Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5661-5670 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7417 | Project ID: 7417 DEA: 11298004 EFIS: 1100000415 | 11-SD-94-13.8/14.4 | INSTALL MEDIAN CONCRETE BARRIER AND APPLY SLURRY SEAL. | SAN DIEGO COUNTY NEAR LEMON GROVE FROM VIA MERCADO TO 0.1 MILE EAST OF JAMACHA BOULEVARD | 03/22/2013 | 1 (08/07/2012) | Details CEM-3701 Report |
| 7420 | Project ID: 7420 DEA: 050T0604 EFIS: 0500000475 MINOR: 05A1521 | 05-SLO-1-26.14 | 12/23/2024 | 1 (11/11/2019) | Details CEM-3701 Report | ||
| 7421 | Project ID: 7421 DEA: 050T0604 EFIS: 0500000475 | 05--- | 1 (05/08/2012) | Details CEM-3701 Report | |||
| 7426 | Project ID: 7426 DEA: 051C5604 EFIS: 0512000176 | 05-SB-101-47.4 | Repiar Failed Culvert | 10 miles south of Buellton to 0.2 mile north of Gaviota Tunnel | 01/17/2014 | 1 (05/11/2012) | Details CEM-3701 Report |
| 7427 | Project ID: 7427 DEA: 07215934 EFIS: 0700001833 | 07-LA-5-2.4/4.0 | Widen and Realign Freeway and Construct Ped OC, OC and UC Structures. | LOS ANGELES COUNTY IN SANTA FE SPRINGS AND NORWALK FROM 0.1 MILE NORTH OF CARMENITA ROAD OVERCROSSING TO 0.1 MILE NORTH OF SILVERBOW AVENUE PEDESTRIAN OVERCROSSING | 02/20/2020 | 1 (11/26/2012) | Details CEM-3701 Report |
| 7428 | Project ID: 7428 DEA: 07215944 EFIS: 0700001834 | 07-LA-5-4.0/5.9 | RECONSTRUCT AND WIDEN FREEWAY AND UNDERCROSSING STRUCTURES. | LOS ANGELES COUNTY IN NORWALK FROM 0.4 MILE SOUTH OF SAN ANTONIO DRIVE UNDERCROSSING TO 0.7 MILE NORTH OF PIONEER BOULEVARD UNDERCROSSING | 07/02/2021 | 1 (11/07/2012) | Details CEM-3701 Report |
| 7429 | Project ID: 7429 DEA: 112T0984 EFIS: 1100020263 | 11-SD-15-M14.5/M16.4 | INSTALL HIGHWAY PLANTING AND IRRIGATION SYSTEMS. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 MILE NORTH OF POMERADO ROAD OVERCROSSING TO 0.5 MILE NORTH OF MIRA MESA BOULEVARD UNDERCROSSING | 09/27/2016 | 1 (07/02/2012) | Details CEM-3701 Report |
| 213452 | Project ID: 213452 DEA: 034H5004 | 03-ED-50-33.9, 33.9 | Install RSP and replace damaged MBGR | 05/14/2020 | 1 (01/08/2019) | Details CEM-3701 Report | |
| 7431 | Project ID: 7431 DEA: 042G5204 EFIS: 0412000489 | 04-SOL-80-30.6/38.7 | Replace PCC slabs | Near Vacaville and in Dixon from 0.6 mile east of Leisure Town Rd to 1.0 mile west of Pedrick Rd. | 06/08/2020 | 1 (05/15/2012) | Details CEM-3701 Report |
| 7432 | Project ID: 7432 DEA: 041A9024 EFIS: 0412000107 | 04-SF-1-6.0 | Stabilize embankment with stone columns and construct drainage | At Presidio National Park at Mountain Lake | 08/22/2018 | 1 (05/15/2012) | Details CEM-3701 Report |
