Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6041-6050 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213916 | Project ID: 213916 DEA: 06484664 EFIS: 0618000213 COOP: 061681 | 06-KER-58,99-R52.1/R52.5 | RT 58/99 BAKERSFIELD FREEWAY CONNECTOR -widening the existing SR 58/SR 99 grade separation structure and realigning the Westbound to Southbound loop connector. Auxiliary lane and collector-distributor lanes on Southbound SR 99. | SR 58/SR 99 | 2 (03/12/2021) | Details CEM-3701 Report | |
| 213915 | Project ID: 213915 DEA: 081J9804 EFIS: 0818000151 | 08-SBD,RIV-60,91-VAR | REMOVE AND REPLACE TRAFFIC STRIPE, PAVEMENT MARKING & MARKERS. | SAN BERNARDINO AND RIVERSIDE COUNTIES AT VARIOUS LOCATIONS | 11/12/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 213914 | Project ID: 213914 DEA: 060U9704 EFIS: 0617000287 | 06-KER,TUL-5,99,137,166,198,204-Various | TREATING BRIDGE DECKS WITH METHACRYLATE AND REPLACING JOINT SEAL. | KERN AND TULARE COUNTIES AT VARIOUS LOCATIONS | 12/04/2019 | 1 (04/12/2019) | Details CEM-3701 Report |
| 213913 | Project ID: 213913 DEA: 034F8304 EFIS: 0314000300 | 03-YOL-5-0.4/R28.9 | ROADSIDE PAVING, CONSTRUCT INLETS, REPLACE SIGNS & MODIFY ELECTRICAL. | YOLO COUNTY AT VARIOUS LOCATIONS FROM SACRAMENTO RIVER BRIDGE TO COLUSA COUNTY LINE | 09/28/2021 | 1 (02/21/2019) | Details CEM-3701 Report |
| 213912 | Project ID: 213912 DEA: 033H71U4 EFIS: 0319000051 | 03-BUT-70-8.8/12.1 | WIDEN RDWY, RDWY EX, HMA & MODIFY ELECT SYSTEM. | BUTTE COUNTY NEAR OROVILLE FROM 0.1 MILE SOUTH OF PALERMO ROAD TO 0.6 MILE NORTH OF OPHIR ROAD | 09/23/2021 | 1 (02/21/2019) | Details CEM-3701 Report |
| 213911 | Project ID: 213911 Permit Numbers: 11166RW0780 | 11-SD-8-0.77-0.87 | Install bus stop, modify street island and update accessible push buttons and signal head at I-8 exit 3 south bound ramp to Taylor Street. | I-8 exit 3 south bound ramp to Taylor Street | 08/24/2021 | 1 (01/30/2019) | Details CEM-3701 Report |
| 213910 | Project ID: 213910 Permit Numbers: 0716AMC1295 0717ART1069 | 07--605-23.1/23.6 | Widening ramp from 1 lane to 2 lanes including signalized, striping, pavement relocate street lights and replacement drainage inlet | Live Oak Ave., Irwindale | 06/17/2021 | 1 (06/17/2021) | Details CEM-3701 Report |
| 213909 | Project ID: 213909 Permit Numbers: 0618NTN0211 06196DP0068 0618NRT0988 0619NRT0152 | 06-FRE-145-23.67 | Install 4-72" Rubber Gasket Reinforced Concrete Pipe (RGRCP) crossing under State Route 145 using Bore and Jack method (as shown on the attached plans). The bore and receiving pits are located outside the State Right of Way. | Floral Av, Helm | 11/30/00-1 | 1 (03/12/2019) | Details CEM-3701 Report |
| 213908 | Project ID: 213908 DEA: 034F5104 EFIS: 0314000174 COOP: 030678 | 03-SAC-50-10.9/11.1 | Widen Zinfandel Drive, west side on southbound traffic, by adding a precast girder structure (12') and modify existing traffic control electrical systems at Zinfandel Dr. and White Rock Rd, US 50 westbound off ramp to Zinfandel Dr. | Agency is City of Rancho Cordova, US 50 and Zinfandel Drive, Sacramento | 07/26/2021 | 2 (08/20/2019) | Details CEM-3701 Report |
| 213907 | Project ID: 213907 DEA: 034H1704 EFIS: 0318000199 COOP: 030650 | 03-PLA-80,174-33.0/33.1 | In Colfax, at the I-80 westbound onramps and offramps to SR 174 (PM 33.0/33.1) - Install roundabout. Two Type 15 pole and luminaires in Caltrans Right of Way. | City of Colfax S. Auburn Street and WB I-80 On-Off-Ramp Roundabout Project | 02/10/2021 | 2 (02/19/2019) | Details CEM-3701 Report |
