Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5661-5670 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 993776 | Project ID: 993776 DEA: 040J3004 EFIS: 0413000433 | 04-SON-1-26.7/27.1 | CONSTRUCTING RETAINING WALL AND CONFINEMENT SYSTEM TO RESTORE SLIPOUT. | SONOMA COUNTY NEAR JENNER FROM 0.3 MILE TO 0.7 MILE NORTH OF MEYERS GRADE ROAD | 1 (05/11/2022) | Details CEM-3701 Report | |
| 213379 | Project ID: 213379 Permit Numbers: 0716NMC1138 07186DP0879 0717NRW2198 | 07---2.3/3.3 | constructing the Westlake Boulevard Sidewalk Project (CI 5337) sponsored by the City which consists of sidewalk, retaining walls, curb ramps, a bus turn-out; installing a bus stop facility (shelter, bench, and trash receptacle), landscaping, irrigation, roadside signs, and other associated work; pl | SR-23 (Westlake Blvd.), Thousand Oaks | 06/17/2021 | 1 (06/04/2018) | Details CEM-3701 Report |
| 2525 | Project ID: 2525 EFIS: 0000001155 Permit Numbers: 05096TK0361 05096DP0438 | 05-MON-183-R7.63/R7.63 | construction area signage for local road work | 05/04/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 214890 | Project ID: 214890 DEA: 080A4414 EFIS: 0818000047 COOP: 081894 | 08-RIV-I-15-17.6/19.6 | Construction consists of additional of two new lanes on Railroad Canyon Road through interchange, reconstruction of the northbound diamond ramps to hook ramps to connect to Grape Street , construction of auxiliary and deceleration lanes on I-15 | Located at City of Lake Elsinore , 1.6 Mile South to 0.4 Mile North of Railroad Canyon Road undercrossing in Riverside County, CA. | 2 (03/26/2020) | Details CEM-3701 Report | |
| 994982 | Project ID: 994982 DEA: 09363604 EFIS: 0914000029 | 09-INY-395-22.8/22.3 | Construction hot mix asphalt shoulder | State Highway In Inyo County About 14 Miles South of Olancha from 1.4 Miles South to 1.6 Miles South of Haiwee Powerhouse Road. | 1 (08/10/2023) | Details CEM-3701 Report | |
| 210720 | Project ID: 210720 DEA: 051E0604 EFIS: 0513000030 | 05-MON-101-47.7/53.9 | CONSTRUCTION MEDIAN BARRIER, WIDEN SHOULDER AND RUMBLE STRIPS | MONTEREY COUNTY IN AND NEAR GREENFIELD FROM TEAGUE AVENUE TO WALNUT AVE OVERCROSSING | 08/01/2018 | 1 (10/23/2015) | Details CEM-3701 Report |
| 995169 | Project ID: 995169 DEA: 081K4024 EFIS: 0820000074 COOP: 081701 | 08-RIV-I-15-3.9 | Construction of 12 ft wide aux lane with 10 ft right shoulder on northbound I-15. Embankment excavation and construction of retaining wall in front of Santiago Road overcrossing abutment. | NB I-15 between Temecula Parkway and Rancho California Road | 2 (09/21/2023) | Details CEM-3701 Report | |
| 1001241 | Project ID: 1001241 Permit Numbers: 1124NMC0657 | 11--N,A- | Construction of 3.5-mile on-street bikeway. Includes installation of pedestrian push button poles and electrical poles. | Imperial Avenue from 17th Street to 47th Street in San Diego. Will intersect state highways at 3 locations. | 2 (02/26/2025) | Details CEM-3701 Report | |
| 2513 | Project ID: 2513 EFIS: 0000001155 Permit Numbers: 0508NMC0168 | 05-SCR-1-17.42 | Construction of a 11.5′ wide bike path, 133′ long retaining wall,, 292′ long cut-off wall, a 54′ long, 10′ wide prefabricated bicycle-pedestrian bridge under San Lorenzo Bridge on Highway 1. | 04/29/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 1524 | Project ID: 1524 EFIS: 0000001155 Permit Numbers: 0407NDP0615 | 04-SCL-152,156-21.7/R22.7 | CONSTRUCTION OF A DIRECT CONNECTOR FLYOVER AND AN INTERCHANGE | 05/04/2011 | NOT VERIFIED | Details CEM-3701 Report |
