Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5401-5410 of 19037 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213887 | Project ID: 213887 DEA: 024H2604 EFIS: 0218000100 | 02-SIS-97-R11.5/17.1 | COLD PLANE AC, REPLACE AC SURFACING, PLACE AC, RUMBLE STRIP & STRIPE. | SISKIYOU COUNTY ABOUT 12 MILES NORTH OF WEED FROM YELLOW BUTTE ROAD TO 0.6 MILE NORTH OF DEER MOUNTAIN ROAD | 01/04/2021 | 1 (04/03/2019) | Details CEM-3701 Report |
| 7046 | Project ID: 7046 DEA: 010B8504 EFIS: 0112000198 | 01-HUM-101-136.5 | Repair Slide | .6 mile south of Del Norte County | 09/24/2012 | 1 (01/19/2012) | Details CEM-3701 Report |
| 7047 | Project ID: 7047 EFIS: 1100000484 MINOR: 11A1918 | 11--- | 1 (11/01/2010) | Details CEM-3701 Report | |||
| 7048 | Project ID: 7048 DEA: 07293904 EFIS: 0712000254 | 07-LA-60-7.77 | REPLACE BRIDGE (53-3076) and RAMPS, INSTALL ELECTRICAL SYSTEM, OVERHAEAD SIGNS Note, this project started on March 5th and is to be finished on June 10th Please contact the SMR with any questions or concerns | PARAMOUNT BLVD at RTE 60 IN CITY OF MONTEBELLO - bridge Number 53-3076 | 02/22/2013 | 1 (03/19/2012) | Details CEM-3701 Report |
| 7050 | Project ID: 7050 DEA: 023E9104 | 02-TRI,SIS-3,89-32.0/38.0,24.3/34.0 | HMA THIN BLANKET OVERLAY/SEAL COAT W/DIGOUTS | TRINITY AND SISKIYOU COUNTIES ON ROUTE 3 FROM 0.4 MILE SOUTH OF AIRPORT ROAD TO 0.1 MILE NORTH OF RUSH CREEK ROAD AND ON ROUTE 89 FROM 0.5 MILE SOUTH OF BROADWAY AVENUE TO 0.3 MILE SOUTH OF MOUNT SHASTA BOULEVARD | 08/24/2012 | 1 (03/29/2012) | Details CEM-3701 Report |
| 7051 | Project ID: 7051 DEA: 023E9304 | 02-TRI,TRI-299-0.0/0.1,64.0/72.2 | HMA THIN BLANKET OVERLAY WITH DIGOUTS | SHASTA AND TRINITY COUNTIES AT AND NEAR DOUGLAS CITY FROM 0.5 MILE EAST OF LEWISTON ROAD TO 0.1 MILE EAST OF SHASTA COUNTY LINE | 06/21/2013 | 1 (03/29/2012) | Details CEM-3701 Report |
| 7052 | Project ID: 7052 DEA: 031A7344 EFIS: 0300000216 | 03-ED-50-78.9/79.5 | COLD PLANE AND OVERLAY HMA, INSTALL AND MODIFY DRAINAGE INLETS. | EL DORADO COUNTY IN SOUTH LAKE TAHOE FROM 0.2 MILE WEST OF SKI RUN BOULEVARD TO WILDWOOD AVENUE | 10/08/2014 | 1 (03/19/2012) | Details CEM-3701 Report |
| 7053 | Project ID: 7053 DEA: 034M1904 EFIS: 0300020059 | 03-ED,NEV,PLA,YOL-5,16,49,50,80,113-VAR | OVERLAY BRIDGE DECKS WITH POLYESTER CONCRETE. | EL DORADO, NEVADA, PLACER, AND YOLO COUNTIES AT VARIOUS LOCATIONS | 11/21/2014 | 1 (03/05/2012) | Details CEM-3701 Report |
| 7054 | Project ID: 7054 DEA: 044S5504 EFIS: 0400001248 | 04-MRN-101-7.4 | REPLACE FILL WITH LIGHTWEIGHT EMBANKMENT MATERIAL (CELLULAR CONCRETE) | MARIN COUNTY IN CORTE MADERA AT TAMALPAIS DRIVE OVERCROSSING | 09/09/2012 | 1 (04/10/2012) | Details CEM-3701 Report |
| 7055 | Project ID: 7055 DEA: 060E9714 EFIS: 0600020253 | 06-FRE-41-R27.6/R30.4 | REPLACEMENT PLANTING AND IRRIGATION SYSTEM TO BE INSTALLED. | FRESNO COUNTY IN FRESNO FROM ASHLAN AVENUE OVERCROSSING TO HERNDON AVENUE UNDERCROSSING | 04/19/2018 | 1 (06/07/2012) | Details CEM-3701 Report |
