Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 551-560 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 215555 | Project ID: 215555 DEA: 061A9804 EFIS: 0620000145 | 06-TUL-65,190,198,245-Var | COLD PLANE AND REPLACE WITH HMA AND RESURFACE WITH CHIP SEAL. | TULARE COUNTY AT VARIOUS LOCATIONS | 08/07/2023 | 1 (03/10/2021) | Details CEM-3701 Report |
| 1000993 | Project ID: 1000993 DEA: 061F9004 EFIS: 0623000108 | 06-TUL-137,198-Var | Tulare County HMA Improvements - HMA (TYPE A) AND RHMA (GAP GRADED). | TULARE COUNTY AT VARIOUS LOCATIONS | 1 (03/04/2025) | Details CEM-3701 Report | |
| 1000887 | Project ID: 1000887 DEA: 061G8404 EFIS: 0624000170 | 06-TUL-99-13.5/19.5 | COLD PLANE AC PAVEMENT AND HMA. | TULARE COUNTY AT TIPTON FROM 0.1 MILE NORTH OF ROAD 124 ON RAMP TO AVENUE 152 OVERCROSSING | 1 (01/22/2025) | Details CEM-3701 Report | |
| 209146 | Project ID: 209146 DEA: 06471504 EFIS: 0600000464 COOP: 061549 | 06-TUL-99-39.6/41.3 | RECONSTRUCT INTERCHANGE WITH NEW PUMPING PLANT. | TULARE COUNTY AT GOSHEN FROM 0.9 MILE NORTH OF ROUTE 99/198 WEST SEPARATION TO 0.2 MILE NORTH OF NORTH GOSHEN OVERHEAD | 03/03/2020 | 1 (10/08/2013) | Details CEM-3701 Report |
| 1000999 | Project ID: 1000999 DEA: 061G8104 EFIS: 0624000168 | 06-TUL-63-R19.2/R24.3 | HMA (TYPE A), RHMA-G, AND COLD PLANE AC PAVEMENT. | TULARE COUNTY AT AND NEAR CUTLER AND OROSI FROM AVENUE 384 TO AVENUE 422 | 12/02/2025 | 1 (03/04/2025) | Details CEM-3701 Report |
| 1000649 | Project ID: 1000649 DEA: 061H3404 EFIS: 0625000042 | 06-TUL-99-23.49 | BRIDGE REPAIR FOR BR #46 0192 | Tulare County along NB SR 99 at Avenue 184 OC, Bridge #46 0192. | 05/09/2025 | 1 (09/26/2024) | Details CEM-3701 Report |
| 209069 | Project ID: 209069 DEA: 060N3904 EFIS: 0600020698 | 06-TUL-245-20.8 | CONSTRUCT ROCK SLOPE PROTECTION. | TULARE COUNTY ABOUT 10 MILES SOUTH OF BADGER AT COTTONWOOD CREEK BRIDGE | 08/06/2015 | 1 (10/15/2014) | Details CEM-3701 Report |
| 993284 | Project ID: 993284 DEA: 060U7704 EFIS: 0616000035 | 06-TUL-99-22.3 | INSTALL WATER/WASTEWATER SYSTEMS AND LANDSCAPE WORK. | TULARE COUNTY 3 MILES NORTH OF TIPTON AT THE PHILIP S RAINE SAFETY ROADSIDE REST AREA | 05/09/2025 | 1 (10/04/2021) | Details CEM-3701 Report |
| 213669 | Project ID: 213669 DEA: 06324524 EFIS: 0617000065 MINOR: 06A2459 | 06-TUL-52.5- | KINGS RIVER MITIGATION PLANT ESTABLISHMENT | Tulare County | 11/29/2022 | 1 (01/31/2020) | Details CEM-3701 Report |
| 8142 | Project ID: 8142 DEA: 060M8004 EFIS: 0600020012 | 06-MAD,MAD-65,99-25.2/25.6,23.3/23.8 | CONSTRUCT THRIE BEAM AND CONCRETE MEDIAN BARRIER | TULARE AND MADERA COUNTIES ON ROUTE 65 FROM 0.1 MILES NORTH OF AVENUE 196 TO 0.1 MILES SOUTH OF AVENUE 200 AND ON ROUTE 99 FROM 0.2 MILES NORTH OF CALIFA UNDERPASS TO AVENUE 24 OVERCROSSING | 05/28/2013 | 1 (12/10/2012) | Details CEM-3701 Report |
