Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5451-5460 of 19348 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212343 | Project ID: 212343 DEA: 09346704 | 09-MNO-395-58.2 | CONSTRUCT RIGHT TURN LANE. | MONO COUNTY ABOUT 6 MILES NORTH OF LEE VINING AT ROUTE 167 | 10/09/2018 | 1 (03/27/2018) | Details CEM-3701 Report |
| 993610 | Project ID: 993610 DEA: 09389004 EFIS: 0921000039 | 09-MNO-182-R6.4/12.6 | COLD PLANE AC PAVEMENT AND PLACE HMA (TYPE A). | MONO COUNTY ABOUT 6 MILES EAST OF BRIDGEPORT FROM 0.2 MILE NORTH OF EAST WALKER RIVER BRIDGE TO THE NEVADA STATE LINE | 11/01/2022 | 1 (12/20/2023) | Details CEM-3701 Report |
| 993575 | Project ID: 993575 DEA: 09388904 EFIS: 0921000042 | 09-MNO-120-19.0/26.5 | CONSTRUCT ASPHALT RUBBER BINDER CHIP SEAL. | MONO COUNTY ABOUT 26.5 MILES WEST OF BENTON FROM 0.9 MILES EAST OF TEST STATION ROAD TO 0.2 MILES EAST OF PILOT SPRINGS ROAD | 08/30/2022 | 1 (02/21/2022) | Details CEM-3701 Report |
| 993665 | Project ID: 993665 DEA: 09386104 EFIS: 0921000035 | 09-MNO-395-R25.8/35.3 | COLD PLANE AC PAVEMENT AND PLACE HMA (TYPE A). | MONO COUNTY ABOUT 2 MILES EAST OF MAMMOTH LAKES FROM THE ROUTE 395/203 SEPARATION BRIDGE TO 1.2 MILES NORTH OF GLASS CREEK ROAD | 12/05/2022 | 1 (03/28/2022) | Details CEM-3701 Report |
| 213193 | Project ID: 213193 DEA: 09357804 | 09-MNO-395-93.4/95.7 | CONSTRUCT SHOULDER WIDENING. | MONO COUNTY ABOUT 18 MILES NORTH OF BRIDGEPORT FROM 0.3 MILE SOUTH OF ROUTE 108 TO 2 MILES NORTH OF ROUTE 108 | 02/14/2022 | 1 (06/23/2021) | Details CEM-3701 Report |
| 995450 | Project ID: 995450 DEA: 09368004 EFIS: 0917000011 | 09-MNO-395-91.6/93.4 | HOT MIX ASPHALT (TYPE A), RAIL ELEMENT WALL, AND ROADWAY EXCAVATION. | MONO COUNTY ABOUT 16 MILES NORTH OF BRIDGEPORT FROM BURCHAM FLAT ROAD TO 0.3 MILE SOUTH OF ROUTE 108 | 04/03/2026 | 1 (01/18/2024) | Details CEM-3701 Report |
| 5428 | Project ID: 5428 DEA: 09341304 EFIS: 0900000130 | 09-MNO-120-35.0/43.0 | COLD FOAM IN-PLACE RECYCLED PAVEMENT AND HOT MIX ASPHALT OVERLAY. | MONO COUNTY ABOUT 15 MILES WEST OF BENTON FROM 4.8 MILES WEST OF DOBIE MEADOWS ROAD TO 0.8 MILE EAST OF RIVER SPRING ROAD | 10/11/2012 | 1 (05/01/2012) | Details CEM-3701 Report |
| 214737 | Project ID: 214737 DEA: 09373004 | 09-MNO-395-30.7,36.5 | PLACE HMA (TYPE A). | MONO COUNTY ABOUT 15 MILES SOUTH OF LEE VINING AT BALD MOUNTAIN ROAD AND AT MAMMOTH SCENIC LOOP ROAD | 01/14/2021 | 1 (01/14/2021) | Details CEM-3701 Report |
| 212231 | Project ID: 212231 DEA: 09364204 | 09-MNO-395-63.3/63.8 | CONSTRUCT LEFT TURN POCKET. | MONO COUNTY ABOUT 12 MILES NORTH OF LEE VINING FROM 5.2 MILES NORTH OF ROUTE 167 TO 6.1 MILES SOUTH OF ROUTE 120. | 06/23/2021 | 1 (06/23/2021) | Details CEM-3701 Report |
| 208965 | Project ID: 208965 DEA: 09354104 EFIS: 0912000023 | 09-MNO-395-63.9/65.1 | COLD IN-PLACE RECYCLED PAVEMENT AND HOTMIX ASPHALT SUPERPAVE OVERLAY. | MONO COUNTY ABOUT 12 MILES NORTH OF LEE VINING FROM 0.4 MILE NORTH TO 1.6 MILES NORTH OF VIRGINIA LAKES ROAD | 09/03/2014 | 1 (07/24/2013) | Details CEM-3701 Report |
