Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 6601-6610 of 19673 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214264Project ID: 214264
Permit Numbers: 0817NSN0928 0819NRT0503 0819NRT0554 08196RT0548 0819NRW1288 0819NRW1287 08186DP8090
08---53.626Enter onto State Route 111 right of way at Via Miraleste intersection in Palm Springs, within Riverside County, to install traffic signal and safety lighting, removal of existing street lights, modify signing and striping, replacement of cross gutters, modification of curb ramps and other street imIntersection of Vista Chini and Via Miraleste, Palm Springs06/23/20211 (09/19/2019)Details CEM-3701 Report
214263Project ID: 214263
DEA: 100Y5404
EFIS: 1013000227
MINOR: 10A2104
10-SJ--Parking LotCaltrans District 10 Office01/04/20231 (08/02/2019)Details CEM-3701 Report
214262Project ID: 214262
Permit Numbers: 0419NMC0761 0419NRT1587
04---10.8The City of Milpitas proposes to rehalabilitate three (3) road segments.McCarthy Blvd, Hillview Dr and Jacklin Rd, Milpitas 2 (08/19/2019)Details CEM-3701 Report
214261Project ID: 214261
DEA: 06484604
EFIS: 0600000484
COOP: 061726
06--,99-The bridge work includes construction of ten (10) new bridges as part of the future SR-58 Centennial Corridor. This work includes constructing one (1) Viaduct, four (4) Undercrossings, three (3) Overcrossings, and two (2) Connector Overcrossings. In additn Kern County in Bakersfield on Route 58 from 0.1 miles west of Mohawk St to Cottonwood Rd and on Route 99 from 0.8 miles south of Route 58 to 0.3 Miles north of Route 58 2 (08/05/2019)Details CEM-3701 Report
214260Project ID: 214260
DEA: 120Q3004
EFIS: 1216000123
12-ORA-5-37.4MODIFY ELECTRICAL SYSTEM AND PLACE HIGH FRICTION SURFACE TREATMENT.ORANGE COUNTY IN ANAHEIM AT HARBOR BOULEVARD OVERCROSSING06/25/20211 (09/12/2019)Details CEM-3701 Report
214259Project ID: 214259
DEA: 120N9204
EFIS: 1215000010
12-ORA-22-R9.1UPGRADE DRAINAGE SYSTEM.ORANGE COUNTY IN GARDEN GROVE AT HASTER STREET OFF-RAMP10/25/20221 (10/28/2019)Details CEM-3701 Report
214258Project ID: 214258
DEA: 101G7214
EFIS: 1018000067
10-MER,SJ-5,99-0.4/0.9,30.9INSTALL ZEV CHARGING STATIONS.MERCED AND SAN JOAQUIN COUNTIES AT VARIOUS LOCATIONS ON ROUTE 5 AT JOHN "CHUCK" ERRECA REST AREA AND ON ROUTE 99 AT LODI PARK AND RIDE03/25/20221 (07/22/2019)Details CEM-3701 Report
214257Project ID: 214257
DEA: 09372704
EFIS: 0917000054
09-KER,INY-58,395-VarCONSTRUCT ELECTRIC VEHICLE CHARGING STATION SYSTEM AND PLACE PCC.KERN AND INYO COUNTIES AT VARIOUS LOCATIONS01/14/20211 (12/12/2019)Details CEM-3701 Report
214256Project ID: 214256
DEA: 07317404
EFIS: 0715000241
07-LA-105-R7.8/R10.3SLOPE STABILIZATION AND EROSION CONTROL.LOS ANGELES COUNTY IN AND NEAR LOS ANGELES AND AT WILLOWBROOK FROM MAIN STREET UNDERCROSSING TO MONA BOULEVARD09/17/20241 (04/07/2021)Details CEM-3701 Report
214255Project ID: 214255
DEA: 07304104
EFIS: 0714000057
07-LA-91-R14.1/R15.2CONSTRUCT MAINTENANCE VEHICLE PULLOUTS.LOS ANGELES COUNTY IN AND NEAR BELLFLOWER FROM 0.1 MILE WEST OF DOWNEY AVENUE UNDERCROSSIGN TO 0.2 MILE EAST OF CLARK AVENUE UNDERCROSSING11/29/20211 (12/10/2019)Details CEM-3701 Report