Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6441-6450 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 5367 | Project ID: 5367 DEA: 09316604 | 09-INY-395-R13.7/R19.0 | REHABILITATE HIGHWAY | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
| 5368 | Project ID: 5368 DEA: 09317204 | 09-INY-5709- | REMODEL MAINTENANCE STATION BUILDINGS | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
| 5369 | Project ID: 5369 DEA: 09317704 | 09-INY-395-90.9 | RESURFACE ROADWAY | IN INYO AND MONO COUNTIES ATVARIOUS LOCATIONS | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 5370 | Project ID: 5370 DEA: 09318104 | 09-INY-190-141.2/141.7 | WIDEN SHOULDERS AND CONSTRUCT PARKING LOT | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
| 5374 | Project ID: 5374 DEA: 09321904 | 09-MNO-395-76.9 | SHOULDER WIDENING | IN MONO COUNTY NEAR BRIDGEPORT FROM THE RICKEY DITCH OVERFLOW BRIDGE TO 0.4 KM SOUTH OF THE DRESSLER CREEKBRIDGE | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 5375 | Project ID: 5375 DEA: 09326304 | 09-INY-190-29.6/36.0 | REMOVE AND PLACE CULVERTS. | INYO COUNTY ABOUT 10 MILES EAST OF KEELER AT VARIOUS LOCATIONS FROM 5.0 MILES EAST OF ROUTE 136 TO 1.5 MILES WEST OF TALC CITY CUT-OFF ROAD | 09/02/2011 | 1 (01/05/2012) | Details CEM-3701 Report |
| 5376 | Project ID: 5376 DEA: 09326404 | 09-MNO-158-0.0/1.7 | WIDEN SHOULDER AND RESURFACE PAVEMENT WITH HOT MIX ASPHALT | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
| 5378 | Project ID: 5378 DEA: 09326804 | 09-MNO-395-84.0/85.6 | Widen shoulders and construct rumble strips | MONO COUNTY NEAR BRIDGEPORT FROM 4.6 MILES NORTH OF BUCKEYE ROAD TO 1.4 MILES SOUTH OF SWAUGER CANYON ROAD | 12/20/2010 | 1 (12/20/2010) | Details CEM-3701 Report |
| 5379 | Project ID: 5379 DEA: 09327104 | 09-MNO-108,395-15.1,92.1/96.1 | Install wildlife crossings and wildlife fencing. | MONO COUNTY NEAR SONORA JUNCTION ON ROUTE 108 AT ROUTE 395 AND ON ROUTE 395 FROM BIRCHIM FLAT ROAD TO 0.8 MILE NORTH OF WEST WALKER RIVER BRIDGE | 06/13/2011 | 1 (04/30/2010) | Details CEM-3701 Report |
| 5380 | Project ID: 5380 DEA: 09328804 | 09-KER-178-145.5/148 | WIDEN SHOULDERS AND PLACE RUMBLE STRIPS | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
