Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5841-5850 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213153 | Project ID: 213153 DEA: 044S7804 EFIS: 0400020145 | 04-MRN-1-24.7 | REPLACE EXISTING CULVERTS WITH 36' REINFORCED CONCRETE SLAB BRIDGE. | MARIN COUNTY NEAR OLEMA AT 1.8 MILES SOUTH OF SIR FRANCIS DRAKE BOULEVARD | 10/17/2019 | 1 (06/12/2018) | Details CEM-3701 Report |
| 1001643 | Project ID: 1001643 DEA: 042Q5004 | 04-MRN-37-14.5 | POLYESTER CONC OVERLAY, CONC BARRIER, STRUCTURAL CONC, FENDER SYSTEM. | MARIN COUNTY NEAR NOVATO AT PETALUMA RIVER BRIDGE | NOT VERIFIED | Details CEM-3701 Report | |
| 6881 | Project ID: 6881 DEA: 043S5804 EFIS: 0400001008 | 04-MRN-37-12.1 | CONSTRUCT RETAINING WALL. | MARIN COUNTY NEAR NOVATO AT NOVATO CREEK BRIDGE | 06/21/2013 | 1 (12/05/2011) | Details CEM-3701 Report |
| 211853 | Project ID: 211853 DEA: 042G8904 EFIS: 0400021259 | 04-MRN-1-8.0 | SOLDIER PILE WALL WITH TIEBACKS AND EMBANKMENT CONFINED SYSTEM. | MARIN COUNTY NEAR MUIR BEACH AT 2.1 MILES NORTH OF MUIR WOODS ROAD | 12/22/2017 | 1 (03/15/2017) | Details CEM-3701 Report |
| 212521 | Project ID: 212521 DEA: 043S9104 EFIS: 0400001044 | 04-MRN-1-7.7/7.8 | CONSTRUCT SOLDIER PILE WALL | MARIN COUNTY NEAR MUIR BEACH AT 0.2 MILE NORTH OF COLD STREAMFIRE ROAD. | 09/19/2018 | 1 (07/17/2017) | Details CEM-3701 Report |
| 2287 | Project ID: 2287 DEA: 043S5624 | 04-MRN-1-9.1 | EXCAVATE HILL AND REBUILD SLOPE. | MARIN COUNTY NEAR MUIR BEACH ABOUT 3.2 MILES NORTH OF MUIR WOODS ROAD | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 213635 | Project ID: 213635 DEA: 044H9804 EFIS: 0413000351 | 04-MRN-101-4.6/5.7 | INSTALL CONCRETE BARRIER AND DRAINAGE IMPROVEMENTS | MARIN COUNTY NEAR MILL VALLEY FROM REDWOOD HIGHWAY FRONTAGE ROAD TO ROUTE 131 (TIBURON BOULEVARD/EAST BLITHEDALE AVENUE) | 03/26/2020 | 1 (02/01/2019) | Details CEM-3701 Report |
| 7650 | Project ID: 7650 DEA: 043S5704 EFIS: 0400001007 COOP: 042426 | 04-MRN--37.1 | REPLACE CULVERT, INSTALL ROCK SLOPE PROTECTION, AND HIGHWAY PLANTING | MARIN COUNTY NEAR MARSHALL AT 1.3 MILES SOUTH OF MARSHALL-PETALUMA ROAD | 07/24/2023 | 1 (10/01/2012) | Details CEM-3701 Report |
| 993384 | Project ID: 993384 DEA: 040AA444 EFIS: 0419000476 | 04-MRN-1-22.8 | MAINTAIN EXISTING PLANTED AREAS, PLANTING AND EROSION CONTROL. | MARIN COUNTY NEAR FIVE BROOKS AT GIACOMINI GULCH BRIDGE | 09/05/2025 | 1 (12/27/2021) | Details CEM-3701 Report |
| 210339 | Project ID: 210339 DEA: 043E3404 EFIS: 0412000297 | 04-MRN-1-17.0/19.0 | PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED). | MARIN COUNTY NEAR BOLINAS FROM 0.1 MILE SOUTH OF FAIRFAX BOLINAS ROAD TO 1.5 MILES NORTH OF HORSESHOE HILL ROAD | 09/07/2022 | 1 (09/18/2015) | Details CEM-3701 Report |
