Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5801-5810 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213564 | Project ID: 213564 DEA: 071XH604 EFIS: 0719000015 | 07-LA-210-R37.8/R38.0, R37.8-R38.0 | Remove depressed pavement, replace the base material and replace the concrete slabs | 11/04/2019 | NOT VERIFIED | Details CEM-3701 Report | |
| 208665 | Project ID: 208665 DEA: 060M6204 EFIS: 0600020509 | 06-KER,KIN-5,14,58,202,204-Var | REMOVE DECK SURFACE, PLACE DECK SEALS, APPROACH SLAB AND JOINT SEALS. | KERN AND KINGS COUNTIES AT VARIOUS LOCATIONS | 10/22/2020 | 1 (08/22/2013) | Details CEM-3701 Report |
| 4368 | Project ID: 4368 DEA: 074L3404 | 07-VEN-33-55.8/56.1 | REMOVE DEBRIS/REBUILD EMBANKMENT | IN VEN 33 AT PM 55.8 IN THE LOS PADRESNATIONAL FOREST 43 MI OF OJAI & 2 MI SO.OFSANTA BARBARA COUNTY LINE/REMOVE DEBRIS DIR'S EMERGENCY F.A. CONTRACT | 08/10/2010 | 1 (08/10/2010) | Details CEM-3701 Report |
| 995427 | Project ID: 995427 DEA: 072XG904 EFIS: 0723000168 | 07-LA-1-44.16/58.5 | Remove debris, scale slopes, | 1 (01/22/2024) | Details CEM-3701 Report | ||
| 995145 | Project ID: 995145 DEA: 081P6804 EFIS: 0824000077 | 08-RIV-62-3.34/6.5 | Remove Debris, Restore Undermined Roadway, Repair Damaged Bridge Piers) | 3B08-Riv,SBd-62-R3.34/R6.5, 0.0/R2.64 4BOn HWY 62 in Riv & SBd Counties in Morongo Valley Fr 3.2 Mi W/o Indian Canyon Dr to 0.5 Mi W/o Big Morongo Canyon Rd 5B | 11/20/2025 | 1 (09/11/2023) | Details CEM-3701 Report |
| 5027 | Project ID: 5027 DEA: 080L0904 | 08-SBD-15-R13.0/R16.0,R28.0/32.0 | REMOVE DEBRIS, REPLACE MBGR, AND EROSION CONTROL | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
| 995391 | Project ID: 995391 DEA: 11431784 EFIS: 1123000154 | 11-SD-94-35.9/60 | Remove debris, repair MGS, pavement,scale slopes | 1 (06/11/2024) | Details CEM-3701 Report | ||
| 995314 | Project ID: 995314 DEA: 072XC904 EFIS: 0723000088 | 07-LA-5-R63.43/R65.97, R63.43/R68.5 | Remove debris, rebuild slope, pavement, drainage ditch | 04/24/2024 | 1 (01/22/2024) | Details CEM-3701 Report | |
| 7809 | Project ID: 7809 DEA: 024F8404 EFIS: 0213000042 | 02-PLU-70-12.8/16.54 | Remove Debris, install debris racks, improve sumps to prevent culvert clogs | Near Belden at 0.8 mile west of Chip Creek Bridge to North Fork River Bridge | 01/18/2013 | 1 (10/22/2012) | Details CEM-3701 Report |
| 212160 | Project ID: 212160 DEA: 044K3804 EFIS: 0417000304 | 04-SCL-152-1.5, 1.50 | remove debris, build debris barrier | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report |
