Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 6491-6500 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993186Project ID: 993186
DEA: 04264704
EFIS: 0400000740
04-SCL-101-40.0/41.5Reconstruction of the existing three-quadrant cloverleaf interchange to a Type L-9 partial cloverleaf interchangeThe Project limits are on Route US 101 at De La Cruz Blvd/Trimble Road Interchange in San Jose at Santa Clara County 2 (08/09/2021)Details CEM-3701 Report
210580Project ID: 210580
DEA: 022E8004
EFIS: 0200000603
02-SIS-5-R7.2RECONSTRUCTION OF THE DUNSMUIR COMMERCIAL VEHICLE ENFORCEMENT FACILITYIN SISKIYOU COUNTY NEAR DUNSMUIR ATDUNSMUIR GRADE COMMERCIAL VEHICLE ENFORCEMENT FACILITY.11/13/20201 (09/23/2015)Details CEM-3701 Report
210599Project ID: 210599
DEA: 043A2304
COOP: 042320A5
04-SON-101-25.9/26.3Reconstruction of the Airport Boulevard Interchange, and (b) implementation of improvements to the traffic operationsOn US 101 between Airport Boulevard and Fulton Road, in Sonoma County08/19/20191 (08/19/2019)Details CEM-3701 Report
215056Project ID: 215056
Permit Numbers: 0520NMC0221
05-SB-246-29.242/-1Reconstruction of southeast corner of Highway 246 and 5th Street intersection in Solvang, California. Work includes demolition and reconstruction of existing sidewalk, curb, gutter, construct modified Case C curb ramp, relocation of a power pole, relocation or replace traffic signal facilities, andHighway 246 and Fifth Street , Solvang09/23/20221 (07/03/2020)Details CEM-3701 Report
7963Project ID: 7963
DEA: 10472104
EFIS: 1000000440
COOP: 100397
10-STA-99-Reconstruction of interchange at SR 99 at Pelandale Ave.City of Modesto, CA03/23/20202 (04/19/2013)Details CEM-3701 Report
794Project ID: 794
EFIS: 0000001155
Permit Numbers: 0309NSN0561
03-YOL-50-2.92/2.92reconstruction of Hwy 50 S river rd off-ramp for "bridge "district" Phase I public roadway/redevelopement project. existing grades at the street intersection will be raised and the number of travel lanes increased, requiring the reconstrcution of the off-ramp up to the bridge abutemen111 Tower Street, West Sacramento09/17/2014NOT VERIFIEDDetails CEM-3701 Report
212927Project ID: 212927
Permit Numbers: 0716NCS2320 07176DP1688 0717NRW1961
07-LA-138-47.4/47.4Reconstruction of ADA curb ramps at the four corners of the intersection. AC pavement surface modifications to match existing grades to new construction. Sidewalk construction and wall along the back of sidewalk with pedestrian railing. Drainage headwall removal. Drainage headwall construction andPalmdale Blvd at 35th Street East, Plamdale06/16/20211 (11/07/2017)Details CEM-3701 Report
1528Project ID: 1528
DEA: 040A3801
Permit Numbers: 0407NDP0902
04-SCL-237-6.09/6.71RECONSTRUCTION OF 82 x 34 WIDE NINE SPAN SLAB BRIDGE, ROADWAY APPROACH AND BIKE LANE05/03/2011NOT VERIFIEDDetails CEM-3701 Report
2440Project ID: 2440
DEA: 044S4604
EFIS: 0400001239
04-SCL-17-5.5RECONSTRUCTION MEDIAN CONCRETE BARRIER 03/23/20201 (04/16/2009)Details CEM-3701 Report
3532Project ID: 3532
Permit Numbers: 0702NMC2612
07-LA-107-Reconstruction (striping, signal lights) of NE & SW corner of intersection of Hawthorn Blvd. and Del Amo 06/29/2007NOT VERIFIEDDetails CEM-3701 Report