Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5721-5730 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7498 | Project ID: 7498 DEA: 042908V4 EFIS: 0412000405 COOP: 042440A3 | 04-ALA-580-R7.8/19.1 | WIDEN FREEWAY, BRIDGES, AND HMA SURFACING. | ALAMEDA COUNTY IN LIVERMORE, DUBLIN AND PLEASANTON FROM 0.2 MILE EAST OF GREENVILLE ROAD OVERHEAD TO 0.3 MILE WEST OF HACIENDA DRIVE OVERCROSSING | 09/28/2016 | 1 (10/08/2012) | Details CEM-3701 Report |
| 7499 | Project ID: 7499 DEA: 050R3004 EFIS: 0500000355 | 05-SLO-166-39.9/40.3 | CONSTRUCT NEW BRIDGE, REMOVE EXISTING BRIDGE AND REALIGN ROADWAY | SAN LUIS OBISPO COUNTY ABOUT 25 MILES WEST OF NEW CUYAMA FROM 1.6 MILES EAST OF CUYAMA RIVER BRIDGE TO 4.0 MILES WEST OF CARRIZO CREEK BRIDGE | 08/04/2015 | 1 (11/15/2012) | Details CEM-3701 Report |
| 7500 | Project ID: 7500 DEA: 060H9404 EFIS: 0600000150 | 06-FRE-168-R14.4/R15.0 | REALIGNMENT HORIZONTAL CURVE | FRESNO COUNTY NEAR CLOVIS, FROM 0.4 MILE WEST OF SHEPHERD AVENUE TO 0.3 MILE EAST OF SHEPHERD AVENUE | 02/04/2013 | 1 (10/10/2012) | Details CEM-3701 Report |
| 7501 | Project ID: 7501 DEA: 06342564 EFIS: 0600000383 | 06-FRE-180-R62.6/66.3 | PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM | FRESNO COUNTY IN FRESNO FROM 0.3 MILE WEST OF CLOVIS AVENUE OVERCROSSING TO 0.8 MILE EAST OF TEMPERANCE AVENUE | 08/24/2018 | 1 (08/13/2012) | Details CEM-3701 Report |
| 7502 | Project ID: 7502 DEA: 06360214 EFIS: 0600020408 | 06-TUL-99-R37.3/41.3 | WIDENING FREEWAY FROM 4-LANE TO 6-LANE | TULARE COUNTY NEAR GOSHEN FROM 0.9 MILE SOUTH OF WEST VISALIA OVERHEAD TO 0.2 MILE NORTH OF NORTH GOSHEN OVERHEAD | 06/11/2018 | 1 (09/17/2012) | Details CEM-3701 Report |
| 7503 | Project ID: 7503 DEA: 080N2404 EFIS: 0800000516 | 08-SBD-10-R37.4/R38.3 | INSTALL CONCRETE BARRIER 4 FT FROM THE EDGE OF THE EXISTING SHOULDER | SAN BERNARDINO COUNTY IN YUCAIPA FROM 0.40 MILE EAST OF LIVE OAK CANYON ROAD OVERCROSSING TO 0.8 MILE WEST OF COUNTY LINE ROAD UNDERCROSSING | 03/22/2013 | 1 (10/15/2012) | Details CEM-3701 Report |
| 7504 | Project ID: 7504 DEA: 100S8604 EFIS: 1000020207 | 10-SJ-99-32.0/32.6 | HOT MIX ASPHALT OVERLAY. | SAN JOAQUIN COUNTY NEAR LODI FROM 0.4 MILE NORTH OF TURNER ROAD OVERCROSSING TO WOODBRIDGE ROAD OVERCROSSING. | 10/28/2013 | 1 (07/30/2012) | Details CEM-3701 Report |
| 7505 | Project ID: 7505 DEA: 11238604 EFIS: 1100020184 | 11-SD-5,8,15,52,94,805-Varies | REPLACE BRIDGE APPROACH SLABS, JOINT SEAL, UPGRADE MBGR. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS | 05/28/2014 | 1 (09/10/2012) | Details CEM-3701 Report |
| 7506 | Project ID: 7506 DEA: 11289604 EFIS: 1100000356 | 11-IMP-86,111-60.5,44.7 | ROCK SLOPE PROTECTION FOR SCOUR MITIGATION. | IMPERIAL COUNTY NEAR SALTON SEA BEACH AND NILAND ON ROUTE 86 AT TESLA WASH BRIDGE AND ON ROUTE 111 AT Z DRAIN BRIDGE | 06/11/2021 | 1 (07/30/2012) | Details CEM-3701 Report |
| 7509 | Project ID: 7509 EFIS: 0000001155 Permit Numbers: 0812NMC0462 | 08-RIV-215-14.2/28.5 | Enter onto Interstate 215 right-of-way between Scott Road and Nuevo Road, in the Cities of Menifee and Perris, to widen the freeway to six lanes including but not limited to new roadway pavement, planting &; irrigation & amp; hydro seed work. | Interstate 215, Perris Menifee | 06/08/2014 | 1 (06/08/2014) | Details CEM-3701 Report |
