Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5671-5680 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6024 | Project ID: 6024 DEA: 11167894 EFIS: 1100000084 | 11-IMP-78,86-R14.6/R19.5,38.3/39.1 | CONSTRUCTION OF A NEW 4-LANE WITH HMA AND CRCP. | IMPERIAL COUNTY NEAR BRAWLEY ON ROUTE 78 FROM ROUTE 86 TO 0.6 KM EAST OF HOVLEY ROAD AND ON ROUTE 86 FROM 0.5 KM SOUTH TO 0.1 KM NORTH OF FREDRICKS ROAD | 01/04/2013 | 1 (02/22/2012) | Details CEM-3701 Report |
| 1001737 | Project ID: 1001737 DEA: 040A53A4 EFIS: 0424000468 COOP: 043071 | 04-SOL-SR12,I80-1.917/10.932/2.562/11.825 | Construction of a new partial interchange on SR12 (West) at Red Top Road, reconstruction of the I-80/Red Top Road Interchange, a new connector from the new partial interchange on SR 12 to Red Top Road at I-80, etc | Red Top Road in Solano County near Fairfield. | 2 (12/04/2025) | Details CEM-3701 Report | |
| 994271 | Project ID: 994271 DEA: 044W1404 EFIS: 0422000117 COOP: 042868 | 04--- | Construction of a new retaining wall, proposed by PERMITTEE Oakland along SR 24 within Caltrans right of way | 2 (12/24/2024) | Details CEM-3701 Report | ||
| 993477 | Project ID: 993477 DEA: 043W6804 EFIS: 0422000015 COOP: 042854 | 04-CC-580- | Construction of a new waterline within the limits of and supported by the Richmond-San Rafael Bridge . | Connect East Bay Municipal Utility District (EBMUD) portable water system located in the City of Richmond California by that of Marin Water system in the City of San Rafael California. | 1 (01/03/2022) | Details CEM-3701 Report | |
| 993461 | Project ID: 993461 DEA: 044W0004 EFIS: 0422000015 COOP: 042855 | 04-CC-580-5.8 | Construction of a new waterline within the limits of and supported by the Scofield Ave Bridge | The PROJECT is part of the construction of an inter-tie portable water link (waterline) to connect East Bay Municipal Utility District (EBMUD) portable water system located in the City of Richmond California by that of Marin Water system in the City of San Rafael California | 1 (12/13/2021) | Details CEM-3701 Report | |
| 1001606 | Project ID: 1001606 DEA: 061J1904 EFIS: 0625000199 COOP: 1829 | 06-KER-166-24.38/24.55 | Construction of a roundabout at the intersection of Stevens Dr and SR 166 | Mettler, Kern County | 2 (09/12/2025) | Details CEM-3701 Report | |
| 213068 | Project ID: 213068 Permit Numbers: 0617NSN0224 06186DP0046 0617NRT1081 06186DP0887 0618NRT0392 0618NRT0689 0618NRW0806 0618NRW0903 0618NRT0922 0618NRW1001 | 06---10.821 | Construction of a traffic signal by City of Madera's contractor including 4 signal poles, pedestrian signal poles, traffic loops, curb returns with ADA ramps, modifications to existing raised median, signage, striping & various traffic signal appurtances as shown on the attached plans as mod | SR145 @Elm Av, Madera | 11/30/00-1 | 1 (01/24/2018) | Details CEM-3701 Report |
| 211177 | Project ID: 211177 Permit Numbers: 04156DP2439 0414NSN1508 | 04-SCL-680-1.2/1.2 | Construction of a traffic signal for the southbound on-ramp to Route to Route 680 from Jackson Ave, including curb return modifications,striping and signing. | Jackson Ave, San Jose | 01/18/2019 | 1 (02/02/2016) | Details CEM-3701 Report |
| 211022 | Project ID: 211022 DEA: 100T8104 | 10-MER-59,99,140,152-Varies | CONSTRUCTION OF ADA CURB RAMPS. | IN MERCED COUNTY ON STATE ROUTES 59, 99, 140 AND 152 AT VARIOUS | 11/07/2016 | 1 (02/17/2016) | Details CEM-3701 Report |
| 215678 | Project ID: 215678 Permit Numbers: 0418NMC2215 0420NRT2773 04216DP0668 | 04-SM-82,280-23.5-23.7/M27.16R,R25.98 | Construction of approximately 1,050 liner feet of new sidewalk, and curb and gutter, along the west side of El Camino Real from San Pedro road to A Street where there is currently no sidewalk. | San Pedro Rd. to A St., San Mateo County & Daly City | 03/13/2023 | 1 (04/14/2021) | Details CEM-3701 Report |
