-5-R7.5/R9.0 | REPAIR REINFORCED CONCRETE BOX CULVERTS. | KERN COUNTY NEAR GRAPEVINE AT VARIOUS LOCATIONS FROM 2.5 MILES NORTH OF FORT TEJON OVERCROSSING TO 1.2 MILES SOUTH OF GRAPEVINE UNDERCROSSING. | 08/02/2023 | 1 (09/25/2018) | Details CEM-3701 Report |
| 213147 | Project ID: 213147 Permit Numbers: 0416NSN2566 0418NRW0226 | 04-MRN-101-3.5/3.5 | Installation of enhanced pedestrian lighting at the US 101 Underpass Tunnel / Bridge Blvd/Donahue St. in Marin City as shown on the attached plans. | Bridge Blyd / US 101 Undercrossing, Mann City | 11/30/00-1 | 1 (11/08/2019) | Details CEM-3701 Report |
| 213146 | Project ID: 213146 Permit Numbers: 0417NUC2741 | 04-SM-82-24.3/24.3 | The work that will be performed is located on Mission Street between the two driveways that provide access to 6967 Mission Street. The contractor will construct a new pole foundation 5 ft east of the existing streetlight location, relocate the existing streetlight fixture and pole, abandon the exis | 6967 Mission Street , Daly City | 11/30/00-1 | 1 (11/08/2019) | Details CEM-3701 Report |
| 213145 | Project ID: 213145 Permit Numbers: 0415NSI2598 0417NRT1440 04186DP0363 | 04-SM-380-6.6/6.6 | Upgrade an existing traffic signal system at S. Airport Blvd./North Access Rd. intersection with new signals; install new median and sidewalk curb ramps; resurface and re-stripe, on State Highway 04-SM-380, Post Mile 6.6, in the City of South San Francisco. | South Airport Blvd, South San Francisco | 01/22/2020 | 1 (02/21/2018) | Details CEM-3701 Report |
| 213144 | Project ID: 213144 MINOR: 05A2042 | 05-MON-101-85.6/R91.3 | 09/06/2019 | NOT VERIFIED | Details CEM-3701 Report |
