Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5841-5850 of 18884 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1000260 | Project ID: 1000260 DEA: 010L7404 EFIS: 0122000041 | 01-MEN-128-37.4/49.4 | CORRUGATED STEEL PIPE, STRUCTURAL CONCRETE HEADWALL, REMOVE CULVERT. | MENDOCINO COUNTY AT VARIOUS LOCATIONS FROM 0.9 MILE EAST OF FISH ROCK ROAD - ROAD 122 TO 1.5 MILES WEST OF END OF COUNTY | 09/23/2025 | 1 (04/15/2024) | Details CEM-3701 Report |
| 6033 | Project ID: 6033 DEA: 11232304 EFIS: 1100000153 | 11-SD-125-0.0/9.6 | COSNTRUCT 8 LANE FWY AND INTERCHANGE WITH HOV | 08/17/2021 | 2 (07/09/2021) | Details CEM-3701 Report | |
| 1001010 | Project ID: 1001010 DEA: 022K1104 EFIS: 0225000036 | 02--5-41.98/0.14 | Cottonwood Creek Bridge Joint Replacement | 1 (02/18/2025) | Details CEM-3701 Report | ||
| 1001890 | Project ID: 1001890 DEA: 060V1214 EFIS: 0622000003 MINOR: 06A3212 | 06-MAD-99-6.9/7.6 | Cottonwood Creek Bridge Rehab Landscape Project. Plant, irrigate, and maintain 122 trees. | Construction on the State Highway in Madera County near Madera at Cottonwood Creek Bridge. | 12/30/2025 | 1 (12/30/2025) | Details CEM-3701 Report |
| 993141 | Project ID: 993141 DEA: 060V1204 EFIS: 0616000207 | 06-MAD-99-R6.9/R7.6 | Cottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS. | MADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING | 12/02/2025 | 1 (07/28/2021) | Details CEM-3701 Report |
| 993561 | Project ID: 993561 DEA: 080L1904 EFIS: 0800000398 | 08-RIV-74-M7.37/R8.27 | County of Riverside Transportation Department (RCTD) is constructing the final phase of the Clinton Keith Road Extension Project between Leon Road and SR 79 to provide an east-west urban arterial between Interstate 215 and SR 79. | 2 (02/10/2022) | Details CEM-3701 Report | ||
| 212187 | Project ID: 212187 DEA: 010F8904 EFIS: 0116000089 | 01-MEN-162-25.7/29.8 | COVELO REPLACE AC AND BWC OVERLAY | MENDOCINO COUNTY AT COVELO FROM 2.6 MILES WEST OF GRIST CREEK BRIDGE TO 0.5 MILE WEST OF MILL CREEK BRIDGE | 10/01/2018 | 1 (07/06/2017) | Details CEM-3701 Report |
| 1301 | Project ID: 1301 DEA: 034E4104 | 03-ED-50-67.8/68.6 | COVER CUT SLOPES WITH CABLE MESH DRAPERY SYSTEM | 10/25/2010 | 1 (08/20/2009) | Details CEM-3701 Report | |
| 2561 | Project ID: 2561 DEA: 050G0304 EFIS: 0500000054 | 05-SLO-101-35.6/46.3 | Crack & Seat, Replace Pcc, Place Hma On Hwy & Ramps And Widen Bridges | 08/13/2018 | 1 (10/01/2012) | Details CEM-3701 Report | |
| 2057 | Project ID: 2057 DEA: 04253784 | 04-SCL,ALA-680-M11.9/M15.9,M0.0/M5.4 | CRACK AND SEAL PCC PVMT, WIDEN BRIDGES | In Santa Clara and Alameda Counties from 0.4 KM South of Route 237/680 separation to Grimmer Blvd undercrossing | 05/11/2011 | 1 (05/11/2011) | Details CEM-3701 Report |
