Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5461-5470 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 5563 | Project ID: 5563 DEA: 100G2004 | 10-STA-4-R1.7 | CONSTRUCT ROCK SLOPE PROTECTION | STA county | 04/17/2011 | 1 (12/07/2009) | Details CEM-3701 Report |
| 5564 | Project ID: 5564 DEA: 100G3204 | 10-SJ-88-4.3/0.0 | REALIGN OFFSET INTERSECTION, WIDEN SR-88 FOR LEFT-TURN CHANNELIZATION. | 07/28/2011 | 1 (07/28/2011) | Details CEM-3701 Report | |
| 5565 | Project ID: 5565 DEA: 100G4704 EFIS: 1000000046 COOP: 10366A | 10-SJ-5-25.0/32.7 | WIDEN BRIDGES AND FREEWAY WITH HMA & PCCP, AND CONSTRUCT SOUND WALLS. | SAN JOAQUIN COUNTY IN STOCKTON FROM 0.4 MILE NORTH OF 8TH STREET UNDERCROSSING TO HAMMER LANE UNDERCROSSING | 04/11/2017 | 1 (09/13/2013) | Details CEM-3701 Report |
| 5566 | Project ID: 5566 DEA: 100G7504 | 10-TUO-120-R3.5/8.0 | RUBBERIZED HOT MIX ASPHALT W/ OVERLAY | Tuolumne County near Yosemite junction from 2.1 miles east of Tulluch Road to 0.2 mile west of La Grange Road. | 11/23/2009 | 1 (12/07/2009) | Details CEM-3701 Report |
| 5567 | Project ID: 5567 DEA: 100G7604 | 10-SJ-88-12.6/16.4 | OVERLAY EXISTING PAVEMENT W/ RUBBERIED HOT MIX | San Joaquin County at or near Lockeford from 0.2 mile North of West junction Route 12 to 0.1 mile East of Disch Road. | 11/23/2009 | 1 (12/07/2009) | Details CEM-3701 Report |
| 5568 | Project ID: 5568 DEA: 100G7704 | 10-STA-33-.5/1.5,12.5/14.5 | ROADWAY REHAB | 04/08/2011 | 1 (09/16/2009) | Details CEM-3701 Report | |
| 5569 | Project ID: 5569 DEA: 100H0304 | 10-STA-108-50.8 | IMPROVE INTERSECTION,INSTALL SIGNAL AND MODIFY CURB RAMP | 04/08/2011 | 1 (10/22/2007) | Details CEM-3701 Report | |
| 5570 | Project ID: 5570 DEA: 100H04U4 | 10-SJ-4-005.4/008.2 | Realignment To Correct Curve And Improve Intersection. | 01/04/2013 | 1 (07/21/2009) | Details CEM-3701 Report | |
| 5571 | Project ID: 5571 DEA: 100H3204 | 10-TUO-108-9.2/9.9 | WIDEN HIGHWAY WITH HOT MIX ASPHALT ON AB | 04/08/2011 | 1 (12/03/2009) | Details CEM-3701 Report | |
| 5572 | Project ID: 5572 DEA: 100H3604 COOP: 101502 | 10-MER-33-17.1 | RECONSTRUCT CURB AND SIDEWALK | IN MERCED COUNTY IN SANTA NELLA ATPLAZA DRIVE | 04/08/2011 | 1 (02/16/2007) | Details CEM-3701 Report |
