Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 5141-5150 of 18885 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 704 | Project ID: 704 DEA: 024C8404 | 02-SHA-5713- | CONSTRUCT NEW OFFICE /CREW BUILDING | 12/23/2010 | 1 (04/06/2009) | Details CEM-3701 Report | |
| 959 | Project ID: 959 DEA: 031F4304 | 03-SAC-5736- | CONSTRUCT NEW OFFICE AND CREW BUILDING | SACRAMENTO COUNTY IN SACRAMENTO AT THE NORTHGATE MAINTENANCE STATION AT 3940 ROSIN COURT | 07/27/2012 | 1 (05/09/2011) | Details CEM-3701 Report |
| 1147 | Project ID: 1147 DEA: 033E4404 | 03-GLE-5734- | CONSTRUCT NEW OFFICE AND CREW BUILDING. | GLENN COUNTY IN WILLOWS AT THE WILLOWS MAINTENANCE STATION AT 939 NORTH HUMBOLDT AVENUE | 02/16/2012 | 1 (05/09/2011) | Details CEM-3701 Report |
| 3359 | Project ID: 3359 DEA: 060M4004 | 06-KER-5703- | CONSTRUCT NEW OFFICE BUILDING. | KERN COUNTY AT BODFISH AT THE BODFISH MAINTENANCE STATION AT 3115 KERN RIVER CANYON ROAD | 08/24/2012 | 1 (10/10/2011) | Details CEM-3701 Report |
| 6871 | Project ID: 6871 EFIS: 0000001155 Permit Numbers: 0511NDP0554 | 05-SLO-101-56.7/57.9 | Construct new On-Ramp & widen and modify ramps & stripe Paso Robles On-Ramps (per Coop. Agreement 05-0238 on 1/19/2010 for EA 05-361503)Restripe SR-46 to provide WB traffic with dual left turn lanes from US 101 intersection to east edge of Salinas | US-101& SR-46E, El Paso de Robles | 11/11/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 4745 | Project ID: 4745 EFIS: 0000001155 Permit Numbers: 08086DP1081 0807NMC1251 | 08-RIV-91-10.056-10.806 | CONSTRUCT NEW OVERHEAD SIGNS AND FOUNDATION AT RIVERWALK PARKWAY | Route 91 in Riverside City | 07/15/2009 | 2 (07/15/2009) | Details CEM-3701 Report |
| 214701 | Project ID: 214701 DEA: 030F2844 EFIS: 0319000204 | 03-SAC-99-7.1/9.4 | Construct new PCC precast girder bridge over UPRR at McConnell OH between existing SB and NB alignments | 11/27/2023 | 1 (04/20/2020) | Details CEM-3701 Report | |
| 7724 | Project ID: 7724 EFIS: 0000001155 Permit Numbers: 0510NRP0690 05136DP0123 | 05-SB-135-10.6/10.9 | Construct new public road intersection (eastern leg), Union Valley Parkway, east of Highway 135 | Union Valley Parkway, Santa Maria | 09/18/2018 | 1 (02/08/2013) | Details CEM-3701 Report |
| 5273 | Project ID: 5273 DEA: 08452204 | 08-RIV-15-64.4/65.5 | CONSTRUCT NEW RAMP, WIDEN BRIDGE & MAGNOLIA AVE | Riverside County, City of Corona, on I-15 at Magnolia Ave. | 06/05/2014 | 1 (12/20/2010) | Details CEM-3701 Report |
| 5524 | Project ID: 5524 EFIS: 0000001155 Permit Numbers: 1007NMC0669 10086DP0495 | 10-AMA-88-22.69/22.69 | Construct new right turn lane, lengthen storage of left turn, modify existing signal and loops, as shown on the attached plans and electrical specifications, within State Highway 88 right of way at Ridge Road in the Town of Pine Grove in Amador County. T | SR88 @ Ridge Road, Pine Grove | 02/24/2014 | NOT VERIFIED | Details CEM-3701 Report |
