Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5711-5720 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 994224 | Project ID: 994224 DEA: 033J8004 EFIS: 0323000005 | 03-BUT/BUT-162-20.74/20.74 | Remove remove existing culverts, install a new 120-ft 24" CMP, backfill, minor HMA, striping | 07/26/2023 | 1 (09/14/2022) | Details CEM-3701 Report | |
| 214873 | Project ID: 214873 DEA: 010F3104 EFIS: 0115000108 | 01-DN-101-39.8 | REMOVE REINFORCED CONCRETE BOX CULVERT AND CONSTRUCT BRIDGE. | DEL NORTE COUNTY NEAR SMITH RIVER AT DOMINIE CREEK | 10/07/2022 | 1 (06/04/2020) | Details CEM-3701 Report |
| 215221 | Project ID: 215221 DEA: 07332604 EFIS: 0716000287 | 07-LA-10-R12.4/14.9 | REMOVE RAISED ISLAND, CONSTRUCT CONCRETE BARRIER AND INSTALL LIGHTING. | THE COUNTY AND CITY OF LOS ANGELES FROM 0.1 MILE EAST OF ARLINGTON AVENUE OVERCROSSING TO 0.7 MILE EAST OF ROUTE 10/110 SEPARATION | 11/25/2024 | 1 (03/19/2021) | Details CEM-3701 Report |
| 7681 | Project ID: 7681 DEA: 04003944 EFIS: 0400000002 | 04-CC-580-6.1/6.3 | REMOVE PORTION OF EXIST BLDG, CONSTRUCT BUILDING and RET WALL. | CONTRA COSTA COUNTY IN RICHMOND AT RICHMOND-SAN RAFAEL BRIDGE MAINTENANCE STATION | 01/08/2016 | 1 (10/22/2012) | Details CEM-3701 Report |
| 7237 | Project ID: 7237 DEA: 120L2304 EFIS: 1200020337 MINOR: 12A1410 | 12-ORA-1-R0.3 | Remove Portion of Concrete Median Barrier | In Dana Point at I-5 Separation | 09/26/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 215386 | Project ID: 215386 DEA: 010E2014 EFIS: 0118000147 | 01-MEN-1-43.7 | REMOVE PORTION OF BRIDGE AND REPLACE TIMBER HARDWARE. | MENDOCINO COUNTY AT ALBION RIVER BRIDGE | 10/20/2021 | 1 (01/07/2021) | Details CEM-3701 Report |
| 994803 | Project ID: 994803 DEA: 043J0704 EFIS: 0415000077 | 04-CC-80-10.1/13.5 | Remove PCC and AC, place PCP and AC Resurfacing. | Construction on State Highway in Contra Costa County in Hercules and Crockett from Route 80/4 separation to 0.1 mile west of Crockett Viaduct. | 10/06/2025 | 1 (05/10/2023) | Details CEM-3701 Report |
| 2675 | Project ID: 2675 DEA: 050M7204 | 05-SB-101-76.1/76.7,90.7/93.6 | REMOVE PAVERS AND CONSTRUCT WATER BARRIER | CASTILLO STREET UNDER-CROSSING | 08/10/2010 | 1 (08/10/2010) | Details CEM-3701 Report |
| 210553 | Project ID: 210553 DEA: 112E0074 MINOR: 11A2280 | 11-SD-56-3.5 | Remove nonnative weeds, install irrigation, install native plants, and perform one (1) year of plant establishment. | In San Diego County in San Diego south of State Route 56 east of Carmel Valley Road | 1 (05/27/2015) | Details CEM-3701 Report | |
| 212214 | Project ID: 212214 DEA: 033H0004 EFIS: 0317000216 | 03-BUT-70-35.7/48.0 | remove multiple slides, repair roadway, replace damaged MBGR | 08/06/2019 | 1 (09/18/2017) | Details CEM-3701 Report |
