Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 511-520 of 17400 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
212575Project ID: 212575
DEA: 060G9804
EFIS: 0613000022
06-TUL-65-31.6/39.6REPAIR FAILED AREAS, COLD IN PLACE RECYCLING AND RESURFACE WITH RHMA.TULARE COUNTY IN AND NEAR EXETER FROM ROUTE 137 TO ROUTE 19806/19/20191 (04/24/2018)Details CEM-3701 Report
215711Project ID: 215711
DEA: 060U2704
EFIS: 0615000295
06-TUL-99-6.2/12.8REPLACE BRIDGE SIDEWALKS, CONCRETE BARRIERS AND BRIDGE RAILINGS.TULARE COUNTY IN AND NEAR EARLIMART AT VARIOUS LOCATIONS FROM AVENUE 48 OVERCROSSING TO AVENUE 100 OVERCROSSING10/03/20221 (05/03/2021)Details CEM-3701 Report
211826Project ID: 211826
DEA: 060P5904
EFIS: 0612000182
06-TUL-190-4.1/4.8INTERSECTION IMPROVEMENT, DRAINAGE SWALES, BASIN AND LIGHTING.TULARE COUNTY FROM 0.4 MILE WEST OF ROAD 152 TO 0.7 MILE WEST OF ROAD 16008/23/20181 (05/03/2017)Details CEM-3701 Report
6843Project ID: 6843
DEA: 060E0704
EFIS: 0600020126
06-TUL-99-19.8/25.0WIDEN SHOULDERS, CRACK, SEAT AND OVERLAY SOUTHBOUND WITH HMA AND RHMA.TULARE COUNTY FROM 0.3 MILE NORTH OF AVENUE 152 OVERCROSSING TO ELK BAYOU BRIDGE05/31/20131 (02/27/2012)Details CEM-3701 Report
3201Project ID: 3201
DEA: 060G9304
06-TUL-65,99,137,190,198,216-VarCONSTRUCT CONCRETE CURB RAMPS AND MODIFY SIGNAL AND LIGHTING.TULARE COUNTY AT VARIOUS LOCATIONS04/27/20111 (04/27/2011)Details CEM-3701 Report
3293Project ID: 3293
DEA: 060K4404
06-TUL-65,99,137,198-VarSEAL BRIDGE DECKS WITH METHACRYLATE, REPLACE JOINT AND CHIP SEALS.TULARE COUNTY AT VARIOUS LOCATIONS12/13/20121 (02/28/2011)Details CEM-3701 Report
214843Project ID: 214843
DEA: 060X6704
EFIS: 0618000229
06-TUL-63,65,99,190,198-VarREPLACE BRIDGE DECK WITH POLYESTER CONCRETE OVERLAY & PLACE CONCRETE.TULARE COUNTY AT VARIOUS LOCATIONS07/15/20211 (04/20/2020)Details CEM-3701 Report
215555Project ID: 215555
DEA: 061A9804
EFIS: 0620000145
06-TUL-65,190,198,245-VarCOLD PLANE AND REPLACE WITH HMA AND RESURFACE WITH CHIP SEAL.TULARE COUNTY AT VARIOUS LOCATIONS08/07/20231 (03/10/2021)Details CEM-3701 Report
209146Project ID: 209146
DEA: 06471504
EFIS: 0600000464
COOP: 061549
06-TUL-99-39.6/41.3RECONSTRUCT INTERCHANGE WITH NEW PUMPING PLANT.TULARE COUNTY AT GOSHEN FROM 0.9 MILE NORTH OF ROUTE 99/198 WEST SEPARATION TO 0.2 MILE NORTH OF NORTH GOSHEN OVERHEAD03/03/20201 (10/08/2013)Details CEM-3701 Report
209069Project ID: 209069
DEA: 060N3904
EFIS: 0600020698
06-TUL-245-20.8CONSTRUCT ROCK SLOPE PROTECTION.TULARE COUNTY ABOUT 10 MILES SOUTH OF BADGER AT COTTONWOOD CREEK BRIDGE08/06/20151 (10/15/2014)Details CEM-3701 Report