Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 541-550 of 17395 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
6959Project ID: 6959
DEA: 04297614
EFIS: 0400020580
04-ALA-84-25.5/27.1WIDEN EXIST HWY AND BR; CONSTRUCT AN ACCESS BR AND RETAINING WALLS.ALAMEDA COUNTY IN AND NEAR LIVERMORE FROM 0.4 MILE NORTH OF CONCANNON BOULEVARD TO JACK LONDON BOULEVARD01/14/20161 (05/01/2012)Details CEM-3701 Report
4819Project ID: 4819
DEA: 080C0804
08-SBd-60-R3.4/R3.6WIDEN EXISITING RAMP AND INSTALL SIGNAL LIGHTS 07/28/20101 (07/28/2010)Details CEM-3701 Report
2031Project ID: 2031
DEA: 042332U4
COOP: 1980A4
04-ALA-880-RWIDEN EXISITING FREEWAYIN SANTA CLARA AND ALAMEDA COUNTIES IN MILPITAS AND FREMONT AT VARIOUSLOCATIONS04/20/20111 (04/20/2011)Details CEM-3701 Report
213358Project ID: 213358
DEA: 024F5104
EFIS: 0213000001
02-SHA-5-0.0/67.0WIDEN EMBANKMENT FOR CRZ, INSTALL MGS, EXTEND EXISTING CULVERTSSHASTA COUNTY IN AND NEAR REDDING AT VARIOUS LOCATIONS FROM TEHAMA COUNTY LINE TO SISKIYOU COUNTY LINE09/15/20211 (06/22/2018)Details CEM-3701 Report
214114Project ID: 214114
DEA: 040A5394
EFIS: 0418000244
04-SOL-80,12-11.4/12.8, 2.1/2.8Widen EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc.I-80/I-680/Route 12 Interchange02/24/20231 (04/23/2019)Details CEM-3701 Report
1438Project ID: 1438
EFIS: 0000001155
Permit Numbers: 04066DP0010
04-SOL-80-12.74WIDEN EB RAMPS,NEW SIGNAL AT 80 AND LOPES RD IN CITYOF FAIRFIELD 03/01/2012NOT VERIFIEDDetails CEM-3701 Report
214340Project ID: 214340
DEA: 081G2914
EFIS: 0818000114
08-SBD-10-27.9WIDEN EB OFF RAMPSAN BERNARDINO COUNTY IN REDLANDS AT CALIFORNIA STREET EASTBOUND EXIT RAMP11/01/20211 (07/16/2020)Details CEM-3701 Report
215819Project ID: 215819
DEA: 060W1904
EFIS: 0617000115
COOP: 061663
06-MAD-145-24.5/25.459Widen eastbound State Route 145 from the intersection at State Route 41 to 1.2 miles west of State Route 41. The widening will include a turn pocket and an acceleration lane at the intersection with the proposed access road to Vulcan Materials.State Route 145 from the intersection at State Route 41 to 1.2 miles west of State Route 41.08/16/20222 (06/23/2021)Details CEM-3701 Report
210862Project ID: 210862
DEA: 031F4004
EFIS: 0300020420
03-PLA-80-35.1/38.3WIDEN EASTBOUND ROADWAYWIDEN EASTBOUND ROADWAY06/19/20201 (10/20/2015)Details CEM-3701 Report
3412Project ID: 3412
DEA: 06388804
06-KER-178-R4.5WIDEN EASTBOUND OFF RAMPIN KERN COUNTY IN BAKERSFIELD ATMOUNT VERNON OVERCROSSING04/21/2011NOT VERIFIEDDetails CEM-3701 Report