Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5431-5440 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7158 | Project ID: 7158 DEA: 042E5904 EFIS: 0400021217 | 04-SON-12-38.7/41.3 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND OVERLAY WITH HOT MIX ASPHALT. | SONOMA COUNTY FROM 0.1 MILE SOUTH OF NAPA ROAD TO JUNCTION ROUTE 121 | 06/21/2013 | 1 (06/07/2012) | Details CEM-3701 Report |
| 7159 | Project ID: 7159 DEA: 042E6004 EFIS: 0400021172 | 04-SCL-130-15.0/18.7 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND OVERLAY WITH HOT MIX ASPHALT. | SANTA CLARA COUNTY NEAR SAN JOSE FROM 0.8 MILE WEST OF SMITH CREEK TO 1.5 MILES EAST OF KINCAID ROAD | 06/21/2013 | 1 (07/10/2012) | Details CEM-3701 Report |
| 7160 | Project ID: 7160 DEA: 042E6104 EFIS: 0400021203 | 04-ALA-580-0.9/4.5 | SLAB AND HOT MIX ASPHALT REPLACEMENT. | ALAMEDA COUNTY IN AND NEAR TRACY FROM 0.15 MILE WEST OF MIDWAY ROAD UNDERCROSSING TO 1.5 MILES EAST OF NORTH FLYNN ROAD | 09/12/2012 | 1 (07/02/2012) | Details CEM-3701 Report |
| 7161 | Project ID: 7161 DEA: 042L1404 | 04-SM-84-8.3/19.4 | INSTALL CENTERLINE RUMBLE STRIP. | SAN MATEO COUNTY NEAR LA HONDA, SKYLONDA AND IN WOODSIDE FROM PESCADERO ROAD TO TRIPP ROAD. | 11/20/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 7162 | Project ID: 7162 DEA: 042R9904 | 04-ALA-13-10.0/13.2 | COLD PLANE AND PLACE BONDED WEARING COURSE. | ALAMEDA COUNTY IN BERKELEY FROM HILLER DRIVE TO SAN PABLO AVENUE | 04/17/2013 | 1 (04/23/2012) | Details CEM-3701 Report |
| 7163 | Project ID: 7163 DEA: 044A9234 EFIS: 0412000313 | 04-SM-82,101-4.8/19.3,6.6/20.7 | INSTALL TRAFFIC OPERATION SYSTEM INFRASTRUCTURE. | SAN MATEO COUNTY ON ROUTE 82 FROM WHIPPLE AVENUE IN REDWOOD CITY TO ROUTE 380 IN SAN BRUNO AND AT VARIOUS LOCATIONS ON AND ADJACENT TO ROUTE 101 FROM WHIPPLE AVENUE IN REDWOOD CITY TO ROUTE 380 IN SAN BRUNO | 08/22/2018 | 1 (12/11/2012) | Details CEM-3701 Report |
| 7164 | Project ID: 7164 DEA: 060K4204 EFIS: 0600020108 | 06-FRE,MAD-99-Var | REPAIR BRIDGE DECKS AND JOINTS SEALS. | FRESNO AND MADERA COUNTIES AT VARIOUS LOCATIONS | 08/20/2012 | 1 (09/20/2012) | Details CEM-3701 Report |
| 7165 | Project ID: 7165 DEA: 060L2004 EFIS: 0600000294 | 06-MAD-99-23.8/28.2 | CONSTRUCT MEDIAN THRIE BEAM BARRIER. | MADERA COUNTY IN AND NEAR CHOWCHILLA FROM AVENUE 24 OVERCROSSING TO LE GRANDE AVENUE OVERCROSSING | 07/24/2012 | 1 (05/22/2012) | Details CEM-3701 Report |
| 7166 | Project ID: 7166 DEA: 060N2904 EFIS: 0600020501 | 06-KER-202-R1.4/11.9 | PLACE HOT MIX ASPHALT (BONDED WEARING COURSE-GAP GRADED) ON PAVEMENT. | KERN COUNTY IN AND NEAR TEHACHAPI FROM 0.2 MILE WEST OF BEAR VALLEY ROAD TO ROUTE 202/58 SEPARATION | 10/12/2012 | 1 (08/29/2012) | Details CEM-3701 Report |
| 7167 | Project ID: 7167 DEA: 06337414 EFIS: 0600020605 | 06-TUL-190-21.2/26.4 | COLD PLANE AND PLACE HOT MIX ASPHALT ON EXISTING PAVEMENT. | TULARE COUNTY NEAR PORTERVILLE FROM 0.1 MILE EAST OF ROAD 284 TO PLEASANT OAK DRIVE | 06/26/2013 | 1 (08/21/2012) | Details CEM-3701 Report |
