Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6731-6740 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6849 | Project ID: 6849 DEA: 11298404 EFIS: 1100000416 | 11-SD-54,125-5.3/6.4,9.2/9.7 | INSTALL CONCRETE BARRIER. | SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 54 FROM 0.3 MILE EAST OR BRIARWOOD ROAD OVERCROSSING TO 0.4 MILE EAST OF SWEETWATER ROAD UNDERCROSSING AND ON ROUTE 125 FROM 0.5 MILE WEST OF ELKELTON PLACE UNDERCROSSING TO ELKELTON PLACE UNDERCROSSING | 11/01/2012 | 1 (11/07/2012) | Details CEM-3701 Report |
| 6850 | Project ID: 6850 DEA: 120L6404 EFIS: 1200020104 | 12-ORA-1-23.7/25.9 | RUBBERIZED HOT MIX ASPHALT OVERLAY | ORANGE COUNTY IN HUNTINGTON BEACH FROM BEACH BOULEVARD TO GOLDENWEST STREET | 05/29/2013 | 1 (07/22/2012) | Details CEM-3701 Report |
| 6852 | Project ID: 6852 EFIS: 0000001155 Permit Numbers: 1211NSN0214 | 12-ORA-405-22.643/22.643 | REMOVE AND REPLACE A TRAFFIC SIGNAL POLE ON SEAL BEACH BLVD NEAR I-405 AT OLD RANCH ROAD IN CONJUNCTION WITH THE WEST COUNTY CONNECTOR PROJECT IN THE CITY OF SEAL BEACH. All performed work shall be in accordance with current Caltrans Standard Specification | I-405/SEAL BEACH BLVD INTERCHANGE, SEAL BEACH | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 6853 | Project ID: 6853 DEA: 042L2304 EFIS: 0400000862 MINOR: 04A3713 | 04-SOL-121-6.7 | Install lighting standards type 21D and Type 30. | 06/08/2020 | 1 (10/30/2019) | Details CEM-3701 Report | |
| 6854 | Project ID: 6854 DEA: 030F5504 EFIS: 0300000091 MINOR: 03A1909 | 03-BUT-99-30.6 | Place Polyester Overlay on the Bridge Deck | In Butte Co on Hwy 99 Skyway Overcrossing | 12/18/2017 | 2 (12/05/2014) | Details CEM-3701 Report |
| 6855 | Project ID: 6855 DEA: 112M02A4 | 11-SD-5,54,75,94,125,805,905-VAR | Clean and Treat Bridge Deck with Methacrylate and Repalce Seals | Various Locations | 06/25/2012 | 1 (10/06/2011) | Details CEM-3701 Report |
| 6856 | Project ID: 6856 EFIS: 0000001155 Permit Numbers: 04106SN2352 | 04-SCL-82-20.75/20.75 | Connect 4\" gas service to existing gas main. | 1901 El Camino Real, Mountain View | 09/14/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 6857 | Project ID: 6857 EFIS: 0000001155 Permit Numbers: 0407NSN1169 | 04-ALA-185-3.2/3.7 | Replace the existing street light. | Unlisted, San Leandro | 08/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 6858 | Project ID: 6858 DEA: 043A7734 Permit Numbers: 0412NRT0901 0412NRT0913 0411NDP1529 0410NMC0139 | 04-CC--0/5 | The purpose of the I-80 Integrated Corridor Mobility (ICM) Traffic Signal Light Synchronization project (TLSP) is to assist in monitoring, and managing the traffic flow along the I-80 and State Route 123 corridor. | I-80 AND SR 123, Var | 08/16/2013 | 1 (12/21/2012) | Details CEM-3701 Report |
| 6859 | Project ID: 6859 EFIS: 0000001155 Permit Numbers: 1209NMC0151 | 12-ORA-39-15.573/15.573 | Perform street improvements along Artesia Blvd including pavement rehabilitation at the Artesia Blvd/Knott Avenue intersection; pavement rehabilitation and modification to the east leg of the intersection at Artesia Blvd/Firestone Blvd/I-5 Northbound Ramp | ARTESIA BLVD, BUENA PARK | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
