Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6411-6420 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 994966 | Project ID: 994966 DEA: 073255U4 EFIS: 0722000129 | 07-LA-605-20.2/26 | INDIVIDUAL SLAB REPLACEMENT, COLD PLANE AC | LOS ANGELES COUNTY IN BALDWIN PARK AND IRWINDALE FROM ROUTE 10/605 SEPARATION TO 0.2 MILE NORTH OF ROUTE 210/605 SEPARATION | 1 (07/13/2023) | Details CEM-3701 Report | |
| 1000401 | Project ID: 1000401 DEA: 07356104 EFIS: 0719000000 | 07-LA-210-R37.8/R39.1 | REPLACE PUMP PLANT, DRAINAGE, & ELECTRICAL CONTROL & SERVICE SYSTEMS. | LOS ANGELES COUNTY IN AZUSA FROM 0.1 MILE WEST OF IRWINDALE AVENUE TO 0.2 MILE EAST OF WEST VERNON AVENUE | 1 (08/12/2024) | Details CEM-3701 Report | |
| 994267 | Project ID: 994267 DEA: 07326204 EFIS: 0716000113 | 07-LA-39-17.8 | CONSTRUCT BRIDGE, PLACE STRUCTURAL STEEL AND CONCRETE BARRIER. | LOS ANGELES COUNTY IN AZUSA AT SAN GABRIEL RIVER BRIDGE | 06/10/2025 | 1 (10/06/2022) | Details CEM-3701 Report |
| 212477 | Project ID: 212477 DEA: 073P6804 EFIS: 0712000436 | 07-LA-210-R39.7 | UPGRADE TRAFFIC SIGNAL SYSTEM. | LOS ANGELES COUNTY IN AZUSA AT ALAMEDA AVENUE | 07/23/2019 | 1 (07/12/2018) | Details CEM-3701 Report |
| 209949 | Project ID: 209949 DEA: 07287304 EFIS: 0700021033 | 07-LA-210-R39.8/R42.2 | STORM WATER MITIGATION AND EROSION CONTROL. | LOS ANGELES COUNTY IN AZUSA AND GLENDORA FROM LITTLE DALTON WASH TO 0.1 MILE EAST OF GLENDORA AVENUE UNDERCROSSING | 01/03/2020 | 1 (07/10/2017) | Details CEM-3701 Report |
| 209490 | Project ID: 209490 DEA: 074Y9204 EFIS: 0700020906 | 07-LA-14-R24.8/R32.1 | REPLACE CONCRETE SLABS. | LOS ANGELES COUNTY IN AND NEAR SANTA CLARITA FROM S14-S5 CONNECTOR OVERHEAD TO SANTA CLARA RIVER | 03/21/2016 | 1 (11/25/2014) | Details CEM-3701 Report |
| 214350 | Project ID: 214350 DEA: 07310804 EFIS: 0715000007 | 07-LA-14-R24.8/R31.4 | PAVE GORES, CONST MAINTENANCE VEHICLE PULLOUT AND VEGETATION CONTROL. | LOS ANGELES COUNTY IN AND NEAR SANTA CLARITA FROM I-5/14 INTERCHANGE TO CANYON PARK BOULEVARD UNDERCROSSING | 09/29/2020 | 1 (06/16/2020) | Details CEM-3701 Report |
| 4147 | Project ID: 4147 DEA: 072X3704 | 07-LA-14-R29.0/R31.2 | CONVERT LIGHTING FROM SERIES TO MULTIPLE CIRCUITS. | LOS ANGELES COUNTY IN AND NEAR SANTA CLARITA FROM 0.9 MILE SOUTH OF GOLDEN VALLEY ROAD OVERCROSSING TO 0.5 MILE NORTH OF VIA PRINCESSA UNDERCROSSING | 07/02/2012 | 1 (07/02/2012) | Details CEM-3701 Report |
| 215108 | Project ID: 215108 DEA: 07337604 EFIS: 0717000036 | 07-LA-14-R28.9/R29.2 | REPLACE EXISTING STORM DRAIN, AND CONSTRUCT A COLLECTION SYSTEM. | LOS ANGELES COUNTY IN AND NEAR SANTA CLARITA FROM 0.8 MILE NORTH OF PLACERITA CANYON ROAD UNDERCROSSING TO 0.5 MILE SOUTH OF GOLDEN VALLEY ROAD OVERCROSSING | 05/04/2023 | 1 (02/24/2021) | Details CEM-3701 Report |
| 3995 | Project ID: 3995 DEA: 072332A4 EFIS: 0700000390 | 07-LA-5-R46.3/R50.0 | WIDEN ROADWAY AND BRIDGES WITH PCC AND CONSTRUCT RETAINING WALLS. | LOS ANGELES COUNTY IN AND NEAR SANTA CLARITA FROM 0.3 MILE SOUTH OF WELDON CANYON OVERCROSSING TO 0.4 MILE SOUTH OF PICO CANYON ROAD/LYONS AVENUE OVERCROSSING | 06/02/2015 | 1 (04/23/2012) | Details CEM-3701 Report |
