Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 5401-5410 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
7176Project ID: 7176
DEA: 09344204
09-MNO-120-R3.7REHABILITATE BRIDGE DECK.MONO COUNTY ABOUT 9 MILES WEST OF LEE VINING AT DODGE POINT SIDEHILL VIADUCT BRIDGE02/07/20131 (04/09/2012)Details CEM-3701 Report
215536Project ID: 215536
DEA: 09383504
EFIS: 0920000044
09-MNO-395-R40.1/R44.8PLACE HMA OVER EXISTING PAVEMENT.MONO COUNTY ABOUT 7 MILES SOUTH OF LEE VINING FROM 0.2 MILE SOUTH OF ROUTE 158 TO 0.6 MILE NORTH OF LA AQUEDUCT BRIDGE11/30/20211 (06/23/2021)Details CEM-3701 Report
214813Project ID: 214813
DEA: 09380504
09-MNO-395-84.0/88.4,91.6/93.4HOT MIX ASPHALT THIN BLANKET OVERLAY.MONO COUNTY ABOUT 7 MILES NORTH OF BRIDGEPORT FROM 3.0 MILES SOUTH TO 1.4 MILES NORTH OF SWAUGER CREEK ROAD AND FROM BIRCHAM FLAT ROAD TO 0.3 MILE SOUTH OF ROUTE 10801/14/20211 (01/14/2021)Details CEM-3701 Report
7793Project ID: 7793
DEA: 09354504
EFIS: 0912000050
09-MNO-395-40.1/44.9PLACE ASPHALT-RUBBER SEAL COAT ON EXISTING PAVEMENT.MONO COUNTY ABOUT 6 MILES SOUTH OF LEE VINING FROM 0.2 MILE SOUTH OF SOUTH JUNCTION ROUTE 158 TO OLD WEST PORTAL ROAD09/26/20131 (11/19/2012)Details CEM-3701 Report
5408Project ID: 5408
DEA: 09338104
09-MNO-270-0.0/9.8COLD FOAM IN-PLACE RECYCLED PAVEMENT AND HOTMIX ASPHALT SURFACINGMONO COUNTY ABOUT 6 MILES SOUTH OF BRIDGEPORT FROM ROUTE 395 TO 9.8 MILES EAST OF ROUTE 39509/22/20111 (01/05/2012)Details CEM-3701 Report
213608Project ID: 213608
DEA: 09364704
09-MNO-395-60.0/69.9CONSTRUCT MIDWEST GUARD RAIL.MONO COUNTY ABOUT 6 MILES SOUTH OF BRIDGEPORT FROM CONWAY RANCH ROAD TO ROUTE 27012/02/20191 (01/03/2019)Details CEM-3701 Report
994330Project ID: 994330
DEA: 09366404
EFIS: 0916000006
09-MNO-395-58.2/60.4HOT MIX ASPHALT (TYPE A), IMPORTED BORROW, AND ROADWAY EXCAVATION.MONO COUNTY ABOUT 6 MILES NORTH OF LEE VINING FROM ROUTE 167 TO 0.4 MILE NORTH OF CONWAY RANCH ROAD07/23/20251 (07/31/2023)Details CEM-3701 Report
212343Project ID: 212343
DEA: 09346704
09-MNO-395-58.2CONSTRUCT RIGHT TURN LANE.MONO COUNTY ABOUT 6 MILES NORTH OF LEE VINING AT ROUTE 16710/09/20181 (03/27/2018)Details CEM-3701 Report
993610Project ID: 993610
DEA: 09389004
EFIS: 0921000039
09-MNO-182-R6.4/12.6COLD PLANE AC PAVEMENT AND PLACE HMA (TYPE A).MONO COUNTY ABOUT 6 MILES EAST OF BRIDGEPORT FROM 0.2 MILE NORTH OF EAST WALKER RIVER BRIDGE TO THE NEVADA STATE LINE11/01/20221 (12/20/2023)Details CEM-3701 Report
993575Project ID: 993575
DEA: 09388904
EFIS: 0921000042
09-MNO-120-19.0/26.5CONSTRUCT ASPHALT RUBBER BINDER CHIP SEAL.MONO COUNTY ABOUT 26.5 MILES WEST OF BENTON FROM 0.9 MILES EAST OF TEST STATION ROAD TO 0.2 MILES EAST OF PILOT SPRINGS ROAD08/30/20221 (02/21/2022)Details CEM-3701 Report