Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6731-6740 of 19517 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7451 | Project ID: 7451 EFIS: 0000001155 Permit Numbers: 0308NMC0223 | 03-PLA-65-6.5/7.4 | Reconstruct Interchange | Pleasant Grove Blvd, Roseville | 04/27/2018 | 2 (12/05/2014) | Details CEM-3701 Report |
| 7571 | Project ID: 7571 DEA: 06471004 EFIS: 0600000463 | 06-MAD-99-R6.9/R8.2 | RECONSTRUCT INTERCHANGE | MADERA COUNTY NEAR MADERA FROM 0.6 MILE SOUTH OF AVENUE 12 OVERCROSSING TO 0.7 MILE NORTH OF AVENUE 12 OVERCROSSING | 04/23/2018 | 1 (10/29/2012) | Details CEM-3701 Report |
| 7826 | Project ID: 7826 DEA: 040A1854 EFIS: 0400020652 COOP: 042363 | 04-SON-101-7.1/8.1 | RECONSTRUCT INTERCHANGE | SONOMA COUNTY IN PETALUMA FROM 0.6 MILE SOUTH TO 0.4 MILE NORTH OF OLD REDWOOD HIGHWAY OVERCROSSING | 01/03/2017 | 1 (12/10/2012) | Details CEM-3701 Report |
| 8166 | Project ID: 8166 COOP: 081496 Permit Numbers: 0811NMC0715 | 08-SBD-10-12.3-14.1 | Reconstruct interchange | City of Fontana at Cherry Avenue Interchange | 09/14/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 211778 | Project ID: 211778 DEA: 04235654 EFIS: 0400000680 | 04-SM-101,114-1.3/2.5,5.0/5.3 | RECONSTRUCT INTERCHANGE | SAN MATEO COUNTY AT VARIOUS LOCATIONS ON ROUTE 101 FROM 0.4 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.6 MILE SOUTH OF HENDERSON UNDERPASS AND ON ROUTE 114 FROM WILLOW ROAD SEPARATION TO NEWBRIDGE STREET | 01/08/2020 | 1 (10/24/2016) | Details CEM-3701 Report |
| 215028 | Project ID: 215028 DEA: 120Q6904 EFIS: 1217000088 | 12-ORA-5,22,55,57,73,etc-var | RECONSTRUCT INDUCTIVE, VEHICLE DETECTION, AND RAMP METERING SYSTEMS. | ORANGE COUNTY AT VARIOUS LOCATIONS | 10/27/2022 | 1 (11/12/2020) | Details CEM-3701 Report |
| 213 | Project ID: 213 DEA: 01475104 | 01-HUM-254-5.1/5.6 | Reconstruct highway with tieback retaining walls, replace culverts. | HUMBOLDT COUNTY NEAR MIRANDA FROM 1.3 MILES SOUTH OF MIRANDA POST OFFICE TO 0.8 MILE SOUTH OF MIRANDA POST OFFICE | 12/10/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 211917 | Project ID: 211917 DEA: 06457114 EFIS: 0600020478 | 06-KER-14,178-58.2/62.3,88.3/88.9 | RECONSTRUCT HIGHWAY FROM 2-LANE CONVENTIONAL TO 4-LANE EXPRESSWAY. | KERN COUNTY NEAR INDIAN WELLS ON ROUTE 14 FROM 2.4 MILES SOUTH OF JUNCTION ROUTE 178 TO 1.7 MILES NORTH OF JUNCTION ROUTE 178 AND ON ROUTE 178 FROM ROUTE 14 TO 0.6 MILE EAST OF ROUTE 14 | 12/07/2018 | 1 (03/03/2017) | Details CEM-3701 Report |
| 231 | Project ID: 231 DEA: 01477104 | 01-MEN,LAK-175-Var | RECONSTRUCT HIGHWAY EMBANKMENT, REPLACE CULVERTS, PLACE HMA. | MENDOCINO AND LAKE COUNTIES AT VARIOUS LOCATIONS FROM 4.0 MILES WEST OF THE MENDOCINO/LAKE COUNTY LINE TO 0.8 MILE EAST OF THE MENDOCINO/LAKE COUNTY LINE | 12/10/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 1267 | Project ID: 1267 DEA: 034C2504 | 03-ED-89-16.6 | RECONSTRUCT HIGHWAY | IN EL DORADO COUNTY AT EMERALD BAY | 03/22/2011 | 1 (03/22/2011) | Details CEM-3701 Report |
