Displaying 6521-6530 of 18882 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214783Project ID: 214783
Permit Numbers: 1119NUR0675 1119NRW0703 1119NRW0891 1120NRT0116
11-IMP-8-36.5/37.5enter upon State Highway right of way in Imperial County, City of El Centro, on Interstate 8, post mile R36.50 to R37.50, to replace existing 18-inch diameter steel water pipeline with new PVC water pipeline and extension of storm drain pipeline to IID structure by Horizontal Directional DrillingINTERSTATE 8, EL CENTRO08/24/20211 (03/02/2020)Details CEM-3701 Report
208604Project ID: 208604
Permit Numbers: 1112NLF0050 1113NDP0027
11-IMP-8-37.8/38.14enter upon State Highway right of way in Imperial County, City of El Centro, on Route 8, post mile R37.82-R38.14, to perform grading and to install irrigation and landscaping, as shown on the attached plans, in accordance with the requirements and conditionsINTERSTATE 8, EL CENTRO08/01/2018NOT VERIFIEDDetails CEM-3701 Report
211216Project ID: 211216
Permit Numbers: 1115NUJ0564
11-IMP-8-39.47/39.47enter upon State Highway right of way in Imperial County, City of El Centro, on Route 8, post mile R39.47, to install water pipeline by jack and bore, in accordance with the requirements and conditions contained herein and as further directed or approved by the State's Resident Engineer, Shawn RINTERSTATE 8, EL CENTRO08/07/2018NOT VERIFIEDDetails CEM-3701 Report
6015Project ID: 6015
EFIS: 0000001155
Permit Numbers: 1110NMC0187
11-IMP-86-7.24/7.31enter upon State Highway right of way in Imperial County, City of El Centro, on Route 86, post mile 7.24-L7.31, to construct curb and gutter and sidewalk and modify drainage facilities and a traffic signal, as shown on the attached plans, in accordance withROUTE 86, EL CENTRO08/01/2018NOT VERIFIEDDetails CEM-3701 Report
6016Project ID: 6016
DEA: 11956625L
EFIS: 0000001155
Permit Numbers: 1110NMC0278
11-IMP-115-9.97/10.32enter upon State Highway right of way in Imperial County, City of Holtville, on Route 115, post mile L9.97 to L10.32, to construct curb & gutter and sidewalk, to modify drainage facilities, and to install a 12 inch water line and lighting facilities,ROUTE 115, HOLTVILLE07/12/2012NOT VERIFIEDDetails CEM-3701 Report
214127Project ID: 214127
Permit Numbers: 11176MC0686 11186RT0825
11---27.76/28enter upon State Highway right of way in Imperial County, City of Westmorland, on Route 86, post mile 27.76 to 28.00, to replace existing AC pavement, stripping, storm drain piping, drain boxes, install new curb and gutter, H.M.A. dike, construct new center median, add drive approaches, traffic sigROUTE 86, WESTMORLAND08/24/20211 (05/03/2019)Details CEM-3701 Report
6018Project ID: 6018
EFIS: 0000001155
Permit Numbers: 1110NUJ0138
11-IMP-111-4.76/4.76enter upon State Highway right of way in Imperial County, Community of Heber, on Route 86, post mile R0.00-1.08 and Route 111, post mile R4.74, to trench along Route 86 and bore and jack under Route 111 to install a 12 inch water line, as shown on the attROUTE 86 AND ROUTE 111, HEBER07/10/2012NOT VERIFIEDDetails CEM-3701 Report
210361Project ID: 210361
Permit Numbers: 11146MC0776
11-IMP-86-53.16/53.3enter upon State Highway right of way in Imperial County, Community of Salton City, on Route 86 post mile 53.16 to 53.30, to construct an acceleration lane and a right turn pocket, as shown on the attached plans, in accordance with the requirements and conditions contained herein and as further dirROUTE 86, SALTON CITY08/01/2018NOT VERIFIEDDetails CEM-3701 Report
210201Project ID: 210201
Permit Numbers: 1113NSN0429 11156DP0041 1115NRT0046
11-IMP-86-55.96/56.3enter upon State Highway right of way in Imperial County, Community of Salton City, on Route 86, post mile 55.96-56.30 to perform road widening, install four concrete pads and to install new traffic signal and signing and striping, as shown on the attached plans, in accordance with the requirementsROUTE 86, SALTON CITY08/01/20181 (04/01/2015)Details CEM-3701 Report
7784Project ID: 7784
EFIS: 0000001155
Permit Numbers: 11126RC0014
11-IMP-98-22.54/22.54enter upon State Highway right of way in Imperial County, near the Community of Mount Signal, on Route 98, post mile 22.54, to construct a commercial driveway, as shown on the attached plans, in accordance with the requirements and conditions contained heROUTE 98, MOUNT SIGNAL08/01/2018NOT VERIFIEDDetails CEM-3701 Report