Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6121-6130 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 208567 | Project ID: 208567 DEA: 051C6404 EFIS: 0512000184 | 05-MON-101-66.4 | Repair Bridge | In Soledad at the Soledad Prison Overcrossing | 06/12/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 208571 | Project ID: 208571 DEA: 024E9904 EFIS: 0212000116 | 02-PLU,PLU-36,70-26.0/R26.6,90.5/96.0 | HMA THIN BLANKET WITH DIGOUTS | LASSEN AND PLUMAS COUNTIES ON ROUTE 36 FROM RUSSEL AVENUE TO 0.1 MILE WEST OF SUSAN RIVER BRIDGE AND ON ROUTE 70 FROM 0.7 MILE WEST OF SUMMIT SCHOOL DRIVE TO LASSEN COUNTY LINE | 01/02/2015 | 1 (02/27/2013) | Details CEM-3701 Report |
| 208572 | Project ID: 208572 DEA: 100L3304 EFIS: 1000000100 COOP: 10355 Permit Numbers: 1012NMC0508 | 10-STA-99-0.0/0.3 | Reconsteuct SR99/Kiernan Interchange | City of Salida, in STA County | 03/09/2020 | 1 (03/25/2013) | Details CEM-3701 Report |
| 208573 | Project ID: 208573 Permit Numbers: 0412NRW2131 0411NSN1865 04136DP0031 | 04-CC-80-1.67/1.67 | This proposal involves the modification of the traffic signal at the intersection of Potrero Ave/i-80 EB off -ramp/East shore Blvd. | i-80 Ramps at Potrero Ave., El Cerrito | 09/14/2018 | 1 (02/13/2013) | Details CEM-3701 Report |
| 208574 | Project ID: 208574 DEA: 03371204 EFIS: 0300000425 COOP: 030419 | 03-SAC-50-R5.0/R5.9 | Watt Ave @ Route 50 Interchange Improvements. In the city of Sacramento, on Route 50 | At Watt Avenue from La Riviera Drive to Kiefer Boulevard. Modify the interchange, widen Watt Avenue, and add bike/pedestrian and public transit facilities. | 03/09/2020 | 1 (02/07/2013) | Details CEM-3701 Report |
| 208584 | Project ID: 208584 DEA: 04041004 EFIS: 0400000044 | 04-SM,ALA-92-R14.4/R18.8,R0.0/R2.6 | Polyester Concrete Overlay. | San Mateo Bridge 04-SM,Ala-92-R14.4/R18.8,R0.0/R2.6 | 12/22/2016 | 1 (02/06/2013) | Details CEM-3701 Report |
| 208634 | Project ID: 208634 DEA: 060P4004 EFIS: 0612000153 MINOR: 06A1820 | 06-KER-184-L0.0 | Construct Jointed Plani Concrete Pavement ( Rapid Strength Concrete) | In Kern County Near Weed patch at Rte 223 | 10/19/2020 | 1 (02/26/2013) | Details CEM-3701 Report |
| 208588 | Project ID: 208588 DEA: 041F7104 EFIS: 0412000311 MINOR: 04A4141 | 04-SM-82-13.7 | INSTALL DRAINAGE SYSTEM, DRAINAGE INLETS AND PORTLAND CEMENT CONCRETE SIDEWALK AND CURB & GUTTER | In Burlingame at Oak Grove Ave | 02/12/2025 | 1 (03/01/2013) | Details CEM-3701 Report |
| 208589 | Project ID: 208589 DEA: 033F4104 EFIS: 0312000283 | 03-PLA-49,80,193-0.0/0.9 | REPLACE EXISTING METAL BEAM GUARDRAIL WITH CONCRETE BARRIER RAIL. | NEAR AUBURN AND COLFAX, ON ROUTES 49, 80, AND 193 AT VARIOUS LOCATIONS. | 12/04/2014 | 1 (02/11/2013) | Details CEM-3701 Report |
| 208590 | Project ID: 208590 DEA: 044H6204 EFIS: 0413000226 | 04-SM-1-16.8/17.1 | Construct Rock Slope Protection | In SM County , near Gregorian, from 0.4 mile to 0.7 mile north of Pomponio Creek | 07/24/2023 | 1 (02/14/2013) | Details CEM-3701 Report |
