Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6571-6580 of 19348 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213959 | Project ID: 213959 DEA: 100T9104 EFIS: 1000000306 COOP: 10345,10446 | 10-STA-99-R4.1/F4.9 | Roadway reconstruction, including roadway and ramp widening and new traffic signals. The work also include retaining walls, ground anchor walls, detention basins, HMA paving, storm drain, and drainage basins. First day: 4/29/19, Completion: 6/2/20 | State Highway 99 in Stanislaus County In the City of Turlock from 0.4 mile south to 0.4 mile north of Fulkerth Road Undercrossing. | 07/23/2021 | 2 (02/21/2019) | Details CEM-3701 Report |
| 213958 | Project ID: 213958 DEA: 010F9604 EFIS: 0116000109 | 01-HUM-101-124.5 | LITTLE LOST MAN FISH PASSAGE | HUMBOLDT COUNTY NEAR ORICK 0.2 MILE SOUTH OF LOST MAN CREEK BRIDGE | 11/23/2021 | 1 (06/24/2019) | Details CEM-3701 Report |
| 213957 | Project ID: 213957 DEA: 010E0404 EFIS: 0113000100 | 01-HUM-101-78/79.8 | Eureka CAPM | 07/18/2023 | 1 (02/20/2019) | Details CEM-3701 Report | |
| 213956 | Project ID: 213956 DEA: 03425504 EFIS: 0300000617 COOP: 030635 | 03-SAC-5-31.1/31.9 | Piles, CIP P/S Concrete Box Girder, Overhead sign structures; est const start: June 2019, Est comp: July 2020. | Local Agency: County of Sacramento; On Interstate 5, from Route 5/70 /99 Separation to Powerline Road Overcrossing. | 07/30/2021 | 2 (02/20/2019) | Details CEM-3701 Report |
| 213955 | Project ID: 213955 DEA: 120R8004 EFIS: 1219000042 | 12-ORA-57,91-15.2/15.3 | 12-0R800 Rte.57 Damaged Soundwall | 07/02/2024 | 1 (12/10/2020) | Details CEM-3701 Report | |
| 213954 | Project ID: 213954 DEA: 044K0804 EFIS: 0417000257 Permit Numbers: 0418NOP2083 | 04---26 | The project proposes to improve the intersections of Marsh Road (SR-84)at Constitution drive and Marsh Rd. (SR-84)at Bayfront Expressway (SR-84). | Marsh Road, Menlo Park | 04/02/2021 | 1 (03/29/2019) | Details CEM-3701 Report |
| 213953 | Project ID: 213953 DEA: 11411324 EFIS: 1115000132 | 11-SD-8,15-5.6,R6.1 | CONCRETE BARRIERS, MGS, PAVED GORE AREAS, MVPS, IRRIGATION. | SAN DIEGO COUNTY AT ROUTE 15/8 SEPARATION | 08/24/2021 | 1 (06/25/2019) | Details CEM-3701 Report |
| 213952 | Project ID: 213952 DEA: 101H6404 EFIS: 1018000015 | 10-ALP,AMA,TUO-4,49,88,89,108-Var | REPLACE JOINT SEALS, APPROACH SLAB AND POLYESTER CONCRETE OVERLAY. | AMADOR, ALPINE AND TUOLUMNE COUNTIES AT VARIOUS LOCATIONS. | 03/23/2022 | 1 (04/11/2019) | Details CEM-3701 Report |
| 213951 | Project ID: 213951 DEA: 100X7004 EFIS: 1013000248 | 10-SJ-205-2.3/R9.6 | MVPS, GORE PAVING, SLOPE PAVING UNDER BRIDGES. | SAN JOAQUIN COUNTY IN AND NEAR TRACY AT VARIOUS LOCATIONS FROM HANSEN ROAD OVERCROSSING TO PARADISE ROAD OVERCROSSING | 12/02/2020 | 1 (04/11/2019) | Details CEM-3701 Report |
| 213950 | Project ID: 213950 DEA: 09376604 EFIS: 0918000059 | 09-INY-178-36.0/42.9 | RESURFACE EXISTING PAVEMENT WITH HOT MIX ASPHALT (OPEN-GRADED). | INYO COUNTY NEAR SHOSHONE FROM 6.9 MILES WEST OF ROUTE 127 TO ROUTE 127 | 11/12/2019 | NOT VERIFIED | Details CEM-3701 Report |
