Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6061-6070 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213895 | Project ID: 213895 DEA: 09375804 | 09-INY,MNO-6,168,395-Various | COLD PLANE ASPHALT CONCRETE PAVEMENT AND PLACE HOT MIX ASPHALT. | INYO AND MONO COUNTIES AT VARIOUS LOCATIONS | 01/06/2020 | NOT VERIFIED | Details CEM-3701 Report |
| 213894 | Project ID: 213894 DEA: 081H5304 EFIS: 0817000074 | 08-RIV,SBD-10,15,60,91,210,215-Var | REPAIR DETECTION SITES | RIVERSIDE AND SAN BERNARDINO COUNTIES AT VARIOUS LOCATIONS | 08/09/2021 | 1 (10/22/2019) | Details CEM-3701 Report |
| 213893 | Project ID: 213893 DEA: 060X1004 EFIS: 0618000232 | 06-FRE-168-64.1,65.7 | REPLACE APPROACH SLAB AND PLACE POLYESTER CONCRETE OVERLAY. | FRESNO COUNTY ABOUT 16 MILES NORTH OF SHAVER LAKE AT BIG CREEK BRIDGE AND AT RANCHERIA CREEK BRIDGE | 01/31/2020 | 1 (04/11/2019) | Details CEM-3701 Report |
| 213892 | Project ID: 213892 DEA: 060W9504 EFIS: 0617000275 | 06-FRE-41-R24.5 | CONSTRUCT CONCRETE BARRIER. | FRESNO COUNTY IN FRESNO AT THE NORTHBOUND ROUTE 41/WESTBOUND ROUTE 180 CONNECTOR | 12/04/2019 | 1 (04/11/2019) | Details CEM-3701 Report |
| 213891 | Project ID: 213891 DEA: 060U5104 EFIS: 0615000292 | 06-KER-166-4.7/5.0 | COLD PLANE AND RESURFACE PAVEMENT AND WIDEN SHOULDERS. | KERN COUNTY NEAR MARICOPA FROM 1.7 MILES EAST OF PENTLAND ROAD TO BASIC SCHOOL ROAD | 12/04/2019 | 1 (04/11/2019) | Details CEM-3701 Report |
| 213890 | Project ID: 213890 DEA: 031G4104 EFIS: 0318000170 | 03-NEV-20-0.0/25.8 | STRIPING | NEVADA COUNTY FROM THE YUBA COUNTY LINE TO PINE NEEDLE LANE | 09/06/2019 | 1 (02/21/2019) | Details CEM-3701 Report |
| 213889 | Project ID: 213889 DEA: 030H5104 EFIS: 0315000201 | 03-YUB-70-R11.0/13.6 | REMOVE THRIE-BEAM MEDIAN BARRIER & INSTALL CONCRETE MEDIAN BARRIER. | YUBA COUNTY NEAR LINDA AND MARYSVILLE FROM 0.3 MILE SOUTH OF FEATHER RIVER BOULEVARD UNDERCROSSING TO THE YUBA RIVER BRIDGE AND OVERHEAD | 05/11/2020 | 1 (02/21/2019) | Details CEM-3701 Report |
| 213888 | Project ID: 213888 DEA: 024H2704 EFIS: 0218000101 | 02-SHA-44-34.0/43.2 | PLACE HMA (TYPE A) OVERLAY. | SHASTA COUNTY AT AND NEAR VIOLA FROM 0.2 MILE EAST OF MILL CREEK ROAD TO 0.8 MILE EAST OF DEER FLAT ROAD | 12/04/2019 | 1 (04/03/2019) | Details CEM-3701 Report |
| 213887 | Project ID: 213887 DEA: 024H2604 EFIS: 0218000100 | 02-SIS-97-R11.5/17.1 | COLD PLANE AC, REPLACE AC SURFACING, PLACE AC, RUMBLE STRIP & STRIPE. | SISKIYOU COUNTY ABOUT 12 MILES NORTH OF WEED FROM YELLOW BUTTE ROAD TO 0.6 MILE NORTH OF DEER MOUNTAIN ROAD | 01/04/2021 | 1 (04/03/2019) | Details CEM-3701 Report |
| 213886 | Project ID: 213886 DEA: 022H1804 EFIS: 0216000063 | 02-SIS-161-18.3/19.4 | FULL DEPTH RECLAMATION - CEMENT WITH HMA (TYPE A) | SISKIYOU COUNTY NEAR TULELAKE FROM 1.0 MILE EAST OF HILL ROAD TO ROUTE 139 | 08/06/2019 | 1 (04/03/2019) | Details CEM-3701 Report |
