Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6541-6550 of 18882 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209077 | Project ID: 209077 DEA: 080M4504 EFIS: 0800000481 | 08-SBD-38-R5.2/5.5 | CONSTRUCT LEFT TURN LANE | SAN BERNARDINO COUNTY IN MENTONE FROM 0.2 MILE EAST OF AMETHYST STREET TO MOUNTAIN VIEW LANE | 10/21/2014 | 1 (10/08/2013) | Details CEM-3701 Report |
| 209078 | Project ID: 209078 DEA: 08449104 EFIS: 0800000714 | 08-RIV-111-1.5 | REPLACE BRIDGE WITH PRECAST PS I GIRDERS AND CONSTRUCT RW. | RIVERSIDE COUNTY 1.5 MILES NORTH OF IMPERIAL COUNTY AT SALT CREEK BRIDGE | 12/07/2015 | 1 (10/08/2013) | Details CEM-3701 Report |
| 209079 | Project ID: 209079 DEA: 09351604 EFIS: 0900020081 | 09-INY-395-45.6/50.3,50.9/52.9 | COLD IN-PLACE RECYCLED PAVEMENT AND HMA SUPERPAVE OVERLAY. | INYO COUNTY NEAR LONE PINE FROM 0.7 MILE SOUTH OF COTTONWOOD ROAD TO 0.8 MILE NORTH OF CARROLL CREEK ROAD AND FROM 1.4 MILES NORTH OF CARROLL CREEK ROAD TO 0.4 MILE SOUTH OF LUBKEN CANYON ROAD | 08/29/2014 | 1 (10/08/2013) | Details CEM-3701 Report |
| 209080 | Project ID: 209080 DEA: 11002704 EFIS: 1100000005 | 11-SD-70,162-R19.9/R21.2,R0.0/R0.7 | JPCP, WIDEN CONN, CONSTRUCT MBGR, RW, CCTV, AND LIGHTING. | SAN DIEGO COUNTY IN SAN DIEGO ON ROUTE 5 FROM 0.1 MILE SOUTH OF ROUTE 8/5 SEPARATION AND OVERHEAD TO 0.3 MILE NORTH OF TECOLOTE CREEK BRIDGE AND ON ROUTE 8 FROM ROUTE 8/5 SEPARATION AND OVERHEAD TO 0.3 MILE EAST OF MORENA BOULEVARD UNDERCROSSING | 07/13/2016 | 1 (07/18/2014) | Details CEM-3701 Report |
| 209081 | Project ID: 209081 DEA: 11287904 EFIS: 1100000346 | 11-SD-4,49-32.8/40.3 | ADJUST MBGR AND UPGRADE END TREATMENTS. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM 1.0 MILE WEST OF COCHERA VIA DRIVE TO 1.0 MILE WEST OF POTRERO VALLEY ROAD | 04/23/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 209084 | Project ID: 209084 DEA: 051C0204 EFIS: 0512000053 MINOR: 05A1618 | 05-SLO-1-43.2/46.8 | Concrete Pave Culvert Inverts | IN MONTEREY AND SAN LUIS OBISPO COUNTIES ON ROUTE 1 AND 46 AT VARIOUS LOCATIONS PAVE INVERTS | 08/16/2019 | 1 (08/26/2013) | Details CEM-3701 Report |
| 209085 | Project ID: 209085 DEA: 081E5404 EFIS: 0814000048 | 08-RIV-18.0,28.3-45 | Replace MBGR and traffic signs. Stabilized slopes | Near Twin Pines from 0.7 mile south of Hurley Flats Road to San Gorgonio Avenue | 11/21/2013 | 1 (10/08/2013) | Details CEM-3701 Report |
| 209086 | Project ID: 209086 DEA: 040J4204 EFIS: 0413000468 | 04-CC-24-5.9/6.2,0.0/0.3 | Replace Uninterrupted Power Supply system | In Ala and CC Counties at Caldecott Tunnel | 08/21/2018 | 1 (08/01/2013) | Details CEM-3701 Report |
| 209087 | Project ID: 209087 DEA: 044G7004 EFIS: 0413000026 | 04-ALA-680-.9/1.6 | Injection grouting ,grind AC pavement, and overlay with AC | in Fremont from .8 mile north of Scott Creek Road to .3 mile south of East Warren Ave, | 05/09/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 209088 | Project ID: 209088 DEA: 081E2704 EFIS: 0813000199 | 08-RIV-86-R4.24 | Place a steel plate over damaged section and add corrugated metal decking to the entire deck | West of Salton Sea near Kings Storm water Channel Right Bridge #56-0778 | 02/04/2014 | 1 (10/08/2013) | Details CEM-3701 Report |
