Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6521-6530 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209080 | Project ID: 209080 DEA: 11002704 EFIS: 1100000005 | 11-SD-70,162-R19.9/R21.2,R0.0/R0.7 | JPCP, WIDEN CONN, CONSTRUCT MBGR, RW, CCTV, AND LIGHTING. | SAN DIEGO COUNTY IN SAN DIEGO ON ROUTE 5 FROM 0.1 MILE SOUTH OF ROUTE 8/5 SEPARATION AND OVERHEAD TO 0.3 MILE NORTH OF TECOLOTE CREEK BRIDGE AND ON ROUTE 8 FROM ROUTE 8/5 SEPARATION AND OVERHEAD TO 0.3 MILE EAST OF MORENA BOULEVARD UNDERCROSSING | 07/13/2016 | 1 (07/18/2014) | Details CEM-3701 Report |
| 209081 | Project ID: 209081 DEA: 11287904 EFIS: 1100000346 | 11-SD-4,49-32.8/40.3 | ADJUST MBGR AND UPGRADE END TREATMENTS. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM 1.0 MILE WEST OF COCHERA VIA DRIVE TO 1.0 MILE WEST OF POTRERO VALLEY ROAD | 04/23/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 209084 | Project ID: 209084 DEA: 051C0204 EFIS: 0512000053 MINOR: 05A1618 | 05-SLO-1-43.2/46.8 | Concrete Pave Culvert Inverts | IN MONTEREY AND SAN LUIS OBISPO COUNTIES ON ROUTE 1 AND 46 AT VARIOUS LOCATIONS PAVE INVERTS | 08/16/2019 | 1 (08/26/2013) | Details CEM-3701 Report |
| 209085 | Project ID: 209085 DEA: 081E5404 EFIS: 0814000048 | 08-RIV-18.0,28.3-45 | Replace MBGR and traffic signs. Stabilized slopes | Near Twin Pines from 0.7 mile south of Hurley Flats Road to San Gorgonio Avenue | 11/21/2013 | 1 (10/08/2013) | Details CEM-3701 Report |
| 209086 | Project ID: 209086 DEA: 040J4204 EFIS: 0413000468 | 04-CC-24-5.9/6.2,0.0/0.3 | Replace Uninterrupted Power Supply system | In Ala and CC Counties at Caldecott Tunnel | 08/21/2018 | 1 (08/01/2013) | Details CEM-3701 Report |
| 209087 | Project ID: 209087 DEA: 044G7004 EFIS: 0413000026 | 04-ALA-680-.9/1.6 | Injection grouting ,grind AC pavement, and overlay with AC | in Fremont from .8 mile north of Scott Creek Road to .3 mile south of East Warren Ave, | 05/09/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 209088 | Project ID: 209088 DEA: 081E2704 EFIS: 0813000199 | 08-RIV-86-R4.24 | Place a steel plate over damaged section and add corrugated metal decking to the entire deck | West of Salton Sea near Kings Storm water Channel Right Bridge #56-0778 | 02/04/2014 | 1 (10/08/2013) | Details CEM-3701 Report |
| 209089 | Project ID: 209089 DEA: 074X1104 EFIS: 0714000043 | 07-LA-5,5-15.1/22.5 | REPAIR BRIDGE/CONNECTOR TUNNEL. REPLACE ROADWAY FACILITIES AND ELECTRICAL SYSTEM | LA-2/LA-5 INTERCHANGE | 07/28/2014 | 1 (08/23/2013) | Details CEM-3701 Report |
| 209090 | Project ID: 209090 DEA: 04277904 EFIS: 0400000763 COOP: 041833A2 | 04-ALA-880-13.0/20.0 | Construct 2.3 miles long bike path project (Bay Trail Improvements) | In the City of Union City in Alameda County. PROJECT extends from Eden Landing /Baum berg Track and the J-3 Line in Union City | 05/07/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 209091 | Project ID: 209091 DEA: 100G2304 EFIS: 1014000027 COOP: 10405 | 10-CAL-49,49-21.1/21.8,7.1/7.3 | Rte 4/49 Intersection Improvements - Rem 2 Br & Bld Triple Box Culvert | 08/12/2021 | 1 (10/01/2019) | Details CEM-3701 Report |
