Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5311-5320 of 19037 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6922 | Project ID: 6922 DEA: 080P7804 EFIS: 0800020030 | 08-RIV-79-0.0/3.0,R15.8/R19.2 | REPLACE AC SURFACING, COLD PLANE AND PLACE RUBBERIZED HOT MIX ASPHALT | RIVERSIDE COUNTY NEAR AGUANGA AND HOMELAND FROM SAN DIEGO COUNTY LINE TO 0.7 MILE NORTH OF ROUTE 371 SEPARATION AND FROM 0.1 MILE SOUTH OF DOMINIGONI PARKWAY TO ROUTE 74 SEPARATION | 10/18/2012 | 1 (10/18/2012) | Details CEM-3701 Report |
| 6923 | Project ID: 6923 DEA: 09347804 | 09-MNO-167-0.0/10.0 | HOT MIX ASPHALT OVERLAY. | MONO COUNTY NEAR LEE VINING FROM ROUTE 395 TO 10.0 MILES EAST OF ROUTE 395 | 02/07/2013 | 1 (01/16/2012) | Details CEM-3701 Report |
| 6924 | Project ID: 6924 DEA: 11077604 EFIS: 1100000739 | 11-SD-5-R36.3/R37.4 | SPECIAL PORTLAND CEMENT CONCRETE GRIND FOR NOISE REDUCTION | SAN DIEGO COUNTY IN SAN DIEGO AND SOLANA BEACH FROM VIA DE LA VALLE UNDERCROSSING TO LOMAS SANTA FE DRIVE UNDERCROSSING | 09/18/2012 | 1 (09/20/2012) | Details CEM-3701 Report |
| 6926 | Project ID: 6926 EFIS: 0800000140 Permit Numbers: 0811NMC0823 | 08-RIV-15-13/14.3 | Enter onto Interstate 15 right-of-way at Clinton Keith Road Interchange in Wildomar area, to reconstruct the interchange including but not limited to re-align the freeway ramps, widen the overcrossing bridge, construct retaining walls, landscape and signal | Interstate 15, Wildomar | 09/13/2014 | 1 (03/12/2012) | Details CEM-3701 Report |
| 213888 | Project ID: 213888 DEA: 024H2704 EFIS: 0218000101 | 02-SHA-44-34.0/43.2 | PLACE HMA (TYPE A) OVERLAY. | SHASTA COUNTY AT AND NEAR VIOLA FROM 0.2 MILE EAST OF MILL CREEK ROAD TO 0.8 MILE EAST OF DEER FLAT ROAD | 12/04/2019 | 1 (04/03/2019) | Details CEM-3701 Report |
| 6931 | Project ID: 6931 DEA: 042L1904 EFIS: 0400000858 MINOR: 04A3687 | 04-MRN-131-2.1 | Install Flashing Beacon and In Roadway Warning Lights | In Tiburon At Stewart Dr. | 01/13/2025 | 1 (11/08/2019) | Details CEM-3701 Report |
| 6933 | Project ID: 6933 DEA: 01498704 EFIS: 0100000696 | 01-DN-101-15.4/20.5 | BONDED WEARING COURSE AND REPLACE ASPHALT CONCRETE SURFACING | DEL NORTE COUNTY NEAR CRESCENT CITY FROM 2.9 MILES NORTH OF WILSON CREEK ROAD TO 0.2 MILES NORTH OF MILL CREEK PARK ENTRANCE | 09/14/2012 | 1 (06/27/2012) | Details CEM-3701 Report |
| 6934 | Project ID: 6934 DEA: 060J5204 EFIS: 0600000187 | 06-KER-119-4.7/8.5 | SHOULDER WIDENING AND HMA OVERLAY. | KERN COUNTY NEAR TAFT FROM 0.2 MILE WEST OF AIRPORT ROAD TO 0.3 MILE WEST OF LAKEVIEW WASH BRIDGE | 05/03/2013 | 1 (09/12/2012) | Details CEM-3701 Report |
| 6935 | Project ID: 6935 DEA: 060L2204 EFIS: 0600000295 | 06-KER-5-69.6/73.1 | INSTALL SINGLE AND DOUBLE THRIE-BEAM MEDIAN BARRIER AND RUMBLE STRIP. | KERN COUNTY NEAR LOST HILLS FROM MAIN DRAIN ROAD OVERCROSSING TO ROUTE 46/5 SEPARATION | 06/15/2012 | 1 (03/15/2012) | Details CEM-3701 Report |
| 6936 | Project ID: 6936 DEA: 060M7604 EFIS: 0600020011 | 06-FRE,MAD-99-Var | INSTALL VEHICLE DETECTION SYSTEM. | FRESNO AND MADERA COUNTIES AT VARIOUS LOCATIONS | 03/13/2013 | 1 (06/24/2012) | Details CEM-3701 Report |
