Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5191-5200 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6845 | Project ID: 6845 DEA: 080E4104 EFIS: 0800000082 | 08-RIV-10-R24.0/R24.3 | WIDENING, REPAIR BRIDGE DECK AND UPGRADE BRIDGE RAILING. | RIVERSIDE COUNTY NEAR CABAZON FROM 4.8 MILES EAST OF MAIN STREET TO 1.0 MILE WEST OF 10/111 SEPARATION | 01/29/2015 | 1 (08/21/2012) | Details CEM-3701 Report |
| 6846 | Project ID: 6846 DEA: 080K1504 | 08-SBD-15-70.6/74.9 | COLD PLANE AND OVERLAY | SAN BERNARDINO COUNTY IN AND NEAR BARSTOW FROM 0.5 MILE NORTH OF ROUTE 15/58 SEPARATION TO EAST MAIN STREET UNDERCROSSING | 11/26/2013 | 1 (12/05/2011) | Details CEM-3701 Report |
| 6847 | Project ID: 6847 DEA: 080P9304 | 08-SBD-247-8.5/22.1,68.6/76.0 | PLACE SEAL COAT | SAN BERNARDINO COUNTY NEAR LANDERS FROM TRACY BOULEVARD TO MANNING ROAD AND FROM CHUCKWAGON ROAD TO THE CITY LIMIT OF BARSTOW | 03/22/2013 | 1 (05/14/2012) | Details CEM-3701 Report |
| 6848 | Project ID: 6848 DEA: 09348004 EFIS: 0900020095 | 09-INY-190-96.8/111.6 | HOT MIX ASPHALT OVERLAY. | INYO COUNTY IN DEATH VALLEY NATIONAL PARK AT AND NEAR FURNACE CREEK FROM 3.6 MILES EAST OF NORTH HIGHWAY TO 0.1 MILE WEST OF BADWATER ROAD | 03/21/2013 | 1 (03/15/2012) | Details CEM-3701 Report |
| 6849 | Project ID: 6849 DEA: 11298404 EFIS: 1100000416 | 11-SD-54,125-5.3/6.4,9.2/9.7 | INSTALL CONCRETE BARRIER. | SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 54 FROM 0.3 MILE EAST OR BRIARWOOD ROAD OVERCROSSING TO 0.4 MILE EAST OF SWEETWATER ROAD UNDERCROSSING AND ON ROUTE 125 FROM 0.5 MILE WEST OF ELKELTON PLACE UNDERCROSSING TO ELKELTON PLACE UNDERCROSSING | 11/01/2012 | 1 (11/07/2012) | Details CEM-3701 Report |
| 6850 | Project ID: 6850 DEA: 120L6404 EFIS: 1200020104 | 12-ORA-1-23.7/25.9 | RUBBERIZED HOT MIX ASPHALT OVERLAY | ORANGE COUNTY IN HUNTINGTON BEACH FROM BEACH BOULEVARD TO GOLDENWEST STREET | 05/29/2013 | 1 (07/22/2012) | Details CEM-3701 Report |
| 6853 | Project ID: 6853 DEA: 042L2304 EFIS: 0400000862 MINOR: 04A3713 | 04-SOL-121-6.7 | Install lighting standards type 21D and Type 30. | 06/08/2020 | 1 (10/30/2019) | Details CEM-3701 Report | |
| 6855 | Project ID: 6855 DEA: 112M02A4 | 11-SD-5,54,75,94,125,805,905-VAR | Clean and Treat Bridge Deck with Methacrylate and Repalce Seals | Various Locations | 06/25/2012 | 1 (10/06/2011) | Details CEM-3701 Report |
| 6858 | Project ID: 6858 DEA: 043A7734 Permit Numbers: 0412NRT0901 0412NRT0913 0411NDP1529 0410NMC0139 | 04-CC--0/5 | The purpose of the I-80 Integrated Corridor Mobility (ICM) Traffic Signal Light Synchronization project (TLSP) is to assist in monitoring, and managing the traffic flow along the I-80 and State Route 123 corridor. | I-80 AND SR 123, Var | 08/16/2013 | 1 (12/21/2012) | Details CEM-3701 Report |
| 6860 | Project ID: 6860 DEA: 04448834 EFIS: 0400021235 | 04-SCL-152-6.1/6.5 | PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM | SANTA CLARA COUNTY IN GILROY FROM 0.3 MILE WEST OF UVAS CREEK BRIDGE TO 0.1 MILE EAST OF UVAS CREEK BRIDGE | 08/21/2018 | 1 (05/09/2012) | Details CEM-3701 Report |
