Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6311-6320 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213635 | Project ID: 213635 DEA: 044H9804 EFIS: 0413000351 | 04-MRN-101-4.6/5.7 | INSTALL CONCRETE BARRIER AND DRAINAGE IMPROVEMENTS | MARIN COUNTY NEAR MILL VALLEY FROM REDWOOD HIGHWAY FRONTAGE ROAD TO ROUTE 131 (TIBURON BOULEVARD/EAST BLITHEDALE AVENUE) | 03/26/2020 | 1 (02/01/2019) | Details CEM-3701 Report |
| 213634 | Project ID: 213634 DEA: 044G5604 EFIS: 0412000504 | 04-SOL-12,113-18.9/19.4,0.0/0.2 | INSTALL SINGLE LANE ROUNDABOUT | SOLANO COUNTY NEAR RIO VISTA ON ROUTE 12 FROM 0.2 MILE WEST TO 0.2 MILE EAST OF ROUTE 113 AND ON ROUTE 113 FROM ROUTE 12 TO 0.2 MILE NORTH OF ROUTE 12 | 04/22/2020 | 1 (08/14/2019) | Details CEM-3701 Report |
| 213633 | Project ID: 213633 DEA: 042J5904 EFIS: 0414000535 | 04-CC-4-48.1/48.3 | CONSTRUCT RETAINING WALLS TO REPAIR STORM DAMAGE SLIP-OUTS. | CONTRA COSTA COUNTY AT BYRON FROM 0.2 MILE WEST OF OLD RIVER BRIDGE TO OLD RIVER BRIDGE | 10/21/2019 | 1 (12/17/2018) | Details CEM-3701 Report |
| 213632 | Project ID: 213632 DEA: 042J5404 EFIS: 0414000527 | 04-SON-1-24.4 | CONSTRUCT RETAINING WALL, DRAINAGE SYSTEM, AND ROCK SLOPE PROTECTION | SONOMA COUNTY NEAR JENNER AT 0.1 MILE SOUTH OF RUSSIAN GULCH BRIDGE | 06/20/2022 | 1 (08/19/2019) | Details CEM-3701 Report |
| 213631 | Project ID: 213631 DEA: 04270104 EFIS: 0412000131 | 04-ALA-580-R30.8/R41.5 | REPLACE SLABS, RESURFACE SHOULDER & RAMPS & CONSTRUCT MBGR & BARRIER | ALAMEDA COUNTY FROM ROUTE 580/ROUTE 238 SEPARATION TO BOSTON AVENUE UNDERCROSSING. | 01/13/2023 | 1 (04/23/2019) | Details CEM-3701 Report |
| 213630 | Project ID: 213630 DEA: 120Q5904 EFIS: 1217000068 MINOR: 12A1742 | 12-ORA-405-11.4 | TO OVERLAY THE LOOP ON-RAMP FROM NB HABOR BLVD TO NB ROUTE 405 AND COLD PLANE AND PAVE TO A DEPTH OF 0.2' ON NB HARBOR BLVD FROM STA. 10+33 TO 28+80 | FOR CONSTRUCTION ON STATE HIGHWAY IN IN ORANGE COUNTY IN THE CITY OF COSTA MESA, from Northbound Harbor Bvld Loop On Ramp to Northbound Route 405 In District 12 On Route 405 Undercrossing | 07/15/2021 | 1 (09/20/2018) | Details CEM-3701 Report |
| 213629 | Project ID: 213629 DEA: 081K2904 EFIS: 0819000011 | 08-RIV,RIV-74-36.92 | Remove and replace culverts | 09/04/2019 | 1 (12/31/2018) | Details CEM-3701 Report | |
| 213628 | Project ID: 213628 DEA: 034H7004 EFIS: 0319000031 | 03-SAC-5,5-15.94/24.64, L0.50/R5.75, 0.0/24.64 & L0.5/R5.75 | Remove and replace failed PCC slabs, striping, incidental work, and traffic control | 05/04/2021 | 1 (01/08/2019) | Details CEM-3701 Report | |
| 213627 | Project ID: 213627 DEA: 060Y5904 EFIS: 0619000032 | 06-FRE-180-130.17/137.7 | Repair slope washout | 02/29/2024 | 1 (01/31/2020) | Details CEM-3701 Report | |
| 213626 | Project ID: 213626 DEA: 051J8104 EFIS: 0518000072 | 05-SB-246-30.3/32.1 | Santa Ynez Bike Path Repair | 1 (09/06/2019) | Details CEM-3701 Report |
