Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 5191-5200 of 19344 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
212663Project ID: 212663
DEA: 041J0204
EFIS: 0414000127
04-NAP,SON-12,101,116,121,128-VarPLACE HIGH FRICTION SURFACE TREATMENT.NAPA AND SONOMA COUNTIES AT VARIOUS LOCATIONS01/16/20191 (01/22/2018)Details CEM-3701 Report
6842Project ID: 6842
DEA: 04264144
EFIS: 0400002023
04-NAP,SOL-12-2.8/3.3,0.0/2.6WIDEN ROUTE 12 FROM A TWO-LANE TO A FOUR-LANE CONVENTIONAL HIGHWAYNAPA AND SOLANO COUNTIES FROM 0.5 MILE WEST OF NAPA COUNTY LINE TO RED TOP ROAD12/22/20161 (02/21/2012)Details CEM-3701 Report
1918Project ID: 1918
DEA: 041E4004
04-NAP,SOL-29,128-VarPLACE POLYESTER CONCRETE AND TREAT BRIDGE DECK WITH METHACRYLATE.NAPA AND SOLANO COUNTIES AT VARIOUS LOCATIONS04/30/20121 (05/18/2012)Details CEM-3701 Report
7439Project ID: 7439
DEA: 041E40A4
04-NAP-29-PLACE POLYESTER CONCRETE AND TREAT BRIDGE DECK WITH METHACRYLATE.NAPA AND SOLANO COUNTIES AT VARIOUS LOCATIONS02/01/20161 (05/18/2012)Details CEM-3701 Report
210340Project ID: 210340
DEA: 044H8104
EFIS: 0413000283
04-NAP,SOL-29,121,37,80,780-VarTREAT BRIDGE DECKS WITH METHACRYLATE AND REPLACE JOINT SEALS.NAPA AND SOLANO COUNTIES AT VARIOUS LOCATIONS11/07/20161 (06/22/2015)Details CEM-3701 Report
1000098Project ID: 1000098
DEA: 043Y5404
EFIS: 0423000259
04-NAP,SOL-12,29,80,113,121,etc.-VarREPLACE PAVEMENT DELINEATION.NAPA AND SOLANO COUNTIES AT VARIOUS LOCATIONS11/14/20251 (06/03/2024)Details CEM-3701 Report
209201Project ID: 209201
DEA: 043E5504
EFIS: 0412000390
04-NAP,SOL-29,80-11.6,1.8SPOT BLAST CLEAN AND PAINT ALL STEEL ELEMENTS.NAPA AND SOLANO COUNTIES AT FIRST STREET OVERCROSSING AND MAGAZINE STREET OVERCROSSING06/23/20161 (03/04/2014)Details CEM-3701 Report
209661Project ID: 209661
DEA: 044H1404
EFIS: 0413000093
MINOR: 04A4471
04-NAP-128-18.5The work involves removing damaged sections of a CMP arch culvert, welding headed studs to the existing corrugation peaks, and then welding wire fabric to those studs. Finally, structural concrete is placed to create a new, smooth, invert.Nap-128-18.5, Soda Creek, Br. No 21-0062.06/08/20201 (06/09/2014)Details CEM-3701 Report
211437Project ID: 211437
Permit Numbers: 04166DP0808 0415NSN2526
04-MRN-1-0.4/0.4Modify traffic signal for the intersection of the highway and Tennessee Valley Road including installation of traffic signal heads and rewiringna, na01/21/2019NOT VERIFIEDDetails CEM-3701 Report
786Project ID: 786
Permit Numbers: 0309NMC0073
03-SUT-99-30.26/30.55Landscape, Drainage and Street LightingN/A, Yuba City09/17/2014NOT VERIFIEDDetails CEM-3701 Report