Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5701-5710 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1001562 | Project ID: 1001562 DEA: 010H5704 EFIS: 0117000237 | 01-MEN-101-20.9/28.6 | PLACE ASPHALT, VEGETATION CONTROL & INSTALL HIGH TENSION CABLE BARRIER | MENDOCINO COUNTY IN AND NEAR UKIAH FROM NORTH OF ROBINSON CREEK BRIDGE TO POMO LANE UNDERCROSSING | 1 (09/02/2025) | Details CEM-3701 Report | |
| 359 | Project ID: 359 DEA: 01499904 EFIS: 0100020107 | 01-MEN-101-19.7/30.8 | INSTALL MEDIAN CABLE BARRIER AND VEGETATION CONTROL (MINOR CONCRETE). | MENDOCINO COUNTY IN AND NEAR UKIAH FROM EL ROBLE ROAD OVERCROSSING TO ROUTE 101/20 SEPARATION | 01/31/2012 | 1 (02/21/2012) | Details CEM-3701 Report |
| 208905 | Project ID: 208905 DEA: 010C3604 EFIS: 0112000254 | 01-MEN-101-R21.4/R26.1 | INSTALL HIGH FRICTION SURFACE TREATMENT | MENDOCINO COUNTY IN AND NEAR UKIAH AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF ROUTE 253 TO NORTH STATE STREET UNDERCROSSING | 01/30/2015 | 1 (06/26/2013) | Details CEM-3701 Report |
| 7543 | Project ID: 7543 DEA: 01465804 EFIS: 0100000674 | 01-MEN-1-14.9/21.7 | PLACE HMA (TYPE A). | MENDOCINO COUNTY IN AND NEAR POINT ARENA AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF MILL STREET TO 0.3 MILE NORTH OF KINNEY ROAD | 06/18/2013 | 1 (08/20/2012) | Details CEM-3701 Report |
| 352 | Project ID: 352 DEA: 01498504 | 01-MEN-128-17.9/23.3 | RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | MENDOCINO COUNTY IN AND NEAR PHILO FROM MILL CREEK BRIDGE TO INDIAN CREEK BRIDGE | 12/10/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 210444 | Project ID: 210444 DEA: 010E5904 | 01-MEN-20-R0.0/7.1 | HMA OVERLAY | MENDOCINO COUNTY IN AND NEAR FORT BRAGG FROM ROUTE 1 TO 1.0 MILE WEST OF LITTLE LAKE ROAD | 06/29/2018 | 1 (09/23/2015) | Details CEM-3701 Report |
| 209526 | Project ID: 209526 DEA: 010C9504 EFIS: 0113000081 | 01-MEN-101-R100.1/R103.8 | BONDED WEARING COURSE | MENDOCINO COUNTY FROM 1.8 MILES SOUTH OF REYNOLDS SEPARATION TO PIERCY SEPARATION | 02/06/2015 | 1 (05/21/2014) | Details CEM-3701 Report |
| 994725 | Project ID: 994725 DEA: 010M1104 EFIS: 0122000095 | 01-MEN-20-34.4/R38.5 | REPLACE ASPHALT CONCRETE SURFACING, GEOSYNTHETIC PAVEMENT INTERLAYER. | MENDOCINO COUNTY FROM 1.2 MILES EAST OF THE ROUTE 20/101 SEPARATION TO 0.2 MILE EAST OF COLD CREEK BRIDGE #2 | 11/20/2023 | 1 (04/25/2023) | Details CEM-3701 Report |
| 993280 | Project ID: 993280 DEA: 010J4804 EFIS: 0119000044 | 01-MEN-271-2.9/18.3 | REPLACE CULVERTS. | MENDOCINO COUNTY AT VARIOUS LOCATIONS ON ROUTE 271 FROM 2.9 MILES NORTH OF CUMMINGS/101 SEPARATION TO 1.2 MILES SOUTH OF THE PIERCY/101 SEPARATION | 10/20/2022 | 1 (10/04/2021) | Details CEM-3701 Report |
| 993731 | Project ID: 993731 DEA: 010K8604 EFIS: 0121000018 | 01-MEN-20-4.5/6.9 | REPLACE CULVERTS AND PLACE CSP. | MENDOCINO COUNTY AT VARIOUS LOCATIONS ON ROUTE 20 FROM 2.3 MILES EAST OF GRAVEL PIT ROAD (ROAD 415-C) TO 1.6 MILES WEST OF LITTLE LAKE ROAD (ROAD 408) | 11/21/2022 | 1 (04/19/2022) | Details CEM-3701 Report |
