Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5601-5610 of 19037 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7270 | Project ID: 7270 DEA: 042L3104 EFIS: 0400000868 MINOR: 04A3730 | 04-SF-1-5.8/6.3 | In City of SF on Southbound Route 1 between 0.1 Mile from General Douglas McArthur tunnel (Presidio Tunnel) to Lake Street. | 02/12/2025 | 1 (03/19/2012) | Details CEM-3701 Report | |
| 7271 | Project ID: 7271 EFIS: 0000001155 Permit Numbers: 0711NMC0481 | 07-VEN-232-0.79/0.97 | Install curb gutter & sidewalk along Vineyard Ave., modify signals at Stoube Street. | Stroube to Collins, Oxnard | 07/31/2018 | 1 (12/13/2012) | Details CEM-3701 Report |
| 7272 | Project ID: 7272 EFIS: 0000001155 Permit Numbers: 08126RW0102 | 08-RIV-111-52.88/53.38 | Enter onto Vista Chino Parkway (SR-111) right of way at Cerritos Road in the City of Palm Springs to install new traffic signal and related signing and striping as per plans date stamped May 11,2011, Special Provisions and Water Pollution Control Program | Vista Chino, Palm Springs | 02/23/2012 | 1 (02/23/2012) | Details CEM-3701 Report |
| 7273 | Project ID: 7273 EFIS: 0000001155 Permit Numbers: 08126RT0181 | 08-RIV-79-18.47/18.472 | Enter onto State Route 79 right-of-way at Stetson Avenue, in Winchester area, Riverside County, to perform roadway improvements including pavement widening, AC overlay, sidewalk, curb gutter, street lights, pedestrian access ramps, traffic signal. | State Route 79 (Winchester Road), Winchester | 01/07/2007 | 1 (01/07/2007) | Details CEM-3701 Report |
| 7276 | Project ID: 7276 DEA: 08468104 EFIS: 0800000745 | 08-SBD-10-14.8/15.5 | Route 10 Citrus Avenue Interchange Reconstruction, Replace existing interchange at Citrus Avenue. | In Fontana, on Route 10 at Citrus Avenue interchange | 08/19/2021 | 1 (09/10/2012) | Details CEM-3701 Report |
| 7277 | Project ID: 7277 DEA: 010A3904 EFIS: 0100020279 | 01-DN,HUM-101,199-VAR | REHABILITATE BRIDGE | DEL NORTE AND HUMBOLDT COUNTIES AT VARIOUS LOCATIONS | 03/12/2013 | 1 (07/11/2012) | Details CEM-3701 Report |
| 7278 | Project ID: 7278 DEA: 010A7304 EFIS: 0100020334 | 01-MEN-20-7.0/17.3 | HMA OVERLAY | MENDOCINO COUNTY NEAR FORT BRAGG FROM 10.3 MILES WEST OF CHAMBERLAIN CREEK BRIDGE TO CHAMBERLAIN CREEK BRIDGE | 07/03/2013 | 1 (05/07/2012) | Details CEM-3701 Report |
| 7279 | Project ID: 7279 DEA: 023C3004 EFIS: 0200000317 | 02-PLU-70-0.6/35.2 | CONSTRUCT METAL BEAM GUARDRAIL, CONCRETE BARRIER AND RETAINING WALLS. | PLUMAS COUNTY AT VARIOUS LOCATIONS FROM GRIZZLY CREEK BRIDGE TO 0.1 MILE WEST OF SPANISH CREEK BRIDGE | 12/05/2014 | 1 (08/01/2012) | Details CEM-3701 Report |
| 7280 | Project ID: 7280 DEA: 025E2104 EFIS: 0212000094 | 02-PLU-36-6.5/9.2 | COLD IN-PLACE RECYCLE WITH HMA OVERLAY | PLUMAS COUNTY AT CHESTER FROM 0.2 MILE EAST OF ROUTE 89 TO MELISSA AVENUE | 07/22/2013 | 1 (10/11/2012) | Details CEM-3701 Report |
| 7281 | Project ID: 7281 DEA: 031E0004 EFIS: 0300020255 | 03-PLA-89-13.7/21.7 | AC PAVEMENT COLD FOAM IN-PLACE RECYCLING AND HMA OVERLAY. | PLACER COUNTY NEAR TRUCKEE FROM SQUAW VALLEY ROAD TO THE NEVADA COUNTY LINE | 01/23/2013 | 1 (06/19/2012) | Details CEM-3701 Report |
