Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5801-5810 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7595 | Project ID: 7595 DEA: 080C1214 EFIS: 0800000037 | 08-SBD-395-19.0/35.6 | WIDEN MEDIAN And SHOULDERS, INSTALL MEDIAN and SHOULDER RUMBLE STRIPS. | SAN BERNARDINO COUNTY FROM 7.9 MILES NORTH OF STATE ROUTE 18 TO 10.4 MILES SOUTH OF STATE ROUTE 58 | 01/29/2015 | 1 (09/24/2012) | Details CEM-3701 Report |
| 7596 | Project ID: 7596 DEA: 100S9404 EFIS: 1000000268 | 10-MER-152-R6.0/R10.1 | INSTALL DOUBLE THRIE BEAM BARRIER. | MERCED COUNTY ABOUT 10 MILES WEST OF LOS BANOS FROM SAN LUIS DAM SERVICE ROAD TO SAN LUIS FOREBAY BRIDGE | 08/30/2013 | 1 (09/17/2012) | Details CEM-3701 Report |
| 7597 | Project ID: 7597 EFIS: 0000001155 Permit Numbers: 07126DP1325 | 07-LA-710-24.316/24.316 | Double Permit to Permit No. 708-NSN-2285Install new Traffic Signal, install conduits, pull boxes, traffic signal standards with necessary foundations. Model 2070 Controller & Type IIIBF Service Cabinet to be furnished by Caltrans. | Ford Blvd. N/B off ramp, Los Angeles | 07/31/2018 | 1 (12/12/2012) | Details CEM-3701 Report |
| 7598 | Project ID: 7598 DEA: 042332C4 EFIS: 0400000668 COOP: 042346 Permit Numbers: 0412NDP1301 0412NMC0521 0412NRD1458 0412NRD0731 | 04-ALA-262-0/0.5 | Phase 1B of the 1-880/mission Boulevard improvements includes:The demolition of two single-track freight rail bridges; | Warm Springs Blvd, Fremont | 06/03/2015 | 1 (12/12/2012) | Details CEM-3701 Report |
| 7599 | Project ID: 7599 EFIS: 0700021206 MINOR: 07A3212 | 07-LA-210-23.3 | INSTALL ADDITIONAL SAFETY LIGHTING, SIGNING & UPGRADE ADA RAMPS ON BURBANK BLVD | AT THE SB ROUTE 101 FREEWAY IN THE CITY OF LOS ANGELES | 1 (12/11/2012) | Details CEM-3701 Report | |
| 7601 | Project ID: 7601 DEA: 024F6404 EFIS: 0212000172 | 02-SIS-96-27.7 | REMOVE DEBRIS | ABOUT 13 MILES WEST OF HAPPY CAMP AT 0.8 MILE WEST OF INDEPENDENCE | 11/07/2012 | 1 (09/10/2012) | Details CEM-3701 Report |
| 7607 | Project ID: 7607 DEA: 100V3704 EFIS: 1000020035 MINOR: 10A1438 | 10-CAL-4,108,120-VAR | INSTALL RADIO COMMUNICATION ON ROUTE 4, 108, 120 | IN CALAVERAS AND TUOLUMNE COUNTIES AT VARIOUS LOCATIONS | 12/05/2019 | 1 (01/06/2014) | Details CEM-3701 Report |
| 7608 | Project ID: 7608 DEA: 044G2804 COOP: 42078A1 | 04-ALA-80- | PLEASE SEE EA 04-4G2904 FOR PROJECT INFO-----------SFOBB Toll Canopy Renovations | PLEASE SEE EA 04-4G2904 FOR PROJECT INFO-------------SFOBB Toll Crossing | 09/17/2012 | 1 (10/10/2012) | Details CEM-3701 Report |
| 7609 | Project ID: 7609 DEA: 020E4504 EFIS: 0200020065 | 02-TEH-5-R5.6/42.1 | PLACE MULCH AND CONSTRUCT MAINTENANCE PULLOUTS | TEHAMA COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF LIBERAL AVENUE OVERCROSSING TO 0.1 MILE NORTH OF BOWMAN ROAD OVERCROSSING | 01/02/2015 | 1 (09/10/2012) | Details CEM-3701 Report |
| 7610 | Project ID: 7610 DEA: 060G8304 EFIS: 0600020165 | 06-KER-99-17.0/22.1 | WIDEN FREEWAY FROM 6 LANES TO 8 LANES WITH PCC AND HMA | KERN COUNTY IN BAKERSFIELD FROM 0.5 MILE SOUTH OF ROUTE 119 TO WILSON ROAD | 01/23/2015 | 1 (10/15/2012) | Details CEM-3701 Report |
