Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5941-5950 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 215581 | Project ID: 215581 DEA: 061B0104 EFIS: 0620000139 | 06-MAD-41-13.4/35.2 | COLD PLANE AC PAVEMENT AND PLACE HMA (TYPE A). | MADERA COUNTY AT VARIOUS LOCATIONS FROM 2.0 MILES NORTH OF ROAD 208 TO 0.1 MILE SOUTH OF ROYAL OAKS DRIVE | 10/03/2022 | 1 (03/22/2021) | Details CEM-3701 Report |
| 212954 | Project ID: 212954 DEA: 060W6704 | 06-MAD-41-36.1/44.8 | REPAIR AND RELINE CULVERTS | MADERA COUNTY AT VARIOUS LOCATIONS FROM 0.6 MILE NORTH OF JUNCTION ROUTE 49 TO 0.5 MILE NORTH OF ROAD 630 | 12/20/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 212730 | Project ID: 212730 DEA: 060U7104 EFIS: 0616000025 | 06-MAD-41,49,145-Var | CONSTRUCT RUMBLE STRIP IN EXISTING AC PAVEMENT. | MADERA COUNTY AT VARIOUS LOCATIONS | 09/05/2018 | 1 (04/10/2018) | Details CEM-3701 Report |
| 213305 | Project ID: 213305 DEA: 060R1604 EFIS: 0614000043 | 06-MAD-41-36.3/40.8 | RESURFACE ROADWAY WITH HMA (TYPE A). | MADERA COUNTY AT OAKHURST FROM 0.5 MILE NORTH OF ROAD 426 TO 0.1 MILE NORTH OF ALLEN ROAD. | 10/17/2019 | 1 (09/25/2018) | Details CEM-3701 Report |
| 215553 | Project ID: 215553 DEA: 061A8704 EFIS: 0620000133 | 06-MAD-49-0.1/9.1 | CULVERT REPLACEMENT AND INSTALL CURED-IN PLACE PIPELINER. | MADERA COUNTY AT AND NEAR OAKHURST AT VARIOUS LOCATIONS FROM 0.1 MILE WEST OF ROUTE 41 TO 0.2 MILE SOUTH OF MARIPOSA COUNTY LINE | 03/02/2022 | 1 (03/10/2021) | Details CEM-3701 Report |
| 10015 | Project ID: 10015 DEA: 060P7604 | 06-MAD-41-9.3/15.4,20.9/45.7 | REPLACE PAVEMENT DELINEATION. | MADERA COUNTY AT AND NEAR COARSEGOLD FROM 0.1 MILE NORTH OF ROUTE 145 TO 0.2 MILE SOUTH OF ROAD 406 AND FROM 0.9 MILE NORTH OF YOSEMITE SPRINGS PARKWAY TO THE MARIPOSA COUNTY LINE | 10/08/2014 | 1 (10/08/2014) | Details CEM-3701 Report |
| 10013 | Project ID: 10013 DEA: 060P7004 EFIS: 0612000244 | 06-MAD-145-20.9/25.4 | COLD PLANE AND HOT MIX ASPHALT OVERLAY. | MADERA COUNTY ABOUT 9 MILES EAST OF MADERA FROM ROAD 37 TO ROUTE 41 | 10/19/2020 | 1 (05/24/2013) | Details CEM-3701 Report |
| 209105 | Project ID: 209105 DEA: 060R0404 EFIS: 0613000309 COOP: 061559 | 06-MAD-41-3.2/9.2 | Freeway Improvements | Madera County | 2 (10/09/2013) | Details CEM-3701 Report | |
| 210030 | Project ID: 210030 DEA: 060G9004 EFIS: 0600000112 COOP: 061592 | 06-MAD-41-11.7/13.4 | PASSING LANES | MADERA COUNTY | 04/19/2018 | 1 (07/21/2015) | Details CEM-3701 Report |
| 3039 | Project ID: 3039 Permit Numbers: 0609NSN0903 | 06-FRE-145-34.62/34.62 | 1) increase radii of curb returns on SE and SW corners of the Kearney Blvd intersection with SR-145, and 2) add a right turn lane to westbound Kearney Blvd approaching SR 145, and 3) Install 2 drain inlets and 36 feet of 10-inch concrete pipe, and 4) repleace | Madera Avenue, Kerman | 04/27/2018 | 2 (11/25/2014) | Details CEM-3701 Report |
