Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6371-6380 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6478 | Project ID: 6478 DEA: 120A1144 MINOR: 12A1142 | 12-ORA-6641- | INSTALL UTILITIES , CONSTRUCT DRAINAGE AND PAVEMENT IMPROVEMENTS FOR OFFICE TRAILERS | 09/28/2012 | NOT VERIFIED | Details CEM-3701 Report | |
| 6479 | Project ID: 6479 DEA: 120A3904 | 12-ORA-5- 7.3 | REALIGN RAMP AND EXTEND RAMP METER | IN ORANGE COUNTY IN SAN JUANCAPISTRANO ON ROUTE 5 AT STONEHILLDRIVE AND CAMINO CAPISTRANO NORTHBOUND SERRA ON RAMP | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report |
| 6480 | Project ID: 6480 DEA: 120A4704 | 12-ORA-5- 2.8 | CONSTRUCT RETAINING WALL | IN ORANGE COUNTY IN SAN CLEMENTE AT AVENIDA PALIZADA NORTHBOUND ON RAMP | 06/29/2007 | 1 (10/31/2008) | Details CEM-3701 Report |
| 6481 | Project ID: 6481 DEA: 120A7304 | 12-ORA-5-22.2 | PLANTING AND IRRIGATION | IN ORANGE COUNTY IN IRVINE ANDTUSTIN FROM 0.3 KM SOUTH OF ALTON PARKWAY OVERCROSSING TO 0.3 KMNORTH OF TUSTIN RANCH ROAD OVERCROSSING | 04/18/2012 | 1 (04/18/2012) | Details CEM-3701 Report |
| 6482 | Project ID: 6482 DEA: 120A7614 | 12-ORA-405-25.6/26.3 | Add an off ramp channelization lane | 07/13/2007 | 1 (10/30/2008) | Details CEM-3701 Report | |
| 6483 | Project ID: 6483 DEA: 120A7624 | 12-ORA-405-24.8/26.2 | WIDEN ROADWAY | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
| 6484 | Project ID: 6484 DEA: 120A9204 | 12-ORA-241-KP29.9-30.6 | A new Bridge, Trabuco Creek Bridge, Left Plans, was added as a CCO # 8 to EA 12-0A9204, as Southbound 241 roadway and overhead sign plans | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
| 6485 | Project ID: 6485 DEA: 120A9314 | 12-ORA-133-12.6 | SR 133 East Leg Widening Project. One lane is being added to the median side to both the NB & SB SR 133. MBGR will be installed as a median barrier along the entire length of the project | 2.5 miles in length and is located between the I-5 freeway and the SR 241 on the SR 133. | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report |
| 6486 | Project ID: 6486 DEA: 120A9324 MINOR: 12A9321 | 12-ORA-241- | 09/09/2016 | NOT VERIFIED | Details CEM-3701 Report | ||
| 6487 | Project ID: 6487 DEA: 120A9704 EFIS: 1200000068 | 12-ORA-73- | Widen Jamboree across SR73 in the City of Newport Beach. | 09/09/2016 | NOT VERIFIED | Details CEM-3701 Report |
