Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6531-6540 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210638 | Project ID: 210638 Permit Numbers: 0615AOP0108 0615ADP0318 0615ART0547 | 06-KER-46-29.9/30.5 | Enter upon the State Highway Right-of-way on State Route 46 (SR 46) from PM 29.9 to PM 30.5 in Karen County, to set up, maintain, and remove temporary traffic control necessary to construct Kern County Roads Department?s Pedestrian Path Project No. 3000-SR4641T, Contract No. 14007 (Federal Project | 21155 Hwy 46, Lost Hills | 04/04/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 210535 | Project ID: 210535 Permit Numbers: 0614NOP0442 0615NRW0472 | 06-KER-46-49/49 | Enter upon the State Highway Right-of-way on State Route 46 (SR-46) in Wasco at and near the SR-46 (Paso Robles Highway)/Central Avenue Intersection (PM 49.5) to set up, maintain, and remove temporary traffic control necessary in order to construct the City of Wasco?s Central Avenue, and Margalo St | SR46 (Paso Robles Hwy), Wasco | 04/04/2019 | 1 (06/17/2015) | Details CEM-3701 Report |
| 211907 | Project ID: 211907 DEA: 060F3604 EFIS: 0600000076 COOP: 061583 Permit Numbers: 0614AOP0912 0615ADP0141 0616AOP1000 0616ADP1001 0617ART0088 | 06-KER-58-50.6/51.7 | Enter upon the State Highway Right-of-way on State Route 58 (SR 58) from Mohawk Street (PM 50.6) to State Route 99 (PM 51.7) in the City of Bakersfield, Kern County, to set up, maintain, and remove temporary traffic control necessary to construct, portion within State Right-of-way, the City?s Rosed | Rosedale Hwy, Bakersfield | 04/27/2018 | 2 (04/14/2014) | Details CEM-3701 Report |
| 210168 | Project ID: 210168 Permit Numbers: 0614AOP0900 | 06-KER-99-22.1/22.7 | Enter upon the State Highway Right-of-way on State Route 58 (SR 58) from State Route 99 (SR 99) separation to Cottonwood Road (PM R52.3/R55.4), and on SR 99 from Ming Avenue to SR 58 (PM 22.1/22.7) in the City of Bakersfield, Kern County, to set up, maintain, and remove temporary traffic control ne | on SR58 from SR99 to Cottonwood IC and on SR99 at the Ming Av IC, Bakersfield | 04/04/2019 | 1 (02/05/2015) | Details CEM-3701 Report |
| 3037 | Project ID: 3037 EFIS: 0000001155 Permit Numbers: 0609NSN0084 | 06-KER-58-50/51 | Enter upon the State Highway Right-of-way on State Route 58 (SR-58) in Bakersfield between Post Mile 50 and 51 to set up, maintain, and remove temporary traffic control necessary in order to widen the roadway and to install traffic signals and lighting at | Rosedale Highway, Bakersfield | 06/11/2018 | 2 (11/25/2014) | Details CEM-3701 Report |
| 7134 | Project ID: 7134 EFIS: 0000001155 Permit Numbers: 0611NSN0977 | 06-KER-58-50/51 | Enter upon the State Highway Right-of-way on State Route 58 (SR-58) in Bakersfield between Post Mile 50 and 51 to set up, maintain, and remove temporary traffic control necessary in order to widen the roadway and to install traffic signals and lighting at | Rosedale, Bakersfield | 07/30/2018 | 2 (12/05/2014) | Details CEM-3701 Report |
| 208826 | Project ID: 208826 DEA: 060G8504 EFIS: 0600020167 COOP: 061535 Permit Numbers: 0613NMC0437 | 06-KER-58-52.7/55.5 | Enter upon the State Highway Right-of-way on State Route 58 (SR-58) in Bakersfield near the SR-58/SR-99 Separation at SR-58/Hughes Lane Overcrossing (PM R52.7) to set up, maintain, and remove temporary traffic control necessary in order to construct the C | SR58, Bakersfield | 08/27/2018 | 2 (07/24/2013) | Details CEM-3701 Report |
| 210073 | Project ID: 210073 DEA: 060Q4604 EFIS: 0613000133 COOP: 061542 Permit Numbers: 0614NOP0788 0615ADP0297 | 06-TUL-63-8.4/8.9 | Enter upon the State Highway Right-of-way on State Route 63 (SR 63) in Tulare County between PM 8.4 and PM R8.9 to set up, maintain, and remove temporary traffic control necessary to construct the proposed SR 63 and Lincoln Oval Street Improvement Project (City of Visalia Project No. 3010-72000/CP8 | Court & Locust, Visalia | 04/27/2018 | 2 (12/29/2014) | Details CEM-3701 Report |
| 3033 | Project ID: 3033 DEA: 06307004 COOP: 061361 Permit Numbers: 0610NMC0203 0609NMC0132 0611NDP0483 | 06-TUL-63-5.8/8 | Enter upon the State Highway Right-of-way on State Route 63 (SR-63) in Visalia between Post Mile 5.8 and 8.0 to set up, maintain, and remove temporary traffic control necessary to construct the Citys Whitendale Avenue Street Widening Project | Whitendal Avenue at Mooney Blvd., Visalia | 10/13/2010 | NOT VERIFIED | Details CEM-3701 Report |
| 3379 | Project ID: 3379 EFIS: 0000001155 Permit Numbers: 0610NDP0541 | 06-TUL-63-5.8/8 | Enter upon the State Highway Right-of-way on State Route 63 (SR-63) in Visalia between Post Mile 5.8 and 8.0 to set up, maintain, and remove temporary traffic control necessary to construct the Citys Whitendale Avenue Street Widening Project (Contract No. | Whitendal Avenue at Mooney Blvd., Visalia | 06/11/2018 | 2 (12/05/2014) | Details CEM-3701 Report |
