Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5711-5720 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7488 | Project ID: 7488 DEA: 010B63U4 EFIS: 0112000213 | 01-HUM,HUM-101-22.5/23.0,88.2 | PLACE HIGH FRICTION SURFACE TREATMENT | HUMBOLDT AND DEL NORTE COUNTIES AT ROUTE 299 AND FROM 0.2 MILE SOUTH TO 0.3 MILE NORTH OF HAMILTON ROAD | 05/21/2013 | 1 (07/23/2012) | Details CEM-3701 Report |
| 7489 | Project ID: 7489 DEA: 020E4004 EFIS: 0200020142 | 02-SHA-5-62.4 | HMA, MINOR CONCRETE, COLD PLANE AC PAVEMENT, CHAIN LINK FENCE | SHASTA COUNTY NEAR DUNSMUIR AT CASTELLA VISTA POINT | 06/20/2013 | 1 (07/30/2012) | Details CEM-3701 Report |
| 7490 | Project ID: 7490 DEA: 032F2604 | 03-PLA-80-34.9 | PLACE ANCHOR MESH CABLE SYSTEM TO STABILIZE CUT SLOPE | PLACER COUNTY NEAR COLFAX AT 0.1 MILE WEST OF LONG RAVINE UNDERCROSSING | 07/23/2013 | 1 (07/23/2012) | Details CEM-3701 Report |
| 7491 | Project ID: 7491 DEA: 043A9224 EFIS: 0412000340 | 04-ALA-880-24.0/25.5 | WIDEN MAINLINE AND BRIDGE FOR HOV LANE | ALAMEDA COUNTY FROM 0.2 MILE NORTH OF ROUTE 112/880 SEPARATION TO HEGENBERGER ROAD OVERCROSSING | 01/14/2016 | 1 (10/30/2012) | Details CEM-3701 Report |
| 7492 | Project ID: 7492 DEA: 06325504 EFIS: 0600000367 | 06-KIN-198-R8.9/R10.1 | CONSTRUCT INTERCHANGE | KINGS COUNTY IN AND NEAR LEMOORE FROM 0.5 MILE WEST TO 0.7 MILE EAST OF 19TH AVENUE | 07/30/2018 | 1 (10/08/2012) | Details CEM-3701 Report |
| 7493 | Project ID: 7493 DEA: 03371504 EFIS: 0300000426 COOP: 030375 Permit Numbers: 0312NMC0111 | 03-SAC--34.7/25.9 | Construct a new interchange, including an eight lane wide overcrossing | At the location of Elverta Road and Highway 99 | 03/09/2020 | 1 (12/13/2012) | Details CEM-3701 Report |
| 7494 | Project ID: 7494 DEA: 044G3604 EFIS: 0412000438 | 04-MRN-101-5.8/6.0 | Reconstruct pavement with permeable blanket and subdrains | In Mill Valley from 0.2 mile north of 0.3 mile north of Rte 131 | 06/21/2013 | 1 (06/25/2012) | Details CEM-3701 Report |
| 7495 | Project ID: 7495 DEA: 02374304 EFIS: 0200000280 | 02-TRI-299-23.3 | WIDEN CONCRETE BRIDGE, UPGRADE BRIDGE RAIL | TRINITY COUNTY NEAR DEL LOMA AT BIG FRENCH CREEK BRIDGE | 11/17/2014 | 1 (08/13/2012) | Details CEM-3701 Report |
| 7496 | Project ID: 7496 DEA: 032F7004 | 03-YOL-80-2.5/2.9 | RECONSTRUCT EMBANKMENT & SIDEWALK, ELECTR REPAIR, & EROSION CONTROL | YOLO COUNTY IN DAVIS FROM 0.2 MILES WEST TO 0.2 MILES EAST OF MACE BOULEVARD OVERCROSSING | 10/08/2014 | 1 (07/30/2012) | Details CEM-3701 Report |
| 7497 | Project ID: 7497 DEA: 042908E4 EFIS: 0400021249 COOP: 042396A3 | 04-ALA-580-14.6/21.6 | ROADWAY WIDENING AND REHABILITATION | ALAMEDA COUNTY IN LIVERMORE, PLEASANTON, AND DUBLIN FROM 0.3 MILE EAST OF AIRWAY BOULEVARD OVERCROSSING TO 0.2 MILE WEST OF SAN RAMON/FOOTHILL ROAD OVERCROSSING | 09/28/2016 | 1 (10/08/2012) | Details CEM-3701 Report |
