Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5491-5500 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214482 | Project ID: 214482 DEA: 10403503 EFIS: 1000000424 COOP: 104075 | 10-STA-132-R11.3/R14.7 | SR 132 West, Freeway / Expressway Phase 1; The Project consists of 4 bridges and 5 retaining walls. Two of the retaining walls include sound walls as part of the development system. This project also includes roadway improvements, landscaping and utiliti. | freeway/express way at a new alignment along the adopted State Route 132 route south of Kansas Avenue from Dakota Avenue to east of SR 99 at the Needham Street Bridge Overcrossing | 03/04/2022 | 2 (10/14/2019) | Details CEM-3701 Report |
| 214481 | Project ID: 214481 DEA: 073118U4 EFIS: 0719000209 | 07-LA-107-0.0/4.8 | PLACE RHMA AND JPCP, AND MODIFY ELECTRICAL SYSTEM. | LOS ANGELES COUNTY IN TORRANCE FROM ROUTE 1 TO REDONDO BEACH BOULEVARD | 11/03/2021 | 1 (02/28/2020) | Details CEM-3701 Report |
| 214480 | Project ID: 214480 DEA: 07306604 EFIS: 0714000178 | 07-LA-213-0.0/8.0 | CONSTRUCT CURB RAMPS,INSTALL PEDESTRIAN SIGNALS & REPAINT CROSSWALKS. | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM WEST 25TH STREET TO WEST CARSON STREET | 10/21/2022 | 1 (08/18/2020) | Details CEM-3701 Report |
| 214479 | Project ID: 214479 DEA: 041J9904 EFIS: 0414000411 | 04-ALA,CC-13,24-5.2/5.5 | ALA 13/CC 24 ENHANCE LIGHTING | ALAMEDA AND CONTRA COSTA COUNTIES AT VARIOUS LOCATIONS | 12/21/2021 | 1 (10/21/2019) | Details CEM-3701 Report |
| 214478 | Project ID: 214478 DEA: 034H6604 EFIS: 0319000019 | 03-PLA-80-32.7/33.0 | WIDEN PAVEMENT WITH AB AND HMA, AND MODIFY ELECTRICAL. | PLACER COUNTY IN COLFAX FROM THE SOUTH AUBURN ROAD WESTBOUND ONRAMP TO 0.3 MILE SOUTH OF THE SOUTH AUBURN ROAD WESTBOUND ONRAMP | 12/04/2020 | 1 (10/23/2019) | Details CEM-3701 Report |
| 214477 | Project ID: 214477 DEA: 042Q1304 EFIS: 0418000403 MINOR: 04A5693 | 04-SCL-101-36.67 | Replace Pump Control | In Santa Clara County in San Jose at the East San Jose Pump Plant | 03/18/2025 | 1 (10/23/2019) | Details CEM-3701 Report |
| 214476 | Project ID: 214476 Permit Numbers: 05196UT0447 | 05---3.035/-1 | Install new 6-inch PVC sewer lateral to existing commercial building at 33 E. Lake Avenue; remove old 4-inch sewer line. | 33 E. Lake St, Watsonville | 08/23/2021 | 1 (10/15/2019) | Details CEM-3701 Report |
| 214475 | Project ID: 214475 DEA: 051J2204 EFIS: 0517000073 MINOR: 05A2161 | 05-SCR-183.1-Var | Replace Traffic Signal Heads. CONSTRUCTION ON STATE HIGHWAY IN MONTEREY AND SANTA CRUZ COUNTY AT VARIOUS LOCATIONS | District-County-Route-Post Mile: 05-Mon,SCr-183,1-Various | 1 (10/22/2019) | Details CEM-3701 Report | |
| 214474 | Project ID: 214474 DEA: 074P4304 EFIS: 0717000232 | 07--- | COLD PLANE AND OVERLAY | 1 (07/12/2021) | Details CEM-3701 Report | ||
| 214473 | Project ID: 214473 DEA: 030F2834 EFIS: 0319000203 | 03-SAC-99-8.81 | Fabricate precast girders for McConnell OH (UPRR) | Elk Grove, CA | 11/05/2020 | 1 (02/13/2020) | Details CEM-3701 Report |
